The loading tanks is the main component of a tanker that must be properly prepared and thoroughly inspected before loading and unloading operations. Inadequate attention during these stages may cause residues, rags, or waste materials to remain inside the tank, obstruct cargo flow, and result in operational delays. This study aims to analyze the loading tank preparation process, the implementation of tank inspections, and the obstacles that affect the smooth operation of loading and unloading activities on MT. Dian Dina. This research employed a descriptive qualitative method. Data were collected through direct observation, interviews with the First Officer, Bosun, and Able Seaman, documentation, and literature studies. The data were analyzed through data collection, condensation, presentation, and conclusion drawing stages, while data validity was tested using source, technique, and time triangulation. The results showed that the loading tank preparation was carried out in accordance with the company’s Standard Operating Procedure (SOP), including work planning, work team formation, tank ventilation, gas freeing, tank cleaning, drying, tank condition inspection, and inspection of cargo handling systems consisting of cargo lines, cargo pumps, valves, manifolds, and cargo pump filters. However, the final inspection was not fully optimal because rags and waste materials were still found in the bottom areas and corners of the tank that were difficult to access. These foreign materials were carried by the cargo flow and caused blockage of the cargo pump filter, resulting in delays during loading and unloading operations. Improvement efforts were carried out through multi-level inspections, recording and controlling work equipment, increasing supervision during tank cleaning activities, and conducting evaluations after completion. The implementation of these measures is important to ensure tank cleanliness and readiness while minimizing the risk of operational disruptions.
Bahasa Indonesia
Tangki muat merupakan komponen utama pada kapal tanker yang harus dipersiapkan dan diperiksa secara menyeluruh sebelum kegiatan bongkar muat. Ketidaktelitian pada tahap tersebut dapat menyebabkan residu, majun, atau sampah tertinggal di dalam tangki, menghambat aliran muatan, dan menimbulkan keterlambatan operasional. Penelitian ini bertujuan untuk menganalisis proses persiapan tangki muat, pelaksanaan pemeriksaan tangki, serta kendala yang memengaruhi kelancaran bongkar muat di MT. Dian Dina. Penelitian menggunakan metode deskriptif kualitatif. Data diperoleh melalui observasi langsung, wawancara dengan Mualim I, Bosun, dan Able Seaman, dokumentasi, serta studi kepustakaan. Data dianalisis melalui tahap pengumpulan, kondensasi, penyajian, dan penarikan kesimpulan, sedangkan keabsahan data diuji menggunakan triangulasi sumber, teknik, dan waktu. Hasil penelitian menunjukkan bahwa persiapan tangki muat telah dilaksanakan sesuai Standard Operating Procedure perusahaan, meliputi penyusunan rencana kerja, pembentukan kelompok kerja, melakukan ventilasi tangki,pelaksanaan gas freeing, pelaksanaan tank cleaning, melaksanaan pengeringan, pemeriksaan kondisi tangki, serta pengecekan cargo line, cargo pump, valve, manifold, dan filter cargo pump. Namun, pemeriksaan akhir belum optimal karena masih ditemukan majun dan sampah pada dasar serta sudut tangki yang sulit dijangkau. Benda asing tersebut terbawa aliran muatan dan menyumbat filter cargo pump sehingga proses bongkar muat mengalami keterlambatan. Perbaikan dilakukan melalui pemeriksaan berlapis, pencatatan dan penghitungan peralatan kerja, peningkatan pengawasan selama tank cleaning, serta evaluasi setelah kegiatan. Penerapan langkah tersebut penting untuk memastikan kebersihan dan kesiapan tangki serta meminimalkan risiko gangguan operasional.