Melola Discovery

← Melola Discovery

Jurnal

KAJIAN PENGEMBANGAN SISTEM TENAGA LISTRIK KOTA KENDARI PROVINSI SULAWESI TENGGARA

Jurnal Perencanaan Wilayah · Vol. 3 No. 1 (2019)

DOI
10.33772/jpw.v3i1.7432
ISSN
2502-4205
Published
2019-06-30
Publisher
Universitas Halu Oleo
Language
eng

Abstract

This study aimed to (1) analyze the future needs for electricity in Kendari city in the sectors ofhousehold, commerce, public, and industry; (2) analyze the capaity of power plant than can serve the whole cityof Kendari today: and (3) analyze the plan for developing electricity in Kendari city based on Rencana TataRuang Wiayah Kota Kendari (RTRW) 2010-2030. The study was conducted by analyzing electrical needs invarious sector of electricity consumers in Kendari city, the capacity of electricity power plant that servedKendari city in 2015, and the plan for developing electricity in Kendari city as well as the spatial plan forKendari city in the RTRW of Kendari city for 2010-2030. Based on the results of data processing and analysis,it could be concluded that (1) the needs for electricity in Kendari City will increase from year to year in 2016-2025. Ranked from the largest to the smallest, the needs for electricity in Kendari City were in the followingsectors: households, business, public, industry, and special services, and the total consumption of electricity inKendari City in 2025 is 575.96 GWh and the needs for power is 156.5 MW; (2) The existing power plant (85,4MW) will only be able to serve the city until 2017. In 2018, PLN have to build new power plants, complete theconstruction of PLTU, or revitalize non-functional power plants. New power plants with a capacity of 33.8 MWto the minimum will be needed within a period from 2022 to 2025; (3) The plan for constructing new powerplant in the subdistrict of Abeli and creating a new network in the subdistricts of Abeli, Poasia, Baruga, Kambu,Wua-Wua, Kadia, and Puuwatu as stated in RTRW of Kendari City for 2010-2030 is considered correct, sincethe needs for electricity in those areas will continue to grow with the developement in industry, warehouse,redinteal areas with high density, residential areas with medium density, business areas, and office complex.KeywordS: electricity need, capacity of power plant

Collaboration network of the authors

40 authors · 151 co-authorship links · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Halu Oleo
  • Institut Agama Islam Negeri Kendari
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Aminur AminurUniversitas Halu Oleo5
La HasanudinUniversitas Halu Oleo5
Kadir KadirAffiliation unknown4
Al Ichlas ImranAffiliation unknown4
Ridway BalakaAffiliation unknown4
Adris Ade PutraAffiliation unknown4
Abd KadirUniversitas Halu Oleo3
Salimin SaliminAffiliation unknown3
Luther PagilingAffiliation unknown2
Indrayati GaluguAffiliation unknown2
Tachrir TachrirAffiliation unknown2
Yuspian GunawanAffiliation unknown2
Muslimin Makkaraeng SikkiAffiliation unknown1
M. NatsirAffiliation unknown1
Risnawati RisnawatiInstitut Agama Islam Negeri Kendari1
Weka WidayatiAffiliation unknown1
Lukman YunusAffiliation unknown1
Machmuddin MachmuddinAffiliation unknown1
Sahabuddin HayUniversitas Halu Oleo1
Sahrul HusuAffiliation unknown1
Yuni Aryanu KoedoesAffiliation unknown1
La HasanuddinAffiliation unknown1
Samhuddin SamhuddinAffiliation unknown1
La Ode Amrul HasanAffiliation unknown1
Wardi WardiAffiliation unknown1
Mansur MansurAffiliation unknown1
Bunyamin BunyaminAffiliation unknown1
Muhammad Nadzirin Anshari NurAffiliation unknown1
Gamal Abdul NasserAffiliation unknown1
Samuel JieAffiliation unknown1
Abdul DjoharAffiliation unknown1
Muh. FatwarizaldiAffiliation unknown1
Laode YuslinAffiliation unknown1
Laode SaefuddinAffiliation unknown1
Adnal AdnalAffiliation unknown1
Wa Ode Siti Nur AlamAffiliation unknown1
Ahmad RoykhanAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/ppw/oai, first harvested 30 Okt 2026, last seen 1 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">KAJIAN PENGEMBANGAN SISTEM TENAGA LISTRIK KOTA KENDARI PROVINSI SULAWESI TENGGARA</dc:title>
	<dc:creator>Lolok, Agustinus</dc:creator>
	<dc:creator>Magribi, La Ode Muh.</dc:creator>
	<dc:creator>Musarudin, Mustarum</dc:creator>
	<dc:description xml:lang="en-US">This study aimed to (1) analyze the future needs for electricity in Kendari city in the sectors ofhousehold, commerce, public, and industry; (2) analyze the capaity of power plant than can serve the whole cityof Kendari today: and (3) analyze the plan for developing electricity in Kendari city based on Rencana TataRuang Wiayah Kota Kendari (RTRW) 2010-2030. The study was conducted by analyzing electrical needs invarious sector of electricity consumers in Kendari city, the capacity of electricity power plant that servedKendari city in 2015, and the plan for developing electricity in Kendari city as well as the spatial plan forKendari city in the RTRW of Kendari city for 2010-2030. Based on the results of data processing and analysis,it could be concluded that (1) the needs for electricity in Kendari City will increase from year to year in 2016-2025. Ranked from the largest to the smallest, the needs for electricity in Kendari City were in the followingsectors: households, business, public, industry, and special services, and the total consumption of electricity inKendari City in 2025 is 575.96 GWh and the needs for power is 156.5 MW; (2) The existing power plant (85,4MW) will only be able to serve the city until 2017. In 2018, PLN have to build new power plants, complete theconstruction of PLTU, or revitalize non-functional power plants. New power plants with a capacity of 33.8 MWto the minimum will be needed within a period from 2022 to 2025; (3) The plan for constructing new powerplant in the subdistrict of Abeli and creating a new network in the subdistricts of Abeli, Poasia, Baruga, Kambu,Wua-Wua, Kadia, and Puuwatu as stated in RTRW of Kendari City for 2010-2030 is considered correct, sincethe needs for electricity in those areas will continue to grow with the developement in industry, warehouse,redinteal areas with high density, residential areas with medium density, business areas, and office complex.KeywordS: electricity need, capacity of power plant</dc:description>
	<dc:publisher xml:lang="en-US">Universitas Halu Oleo</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2019-06-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/ppw/article/view/7432</dc:identifier>
	<dc:identifier>10.33772/jpw.v3i1.7432</dc:identifier>
	<dc:source xml:lang="en-US">Jurnal Perencanaan Wilayah; Vol 3, No 1 (2018)</dc:source>
	<dc:source>2502-4205</dc:source>
	<dc:source>10.33772/jpw.v3i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/ppw/article/view/7432/5429</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2019 Jurnal Perencanaan Wilayah</dc:rights>
</oai_dc:dc>