ANALISIS PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN PASAR ANDOOLO UTAMA KEC. BUKE KAB. KONAWE SELATAN

Media Konstruksi : Jurnal Ilmiah Teknik Sipil · Vol. 8 No. 3 (2023) · pp. 145–154

DOI
10.33772/jmk.v8i3.42946
ISSN
2503-2712
Published
2023-10-30
Publisher
PRODI D3 TEKNIK SIPIL
Language
eng
License
creativecommons.org/licenses/by/4.0

Abstract

Abstract Project success is influenced by several factors, namely cost, quality, and time. Therefore, an integrated cost and schedule control system is needed so that the monitored parameters can show the exact condition of the project. Eraned Value Method is a method that compares the work that has been completed with the budget provided so that it is known if there is a deviation. This study aims to determine whether the implementation of the project deviates in terms of cost or time. This research uses the Eraned Value Method. The data obtained in this study are RAB, time schedule, and weekly progress reports. This control uses 3 indicators, namely BCWS, BCWP, and ACWP, then analyzes the variant assessment and performance index and estimates the final completion of the project on cost and time. The results of the Earned Value Method analysis obtained until the last week the value of BCWP BCWS and ACWP = BCWP. For the last week's value CV= Rp.0 and CPI= 1,000 and SV= –Rp.602,802,280.76 and SPI= 0.933. The estimated cost for the remaining work (ETC) is Rp.0 and the estimated project completion time (EAS) is 29 weeks. This cost on the project is within the planned budget but has a deviation on the planned schedule which is for 1 week from the planned time of 28 weeks. Abstrak Keberhasilan proyek dipengaruhi beberapa faktor yakni biaya, mutu, dan waktu. Karena itu diperlukan sistem pengendalian biaya dan jadwal terpadu agar parameter yang dipantau dapat menunjukkan dengan tepat kondisi proyek. Eraned Value Method merupakan metode yang membandingkan pekerjaan yang telah diselesaikan dengan anggaran yang disediakan sehingga diketahui bila terjadi penyimpangan. Peneleitian ini bertujuan mengetahui apakah pelaksanaan proyek terjadi penyimpangan baik dari segi biaya atau waktu. Penelitian ini menggunakan Eraned Value Method. Data-data yang diperoleh dalam penelitian ini RAB, time schedule, dan laporan progress mingguan. Pengendalian ini menggunakan 3 indikator yakni BCWS, BCWP, dan ACWP kemudian dianalisis penilaian varian dan indeks kinerja serta perkiraan penyelesaian akhir proyek pada biaya dan waktu. Hasil analisis Earned Value Method diperoleh hingga minggu terakhir nilai BCWP BCWS dan ACWP = BCWP. Untuk nilai minggu terakhir CV= Rp.0 serta CPI= 1,000 dan SV= –Rp.602.802.280,76 serta SPI= 0,933. Perkiraan biaya untuk pekerjaan tersisa (ETC) sebesar Rp.0 dan perkiraan waktu penyelesaian akhir proyek (EAS) adalah 29 minggu. Hal ini biaya pada proyek sesuai anggaran yang direncanakan namun mengalami penyimpangan pada jadwal yang direncanakan yakni selama 1 minggu dari waktu yang direncanakan 28 minggu.

Collaboration network of the authors

40 authors · 131 co-authorship links · 5 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Halu Oleo
  • Universitas Sembilanbelas November Kolaka
  • Sekolah Tinggi Teknologi Ronggolawe Cepu
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Ahmad Syarif SukriUniversitas Halu Oleo8
Ranno Marlany RachmanAffiliation unknown8
Romy TalanipaUniversitas Halu Oleo7
Fathur Rahman RustanUniversitas Sembilanbelas November Kolaka5
Wayan MustikaAffiliation unknown3
Edward NgiiUniversitas Halu Oleo3
Rudi BalakaUniversitas Halu Oleo3
Baso MursidiAffiliation unknown3
Anafi MinmahddunUniversitas Halu Oleo2
Reska Angjella MustarifAffiliation unknown2
Muriadin MuriadinUniversitas Halu Oleo2
Ramjan RamjanAffiliation unknown2
Romi TalanipaAffiliation unknown2
sulha sulhaAffiliation unknown2
La WelendoAffiliation unknown2
Ainul Fatayaatis SalaamahSekolah Tinggi Teknologi Ronggolawe Cepu1
Yuni Ikasari Arif RidangkaAffiliation unknown1
Wa Ode Melinda AmeliaAffiliation unknown1
Romy Suryaningrat Edwin TamburakaAffiliation unknown1
Ikmal IkmalUniversitas Halu Oleo1
Layori LayoriAffiliation unknown1
Muhammad SidiqAffiliation unknown1
Masykur KimsanAffiliation unknown1
Jefryanto LondongsaluAffiliation unknown1
Takdir TakdirAffiliation unknown1
Rano Marlany RachmanAffiliation unknown1
Lian ArsitaAffiliation unknown1
Erik AstrawanAffiliation unknown1
Salfin Adrian SyarifAffiliation unknown1
Yana ImbrawatiAffiliation unknown1
Muhammad Rabiul BahriAffiliation unknown1
Try Sugiyarto SoeparyantoUniversitas Halu Oleo1
Ahrun NasarAffiliation unknown1
Renaldi RenaldiAffiliation unknown1
Uniadi MangidiAffiliation unknown1
Mayura AdityaAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/MedKons/oai, first harvested 31 Okt 2026, last seen 1 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">ANALISIS PENGENDALIAN BIAYA DAN WAKTU PADA PROYEK PEMBANGUNAN PASAR ANDOOLO UTAMA KEC. BUKE KAB. KONAWE SELATAN</dc:title>
	<dc:creator>Musdalifah, Uchi</dc:creator>
	<dc:creator>Putri, Tryantini Sundi</dc:creator>
	<dc:creator>Sriyani, Rini</dc:creator>
	<dc:creator>Adityawan, Muh. Handy Dwi</dc:creator>
	<dc:subject xml:lang="en-US"></dc:subject>
	<dc:description xml:lang="en-US">Abstract
Project success is influenced by several factors, namely cost, quality, and time. Therefore, an integrated cost and schedule control system is needed so that the monitored parameters can show the exact condition of the project. Eraned Value Method is a method that compares the work that has been completed with the budget provided so that it is known if there is a deviation. This study aims to determine whether the implementation of the project deviates in terms of cost or time. This research uses the Eraned Value Method. The data obtained in this study are RAB, time schedule, and weekly progress reports. This control uses 3 indicators, namely BCWS, BCWP, and ACWP, then analyzes the variant assessment and performance index and estimates the final completion of the project on cost and time. The results of the Earned Value Method analysis obtained until the last week the value of BCWP  BCWS and ACWP = BCWP. For the last week's value CV= Rp.0 and CPI= 1,000 and SV= –Rp.602,802,280.76 and SPI= 0.933. The estimated cost for the remaining work (ETC) is Rp.0 and the estimated project completion time (EAS) is 29 weeks. This cost on the project is within the planned budget but has a deviation on the planned schedule which is for 1 week from the planned time of 28 weeks.

Abstrak
Keberhasilan proyek dipengaruhi beberapa faktor yakni biaya, mutu, dan waktu. Karena itu diperlukan sistem pengendalian biaya dan jadwal terpadu agar parameter yang dipantau dapat menunjukkan dengan tepat kondisi proyek. Eraned Value Method merupakan metode yang membandingkan pekerjaan yang telah diselesaikan dengan anggaran yang disediakan sehingga diketahui bila terjadi penyimpangan. Peneleitian ini bertujuan mengetahui apakah pelaksanaan proyek terjadi penyimpangan baik dari segi biaya atau waktu. Penelitian ini menggunakan Eraned Value Method. Data-data yang diperoleh dalam penelitian ini RAB, time schedule, dan laporan progress mingguan. Pengendalian ini menggunakan 3 indikator yakni BCWS, BCWP, dan ACWP kemudian dianalisis penilaian varian dan indeks kinerja serta perkiraan penyelesaian akhir proyek pada biaya dan waktu. Hasil analisis Earned Value Method diperoleh hingga minggu terakhir nilai BCWP  BCWS dan ACWP = BCWP. Untuk nilai minggu terakhir CV= Rp.0 serta CPI= 1,000 dan SV= –Rp.602.802.280,76 serta SPI= 0,933. Perkiraan biaya untuk pekerjaan tersisa (ETC) sebesar Rp.0 dan perkiraan waktu penyelesaian akhir proyek (EAS) adalah 29 minggu. Hal ini biaya pada proyek sesuai anggaran yang direncanakan namun mengalami penyimpangan pada jadwal yang direncanakan yakni selama 1 minggu dari waktu yang direncanakan 28 minggu.</dc:description>
	<dc:publisher xml:lang="en-US">PRODI D3 TEKNIK SIPIL</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2023-10-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/MedKons/article/view/42946</dc:identifier>
	<dc:identifier>10.33772/jmk.v8i3.42946</dc:identifier>
	<dc:source xml:lang="en-US">Media Konstruksi : Jurnal Ilmiah Teknik Sipil; Vol 8, No 3 (2023); 145-154</dc:source>
	<dc:source>2503-2712</dc:source>
	<dc:source>10.33772/jmk.v8i3</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/MedKons/article/view/42946/19226</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Media Konstruksi : Jurnal Ilmiah Teknik Sipil</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>