The problem explored in this study is the decrease of the hydraulic pressure that occurred in the hydraulic windlass system, so that the operation of the anchor heave-up is not optimal. The windlass must have enough hydraulic pressure to properly hoist anchor chain and anchor. This study examined the reasons for the decrease in hydraulic windlass pump pressure and the corrective actions which were made by the crew to correct the issue. The approach taken in doing the research was descriptive qualitative. The author's sea-practice period was on board MV. Talent Blu was collected by direct observation, interviewing with one Chief Engineer (KKM), and Three Engineers/Masinists, and documentation. The results showed that both contamination and blockage of the hydraulic filter and leakage in the hydraulic hose pipe/piping system were to blame for the loss of hydraulic windlass pressure. The clogged filter reduced hydraulic oil flow and leakage in the oil led to oil loss and lowered hydraulic oil pressure and flow to the hydraulic motor. This caused the lifting speed to reduce and the windlass to give poor performance. The corrective actions were the following: stop operation, depressurize hydraulic system, inspect and clean/change filter, repair/replace leaky hose pipe/piping, check hydraulic oil level, add 25 liters of hydraulic oil, and run system test post repair. The results also provide guidance on enhancements to the Planned Maintenance System (PMS) namely regular checking on filter, hose pipes/piping, hydraulic pressure, hydraulic oil level and condition as well as availability of spare parts to speed up repair when failure occurs.
Inggris
The problem explored in this study is the decrease of the hydraulic pressure that occurred in the hydraulic windlass system, so that the operation of the anchor heave-up is not optimal. The windlass must have enough hydraulic pressure to properly hoist anchor chain and anchor. This study examined the reasons for the decrease in hydraulic windlass pump pressure and the corrective actions which were made by the crew to correct the issue. The approach taken in doing the research was descriptive qualitative. The author's sea-practice period was on board MV. Talent Blu was collected by direct observation, interviewing with one Chief Engineer (KKM), and Three Engineers/Masinists, and documentation. The results showed that both contamination and blockage of the hydraulic filter and leakage in the hydraulic hose pipe/piping system were to blame for the loss of hydraulic windlass pressure. The clogged filter reduced hydraulic oil flow and leakage in the oil led to oil loss and lowered hydraulic oil pressure and flow to the hydraulic motor. This caused the lifting speed to reduce and the windlass to give poor performance. The corrective actions were the following: stop operation, depressurize hydraulic system, inspect and clean/change filter, repair/replace leaky hose pipe/piping, check hydraulic oil level, add 25 liters of hydraulic oil, and run system test post repair. The results also provide guidance on enhancements to the Planned Maintenance System (PMS) namely regular checking on filter, hose pipes/piping, hydraulic pressure, hydraulic oil level and condition as well as availability of spare parts to speed up repair when failure occurs.