Akses terbuka
Jurnal
Tanpa peringkat SINTA
Peningkatan Produktivitas dengan Relayout Area Produksi di UKM Keripik Tempe (Studi Kasus di UKM Suka Nicky, Banjarnegara)
JIA (Jurnal Ilmiah Agribisnis) : Jurnal Agribisnis dan Ilmu Sosial Ekonomi Pertanian · Vol. 5 No. 6 (2020) · hlm. 199–206
ISSN 2527-273X
Terbit 2020-12-31
Penerbit Department of Agribusiness, Halu Oleo University
Bahasa eng
Abstrak
SMEs are required to continue to make continuous improvements to increase productivity. One alternative that can be done is to re-layout the facilities and production areas. The main purpose of this research is to identify an increase in productivity with the proposed re-layout. Layout planning is carried out using the ARC (Activity Relations Chart) approach, the area requirements of each production facility, and the limitations of SMEs. From the results of the research conducted from January until March 2020, it is known that the proposed re-layout can improve material handling efficiency in Suka Nicky. Originally 219.75 meters which were taken in 148.5 minutes turned into 194.65 meters with a time of 117.5 minutes. With the decrease in distance and material handling time, the hope is that it can reduce the operational costs of SMEs.
Jaringan kolaborasi para penulis
4 penulis ·
5 tautan kepenulisan bersama
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Jenderal Soedirman University
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulis Organisasi Artikel bersama
Ratna Satriani Jenderal Soedirman University 2
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.
Sumber metadata: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/JIA/oai, pertama di-harvest 31 Okt 2026, terakhir terlihat 15 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en-US">Peningkatan Produktivitas dengan Relayout Area Produksi di UKM Keripik Tempe (Studi Kasus di UKM Suka Nicky, Banjarnegara)</dc:title>
<dc:creator>Hidayat, Hety Handayani</dc:creator>
<dc:creator>Wijayanti, Nur</dc:creator>
<dc:creator>Prasetyo, Arif</dc:creator>
<dc:subject xml:lang="en-US">activity relationship chart; efficiency; re-layout</dc:subject>
<dc:description xml:lang="en-US">SMEs are required to continue to make continuous improvements to increase productivity. One alternative that can be done is to re-layout the facilities and production areas. The main purpose of this research is to identify an increase in productivity with the proposed re-layout. Layout planning is carried out using the ARC (Activity Relations Chart) approach, the area requirements of each production facility, and the limitations of SMEs. From the results of the research conducted from January until March 2020, it is known that the proposed re-layout can improve material handling efficiency in Suka Nicky. Originally 219.75 meters which were taken in 148.5 minutes turned into 194.65 meters with a time of 117.5 minutes. With the decrease in distance and material handling time, the hope is that it can reduce the operational costs of SMEs.</dc:description>
<dc:publisher xml:lang="en-US">Department of Agribusiness, Halu Oleo University</dc:publisher>
<dc:contributor xml:lang="en-US"></dc:contributor>
<dc:date>2020-12-31</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://ojs.uho.ac.id/index.php/JIA/article/view/14994</dc:identifier>
<dc:identifier>10.37149/jia.v5i6.14994</dc:identifier>
<dc:source xml:lang="en-US">JIA (Jurnal Ilmiah Agribisnis) : Jurnal Agribisnis dan Ilmu Sosial Ekonomi Pertanian; Vol 5, No 6 (2020); 199 - 206</dc:source>
<dc:source>2527-273X</dc:source>
<dc:source>10.37149/jia.v5i6</dc:source>
<dc:language>eng</dc:language>
<dc:relation>https://ojs.uho.ac.id/index.php/JIA/article/view/14994/pdf</dc:relation>
<dc:relation>https://ojs.uho.ac.id/index.php/JIA/article/downloadSuppFile/14994/2075</dc:relation>
<dc:relation>https://ojs.uho.ac.id/index.php/JIA/article/downloadSuppFile/14994/2365</dc:relation>
<dc:rights xml:lang="en-US">Copyright (c) 2020 JIA (Jurnal Ilmiah Agribisnis) : Jurnal Agribisnis dan Ilmu Sosial Ekonomi Pertanian</dc:rights>
<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>
Sitasi dan pengindeksan
Jumlah menurut tiap indeks pada 7 Nov 2026; setiap indeks menghitung sitasi dengan cara berbeda.
OpenAlex juga mencatat karya ini di: crossref.
Sitasi artikel ini
APA 7
Hidayat, H. H., Wijayanti, N., & Prasetyo, A. (2020). Peningkatan Produktivitas dengan Relayout Area Produksi di UKM Keripik Tempe (Studi Kasus di UKM Suka Nicky, Banjarnegara). JIA (Jurnal Ilmiah Agribisnis) : Jurnal Agribisnis dan Ilmu Sosial Ekonomi Pertanian, 5(6), 199–206. https://doi.org/10.37149/jia.v5i6.14994
Salin
IEEE
H. H. Hidayat, N. Wijayanti, and A. Prasetyo, “Peningkatan Produktivitas dengan Relayout Area Produksi di UKM Keripik Tempe (Studi Kasus di UKM Suka Nicky, Banjarnegara),” JIA (Jurnal Ilmiah Agribisnis) : Jurnal Agribisnis dan Ilmu Sosial Ekonomi Pertanian, vol. 5, no. 6, pp. 199–206, 2020, doi: 10.37149/jia.v5i6.14994.
Salin
Dibuat dari metadata jurnal; periksa nama penulis sebelum dipakai.