Melola Discovery

← Melola Discovery

Jurnal

PERHITUNGAN PRODUKTIFITAS PEMAKAIAN ALAT BERAT PADA KEGIATAN PENATAAN HALAMAN PARKIR TERMINAL TIPE B KAB. BUTON UTARA

Media Konstruksi : Jurnal Ilmiah Teknik Sipil · Vol. 4 No. 1 (2019)

DOI
10.33772/jmk.v4i1.27211
ISSN
2503-2712
Published
2019-04-01
Publisher
PRODI D3 TEKNIK SIPIL
Language
eng

Abstract

Abstract In an effort to achieve the results of good construction work there are several supporting elements, one of which is using heavy equipment assistance. This study aims to determine the volume and productivity costs of the machine in the Buton Terminal B Parking Lot Yard Arrangement work on landfill work items, As for the heavy equipment examined in this study were excavators, whell loaders, dump trucks, motor graders, and vibrator rollers. This research methodology uses data collection methods that through observation and surveys are then matched with date that has been obtained in advance such as the capacity of the tool, the price of the unit of equipment, and other data relating to the tool used at the job site. The results of this study indicate that the volume of landfill work is 2608,18 m3, with heavy equipment rental prices of Rp.172.274.375,00. This work uses 1 excavators unit to work for 24,22 hours with a tool rental fee of Rp.13.623.750,00. 1 unit of whell loader works for 65,72 hours with a tool rental fee of Rp.36.936.380,12. 6 dump truck units work for 69,30 hours with equipment rental costs of Rp.64.994.721,12. 1 motor grader unit works for 97,65 hours with a tool rental fee of Rp.54.928.125,00. 1 vibrator roller unit works for 29,56 hours with heavy equipment rental costs of Rp.14.780.000,00. Abstrak Dalam usaha pencapaian hasil pekerjaan kontruksi yang baik terdapat beberapa elemen yang mendukung, Salah satunya adalah menggunakan bantuan alat berat, Penelitian ini bertujuan untuk mengetahui volume dan biaya produktifitas alat berat pada pekerjaan Penataan Halaman Parkir Terminal Tipe B Kabupaten Buton Utara pada item pekerjaan timbunan tanah, adapun alat berat yang diteliti pada penelitian ini yaitu excavator, whell loader, dump truck, motor grader, dan vibrator roller. Metodologi penelitian ini menggunakan metode pengumpulan data yang melalui pengamatan dan survey kemudian dicocokan dengan data-data yang sudah diperoleh terlebih dahulu seperti kapasitas alat, harga satuan peralatan, dan data-data lain yang berhubungan dengan alat yang digunakan di lokasi pekerjaan.Hasil penelitian ini menunjukan bahwa volume pekerjaan timbunan tanah yaitu 2608,18 m3, dengan harga sewa alat berat sebesar Rp.172.274.375,00 Pekerjaan ini menggunakan 1 unit excavator bekerja selama 24,22 jam dengan biaya sewa alat sebesar Rp.13.623.750,00. 1 unit whell loader bekerja selama 65,72 jam dengan biaya sewa alat sebesar Rp.36.936.380,12. 6 unit dump truck bekerja selama 69,30 jam dengan biaya sewa alat sebesar Rp.64.994.721,12. 1 unit motor grader bekerja selama 97,65 jam dengan biaya sewa alat sebesar Rp.54.928.125,00. 1 unit vibrator roller bekerja selama 29,56 jam dengan biaya sewa alat berat sebesar Rp.14.780.000,00.

Collaboration network of the authors

40 authors · 157 co-authorship links · 11 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Halu Oleo
  • Universitas Islam Negeri Ar-Raniry
  • Universitas Sembilanbelas November Kolaka
  • Universitas Sulawesi Tenggara
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Umran SaritaAffiliation unknown11
Wayan MustikaAffiliation unknown7
Fitriah FitriahUniversitas Islam Negeri Ar-Raniry6
Siti Nurjanah AhmadUniversitas Halu Oleo5
Anafi MinmahddunUniversitas Halu Oleo5
Baso MursidiAffiliation unknown4
Romy TalanipaUniversitas Halu Oleo3
La Ode Muhamad Nurrakhmad ArsyadUniversitas Halu Oleo3
La WelendoAffiliation unknown3
Romy S. E. TamburakaAffiliation unknown3
Nasrul NasrulUniversitas Halu Oleo2
Masdiana MasdianaUniversitas Halu Oleo2
Fathur Rahman RustanUniversitas Sembilanbelas November Kolaka2
Try Sugiyarto SoeparyantoUniversitas Halu Oleo2
Muriadin MuriadinUniversitas Halu Oleo2
Muh Thahir AzikinAffiliation unknown2
RIdwansyah NuhunAffiliation unknown2
Try SugiyartoAffiliation unknown1
Adrianto YusufAffiliation unknown1
Muhammad Handy Dwi AdityawanAffiliation unknown1
Tuti AlawiaAffiliation unknown1
Muhammad Reza RidwanAffiliation unknown1
Erich Nov Putra RazakAffiliation unknown1
Rismon RismonAffiliation unknown1
Fitriah Mas'udAffiliation unknown1
Milasari MilasariAffiliation unknown1
Sultan Machmud Hasan MasikkiAffiliation unknown1
Evy YusufAffiliation unknown1
Randa PratamaUniversitas Sulawesi Tenggara1
Laode Mulia RasiAffiliation unknown1
Farid DarmawanAffiliation unknown1
Aloysius A.P. MangiriAffiliation unknown1
Aprijal Mukti LalumbuAffiliation unknown1
Juprianto JupriantoAffiliation unknown1
Idul Adha Zulhijja AhmadAffiliation unknown1
Sitti Kosma AsmatunAffiliation unknown1
Ferdinal FerdinalAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/MedKons/oai, first harvested 31 Okt 2026, last seen 31 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">PERHITUNGAN PRODUKTIFITAS PEMAKAIAN ALAT BERAT  PADA KEGIATAN PENATAAN HALAMAN PARKIR TERMINAL TIPE B  KAB. BUTON UTARA</dc:title>
	<dc:creator>Azman, Azman</dc:creator>
	<dc:creator>Sulha, Sulha</dc:creator>
	<dc:creator>Mangiri, Aloysius A. Prima</dc:creator>
	<dc:description xml:lang="en-US"> Abstract In an effort to achieve the results of good construction work there are several supporting elements, one of which is using heavy equipment assistance. This study aims to determine the volume and productivity costs of the machine in the Buton Terminal B Parking Lot Yard Arrangement work on landfill work items, As for the heavy equipment examined in this study were excavators, whell loaders, dump trucks, motor graders, and vibrator rollers. This research methodology uses data collection methods that through observation and surveys are then matched with date that has been obtained in advance such as the capacity of the tool, the price of the unit of equipment, and other data relating to the tool used at the job site. The results of this study indicate that the volume of landfill work is 2608,18 m3, with heavy equipment rental prices of Rp.172.274.375,00. This work uses 1 excavators unit to work for 24,22 hours with a tool rental fee of Rp.13.623.750,00. 1 unit of whell loader works for 65,72 hours with a tool rental fee of Rp.36.936.380,12. 6 dump truck units work for 69,30 hours with equipment rental costs of Rp.64.994.721,12. 1 motor grader unit works for 97,65 hours with a tool rental fee of Rp.54.928.125,00. 1 vibrator roller unit works for 29,56 hours with heavy equipment rental costs of Rp.14.780.000,00.  Abstrak Dalam usaha pencapaian hasil pekerjaan kontruksi yang baik terdapat beberapa elemen yang mendukung, Salah satunya adalah menggunakan bantuan alat berat, Penelitian ini bertujuan untuk mengetahui volume dan biaya produktifitas alat berat pada pekerjaan Penataan Halaman Parkir Terminal Tipe B Kabupaten Buton Utara pada item pekerjaan timbunan tanah, adapun alat berat yang diteliti pada penelitian ini yaitu excavator, whell loader, dump truck, motor grader, dan vibrator roller. Metodologi penelitian ini menggunakan metode pengumpulan data yang melalui pengamatan dan survey kemudian dicocokan dengan data-data yang sudah diperoleh terlebih dahulu seperti kapasitas alat, harga satuan peralatan, dan data-data lain yang berhubungan dengan alat yang digunakan di lokasi pekerjaan.Hasil penelitian ini menunjukan bahwa volume pekerjaan timbunan tanah yaitu 2608,18 m3, dengan harga sewa alat berat sebesar Rp.172.274.375,00 Pekerjaan ini menggunakan 1 unit excavator bekerja selama 24,22 jam dengan biaya sewa alat sebesar Rp.13.623.750,00. 1 unit whell loader bekerja selama 65,72 jam dengan biaya sewa alat sebesar Rp.36.936.380,12. 6 unit   dump truck bekerja selama 69,30 jam dengan biaya sewa alat sebesar Rp.64.994.721,12. 1 unit motor grader bekerja selama 97,65 jam dengan biaya sewa alat sebesar Rp.54.928.125,00. 1 unit vibrator roller bekerja selama 29,56 jam dengan biaya sewa alat berat sebesar Rp.14.780.000,00. </dc:description>
	<dc:publisher xml:lang="en-US">PRODI D3 TEKNIK SIPIL</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2019-04-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/MedKons/article/view/27211</dc:identifier>
	<dc:identifier>10.33772/jmk.v4i1.27211</dc:identifier>
	<dc:source xml:lang="en-US">Media Konstruksi : Jurnal Ilmiah Teknik Sipil; Vol 4, No 1 (2019): MedKons</dc:source>
	<dc:source>2503-2712</dc:source>
	<dc:source>10.33772/jmk.v4i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/MedKons/article/view/27211/15856</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2022 MEDIA KONSTRUKSI</dc:rights>
</oai_dc:dc>