Abstract

The electrical load required in an electricity sub-system changes every day. Electric power operators must be able to generate and distribute electricity according to consumer needs. In the Sulawesi sub-system, the power plants used are still dominated by fossil fuel generators, so that in their operations, fuel requirements need to be given serious attention. Planning a good daily electricity consumption is needed so that the fuel cost becomes optimal. In the current condition, the load forecasting for the Daily Load Operation Plan (ROH) is still based on Expert Judgment, which is different for each forecaster. With a fairly large error tolerance limit of 4%. We need a load forecasting instrument capable of better error tolerance. Forecasting methods such as ARIMA, SARIMA and ARIMAX have been used for many years. In recent years, several artificial intelligence techniques such as Neural Network and machine learning have been developed for time series analysis. And recently, more accurate forecasting results are shown by Artificial Neural Network (ANN) and Recurrent Neural Network (RNN) compared to traditional forecasting methods. Long Short Term Memory (LSTM) is a model of RNN that uses past data (Long Term) to predict current data (Short Term). Electric load in Sulawesi subsystem used as data training after normalized using min-max normalization. The LSTM model is made with different data input. Forecasting performance of each model is then evaluated based on the RMSE and MAPE values. Of the several data input models, forecasting models with daily data input show better performance than other scenarios. The MAPE and RMSE values obtained were 2.384% and 33.95, respectively.

Collaboration network of the authors

40 authors · 90 co-authorship links · 4 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Institut Teknologi Sepuluh Nopember
  • Universitas Muhammadiyah Malang
  • University of Brawijaya
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Chastine FatichahInstitut Teknologi Sepuluh Nopember8
Agus Zainal ArifinInstitut Teknologi Sepuluh Nopember6
Apriantoni ApriantoniInstitut Teknologi Sepuluh Nopember4
Rizka Wakhidatus SholikahInstitut Teknologi Sepuluh Nopember2
Yudhi PurwanantoInstitut Teknologi Sepuluh Nopember2
Fahrur RoziInstitut Teknologi Sepuluh Nopember2
Hilya TsaniyaInstitut Teknologi Sepuluh Nopember2
Nanik SuciatiInstitut Teknologi Sepuluh Nopember2
Khoirul UmamInstitut Teknologi Sepuluh Nopember1
Fidi Wincoko PutroInstitut Teknologi Sepuluh Nopember1
Gulpi Qorik Oktagalu PratamasunuAffiliation unknown1
Khadijah Fahmi Hayati HolleInstitut Teknologi Sepuluh Nopember1
Arif FadllullahInstitut Teknologi Sepuluh Nopember1
Dasrit Debora KamudiInstitut Teknologi Sepuluh Nopember1
Muhamad NasirInstitut Teknologi Sepuluh Nopember1
Dhian KartikaAffiliation unknown1
Umi Laili YuhanaInstitut Teknologi Sepuluh Nopember1
Daniel SiahaanInstitut Teknologi Sepuluh Nopember1
Dian SaputraAffiliation unknown1
Esti YuniarAffiliation unknown1
Febriliyan SamopaInstitut Teknologi Sepuluh Nopember1
Ade AfrianAffiliation unknown1
Yos NugrohoAffiliation unknown1
Putu Utami Andarini S.Affiliation unknown1
Indra LukmanaAffiliation unknown1
Daniel SwanjayaAffiliation unknown1
Arrie KurniawardhaniAffiliation unknown1
Mohamed QuafafouAffiliation unknown1
Nur HayatinUniversitas Muhammadiyah Malang1
Rizal Setya PerdanaUniversity of Brawijaya1
Joko Lianto BulialiInstitut Teknologi Sepuluh Nopember1
Tsabbit Aqdami MukhtarInstitut Teknologi Sepuluh Nopember1
Christian Sri Kusuma AdityaInstitut Teknologi Sepuluh Nopember1
Mamluatul Hani’ahAffiliation unknown1
Ridho Rahman HariadiInstitut Teknologi Sepuluh Nopember1
Siska ArifianiInstitut Teknologi Sepuluh Nopember1
Hadziq FabroyirInstitut Teknologi Sepuluh Nopember1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://juti.if.its.ac.id/index.php/juti/oai, first harvested 26 Okt 2026, last seen 26 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">LOAD FORECASTING FOR DAILY LOAD OPERATIONAL PLAN USING LSTM (CASE STUDY: SOUTH SULAWESI SUB SYSTEM)</dc:title>
	<dc:creator xml:lang="en">Raharjo, Agus Budi</dc:creator>
	<dc:creator xml:lang="en">Wakhid, Muhammad Abdul</dc:creator>
	<dc:creator xml:lang="en">Purwitasari, Diana</dc:creator>
	<dc:description xml:lang="en">The electrical load required in an electricity sub-system changes every day. Electric power operators must be able to generate and distribute electricity according to consumer needs. In the Sulawesi sub-system, the power plants used are still dominated by fossil fuel generators, so that in their operations, fuel requirements need to be given serious attention. Planning a good daily electricity consumption is needed so that the fuel cost becomes optimal. In the current condition, the load forecasting for the Daily Load Operation Plan (ROH) is still based on Expert Judgment, which is different for each forecaster. With a fairly large error tolerance limit of 4%. We need a load forecasting instrument capable of better error tolerance. Forecasting methods such as ARIMA, SARIMA and ARIMAX have been used for many years. In recent years, several artificial intelligence techniques such as Neural Network and machine learning have been developed for time series analysis. And recently, more accurate forecasting results are shown by Artificial Neural Network (ANN) and Recurrent Neural Network (RNN) compared to traditional forecasting methods. Long Short Term Memory (LSTM) is a model of RNN that uses past data (Long Term) to predict current data (Short Term). Electric load in Sulawesi subsystem used as data training after normalized using min-max normalization. The LSTM model is made with different data input. Forecasting  performance of each model is then evaluated based on the RMSE and MAPE values. Of the several data input models, forecasting models with daily data input show better performance than other scenarios. The MAPE and RMSE values obtained were 2.384% and 33.95, respectively.</dc:description>
	<dc:publisher xml:lang="en">Institut Teknologi Sepuluh Nopember</dc:publisher>
	<dc:date>2022-07-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://juti.if.its.ac.id/index.php/juti/article/view/1138</dc:identifier>
	<dc:identifier>10.12962/j24068535.v20i2.a1138</dc:identifier>
	<dc:source xml:lang="en">JUTI: Jurnal Ilmiah Teknologi Informasi; Vol. 20, No. 2, July 2022; 99-108</dc:source>
	<dc:source>2406-8535</dc:source>
	<dc:source>1412-6389</dc:source>
	<dc:source>10.12962/j24068535.v20i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://juti.if.its.ac.id/index.php/juti/article/view/1138/478</dc:relation>
</oai_dc:dc>