Melola Discovery

← Melola Discovery

Jurnal

SURVEY PEMETAAN BIDANG TANAH DALAM PELAKSANAAN PEMBANGUNAN RUANG JAMUAN MAKAN BENDUNGAN LADONGI KOLAKA TIMUR

Media Konstruksi : Jurnal Ilmiah Teknik Sipil · Vol. 5 No. 2 (2020)

DOI
10.33772/jmk.v5i2.24149
ISSN
2503-2712
Published
2020-07-01
Publisher
PRODI D3 TEKNIK SIPIL
Language
eng

Abstract

Abstract This research is a research study conducted at Ladongi Kolaka Dam east of Southeast Sulawesi that aims to know the procedures or methods of measuring mapping surveys conducted in the Banquet Room of Ladongi Dam.From the results of the research at Ladongi Dam East Kolaka that based on the results and conclusions drawn, the survey and mapping method to determine the location of the starting point of the construction of the banquet hall using bm2 point as the initial benchmark in the work of the banquet room Ladongi dam. Related to the above conclusions in the measurement of stake out using the nearest points namely BM1 and BM2. The working method of measuring stakeout with coordinates (X, Y, Z) uses COORDINATES BM1 X = 376943.427, Y = 9541136.940, Z = 82.570 and coordinates BM2 X = 376501.725, Y = 9541066.163, Z = 80.539. Abstrak Penelitian ini merupakan studi penelitian yang dilakukan di Bendungan Ladongi Kolaka Timur Sulawesi Tenggara yang bertujuan untuk mengetahui tata cara atau metode pengukuruan survey pemetaan yang dilakukan pada Ruang Jamuan Makan Bendungan Ladongi.Dari hasil penelitian di Bendungan Ladongi Kolaka Timur bahwa berdasarkan hasil dan kesimpulan yang ditarik yaitu, metode survey dan pemetaan untuk menentukan lokasi titik awal pembangunan ruang jamuan makan dengan menggunakan titik BM2 sebagai patokan awal dalam pekerjaan ruang jamuan makan bendungan Ladongi. Terkait kesimpulan di atas dalam pengukuran stake out dengan menggunakan titik terdekat yakni BM1 dan BM2. Metode kerja pengukuran stakeout dengan koordinat (X, Y, Z) menggunakan koordinat BM1 X = 376943.427, Y = 9541136.940, Z = 82.570 dan koordinat BM2 X = 376501.725, Y = 9541066.163, Z = 80.539.

Collaboration network of the authors

40 authors · 153 co-authorship links · 8 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Halu Oleo
  • Universitas Sembilanbelas November Kolaka
  • Universitas Sulawesi Tenggara
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
La WelendoAffiliation unknown5
sulha sulhaAffiliation unknown5
Siti Nurjanah AhmadUniversitas Halu Oleo4
Baso MursidiAffiliation unknown4
ARMAN FASLIHAffiliation unknown4
Fathur Rahman RustanUniversitas Sembilanbelas November Kolaka4
Fitriah Mas'udAffiliation unknown4
Mappa NashrunAffiliation unknown4
Ridwan Syah NuhunUniversitas Halu Oleo3
Muhammad Syarif PrasetiaAffiliation unknown3
Nasrul NasrulUniversitas Halu Oleo3
St Nawal JayaUniversitas Halu Oleo3
Umran SaritaAffiliation unknown3
Weko Indira RomantiauliaAffiliation unknown2
Ranno Marlany RachmanAffiliation unknown2
Mappa NasrunAffiliation unknown2
La Ode Muhammad Nurrakhmad ArsyadAffiliation unknown2
Statiswaty StatiswatyUniversitas Halu Oleo2
Putri RamadhaniUniversitas Halu Oleo2
Asrullah TondasiUniversitas Halu Oleo2
Ishak KadirUniversitas Halu Oleo2
Halim HalimUniversitas Halu Oleo2
Wayan MustikaAffiliation unknown2
Gede Agus SutrayasaUniversitas Halu Oleo1
Laode DenyUniversitas Halu Oleo1
Kadir RamadanUniversitas Halu Oleo1
Galih Adi SulistyoUniversitas Halu Oleo1
Jalba NirahUniversitas Halu Oleo1
La ode Muhammad FadilUniversitas Halu Oleo1
Dhalmaz PrasetyaUniversitas Halu Oleo1
Dwi Bayu Putra PUniversitas Halu Oleo1
Muhammad Alfian AliUniversitas Halu Oleo1
Hado HadoUniversitas Sulawesi Tenggara1
Ismayana IsmayanaUniversitas Halu Oleo1
Meri AprianiUniversitas Halu Oleo1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/MedKons/oai, first harvested 31 Okt 2026, last seen 31 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">SURVEY PEMETAAN BIDANG TANAH DALAM PELAKSANAAN PEMBANGUNAN RUANG JAMUAN MAKAN BENDUNGAN LADONGI KOLAKA TIMUR</dc:title>
	<dc:creator>Darmawan, Diki</dc:creator>
	<dc:creator>Arsyad, La Ode Muhamad Nurrakhmad</dc:creator>
	<dc:creator>Asraf, Asraf</dc:creator>
	<dc:creator>Soeparyanto, Try Sugiyarto</dc:creator>
	<dc:creator>Ikhsan, Ainussalbi Al</dc:creator>
	<dc:description xml:lang="en-US"> Abstract This research is a research study conducted at Ladongi Kolaka Dam east of Southeast Sulawesi that aims to know the procedures or methods of measuring mapping surveys conducted in the Banquet Room of Ladongi Dam.From the results of the research at Ladongi Dam East Kolaka that based on the results and conclusions drawn, the survey and mapping method to determine the location of the starting point of the construction of the banquet hall using bm2 point as the initial benchmark in the work of the banquet room Ladongi dam. Related to the above conclusions in the measurement of stake out using the nearest points namely BM1 and BM2. The working method of measuring stakeout with coordinates (X, Y, Z) uses COORDINATES BM1 X = 376943.427, Y = 9541136.940, Z = 82.570 and coordinates BM2 X = 376501.725, Y = 9541066.163, Z = 80.539.  Abstrak Penelitian ini merupakan studi penelitian yang dilakukan di Bendungan Ladongi Kolaka Timur Sulawesi Tenggara yang bertujuan untuk mengetahui tata cara atau metode pengukuruan survey pemetaan yang dilakukan pada Ruang Jamuan Makan Bendungan Ladongi.Dari hasil penelitian di Bendungan Ladongi Kolaka Timur bahwa berdasarkan hasil dan kesimpulan yang ditarik yaitu, metode survey dan pemetaan untuk menentukan lokasi titik awal pembangunan ruang jamuan makan dengan menggunakan titik BM2 sebagai patokan awal dalam pekerjaan ruang jamuan makan bendungan Ladongi. Terkait kesimpulan di atas dalam pengukuran stake out dengan menggunakan titik terdekat yakni BM1 dan BM2. Metode kerja pengukuran stakeout  dengan koordinat (X, Y, Z) menggunakan koordinat BM1 X = 376943.427, Y = 9541136.940, Z = 82.570 dan koordinat BM2 X = 376501.725, Y = 9541066.163, Z = 80.539. </dc:description>
	<dc:publisher xml:lang="en-US">PRODI D3 TEKNIK SIPIL</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2020-07-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/MedKons/article/view/24149</dc:identifier>
	<dc:identifier>10.33772/jmk.v5i2.24149</dc:identifier>
	<dc:source xml:lang="en-US">Media Konstruksi : Jurnal Ilmiah Teknik Sipil; Vol 5, No 2 (2020): MedKons</dc:source>
	<dc:source>2503-2712</dc:source>
	<dc:source>10.33772/jmk.v5i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/MedKons/article/view/24149/14485</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2022 MEDIA KONSTRUKSI</dc:rights>
</oai_dc:dc>