Melola Discovery

← Melola Discovery

Jurnal

ANALISIS TINGKAT RESIKO KECELAKAAN KERJA PADA PEKERJAAN CABLE STAYED (Studi Kasus: Proyek Pembangunan Jembatan Teluk Kendari)

Media Konstruksi : Jurnal Ilmiah Teknik Sipil · Vol. 5 No. 1 (2020)

DOI
10.33772/jmk.v5i1.24094
ISSN
2503-2712
Published
2020-04-01
Publisher
PRODI D3 TEKNIK SIPIL
Language
eng

Abstract

Abstract Analysis of the Risk Level of Work Accidents at Cable Stayed Work (Kendari Bay Bridge Construction Project) Supervised by Mts. Fitriah Mas’ud as supervisor I and Mr. Mappa Nasrun as mentor II. Occupational Health and Safety (K3) problems in general are still neglected in Indonesia, this is shown by the high accident rate and the low level of concern from the business world towards work safety. This general problem regarding K3 also occurs in the implementation of construction projects.This study discusses and identifies the risks of work accidents and controls the risk of work accidents in every implementation of Cable Stayed work at the Kendari Bay Bridge Construction Project, knowing about the application of SMK3 and K3 to Cable Stayed Work at the Kendari Bay Bridge Construction Project. Identification of the level of risk for work accidents is taken from the results of observations and interviews with respondents, and data processing is done manually with the formula Risk value = probable weight x weight severity. (Puspitasari, 2010).The research results show that the possibility and risk level of work accidents with the highest risk level is the prestressed wire installation work with the results of high risk / risk value × 100% = 12 ÷ 16 × 100 = 75% (high category) As for overcoming this risk the project party holds daily meetings, to urge workers to wear K3 equipment when doing work. Abstrak Analisis Tingkat Resiko Kecelakaan Kerja Pada Pekerjaan Cable Stayed (Proyek Pembangunan Jembatan Teluk Kendari)” Dibimbing oleh Ibu Fitriah Mas’ud selaku pembimbing I dan Bapak Mappa Nashrun selaku pembimbing II. Permasalahan Keselamatan dan Kesehatan Kerja (K3) secara umum di indonesia masih terabaikan, hal ini ditunjukkan dengan angka kecelakaan yang masih tinggi dan tingkat kepedulian dunia usaha terhadap keselamatan kerja yang masih rendah. Masalah umum mengenai K3 ini juga terjadi pada penyelenggaraan proyek - proyek konstruksi.Pada penelitian ini membahas serta mengidentifikasi resiko - resiko kecelakaan kerja dan pengendalian resiko kecelakaan kerja disetiap pelaksanaan pekerjaan Cable Stayed di Proyek Pembangunan Jembatan Teluk Kendari, mengetahui tentang penerapan SMK3 dan K3 terhadap Pekerjaan Cable Stayed di Proyek Pembangunan Jembatan Teluk Kendari. Identifikasi tingkat nilai resiko kecelakaan kerja diambil dari hasil observasi dan wawancara kepada responden, dan pengolahan data dilakukan secara manual dengan rumus Nilai resiko = Bobot kemungkinan x Bobot keparahan. (Puspitasari, 2010). Pada hasil penelitian diperoleh kemungkinan dan tingkat resiko kecelakaan kerja yang paling tinggi tingkat resikonya yaitu pada pekerjaan pemasangan kawat prategang dengan hasil nilai resiko / nilai resiko tinggi × 100% = 12 ÷ 16 × 100 = 75% (kategori tinggi). Adapun untuk menanggulangi resiko tersebut pihak proyek melakukan meeting harian, untuk menghimbau para pekerja mamakai perlengkapan K3 pada saat melakukan pekerjaan.

Collaboration network of the authors

40 authors · 178 co-authorship links · 12 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Sembilanbelas November Kolaka
  • Universitas Halu Oleo
  • Universitas Islam Negeri Ar-Raniry
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Try Sugiyarto SoeparyantoUniversitas Halu Oleo10
Umran SaritaAffiliation unknown7
Ranno Marlany RachmanAffiliation unknown6
Baso MursidiAffiliation unknown6
sulha sulhaAffiliation unknown6
Romy TalanipaUniversitas Halu Oleo5
Muhammad Buttomi MasgodeUniversitas Sembilanbelas November Kolaka4
Wayan MustikaAffiliation unknown4
Nasrul NasrulUniversitas Halu Oleo4
Siti Nurjanah AhmadUniversitas Halu Oleo4
Rini SriyaniAffiliation unknown3
Arman HidayatUniversitas Sembilanbelas November Kolaka3
Anafi MinmahddunUniversitas Halu Oleo3
Tryantini Sundi PutriAffiliation unknown3
Ainussalbi Al IkhsanAffiliation unknown3
Muhammad Syarif PrasetiaAffiliation unknown2
Muriadin MuriadinUniversitas Halu Oleo2
Romy S. E. TamburakaAffiliation unknown2
Muh Thahir AzikinAffiliation unknown2
Fitriah FitriahUniversitas Islam Negeri Ar-Raniry2
La WelendoAffiliation unknown2
Al Tafakur La OdeUniversitas Sembilanbelas November Kolaka1
Muhammad Bottomi MasgodeAffiliation unknown1
Ummu KalsumUniversitas Sembilanbelas November Kolaka1
Ayu Dita DamayantiUniversitas Sembilanbelas November Kolaka1
Arya DirgantaraUniversitas Sembilanbelas November Kolaka1
La Ode DzakirUniversitas Sembilanbelas November Kolaka1
Al Tafakur LaodeUniversitas Sembilanbelas November Kolaka1
Heri SantosoUniversitas Sembilanbelas November Kolaka1
Retno PuspaningtyasUniversitas Sembilanbelas November Kolaka1
Muh. ArdiansyahUniversitas Sembilanbelas November Kolaka1
Yuyun AnggrainiUniversitas Sembilanbelas November Kolaka1
Putri RamadhaniUniversitas Halu Oleo1
Asrullah TondasiUniversitas Halu Oleo1
Ishak KadirUniversitas Halu Oleo1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/MedKons/oai, first harvested 31 Okt 2026, last seen 31 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">ANALISIS TINGKAT RESIKO KECELAKAAN KERJA PADA PEKERJAAN CABLE STAYED (Studi Kasus: Proyek Pembangunan Jembatan Teluk Kendari)</dc:title>
	<dc:creator>Mulyono, Imam</dc:creator>
	<dc:creator>Mas'ud, Fitriah</dc:creator>
	<dc:creator>Nashrun, Mappa</dc:creator>
	<dc:creator>Arsyad, La Ode Muhamad Nurrakhmad</dc:creator>
	<dc:creator>Rustan, Fathur Rahman</dc:creator>
	<dc:description xml:lang="en-US"> Abstract Analysis of the Risk Level of Work Accidents at Cable Stayed Work (Kendari Bay Bridge Construction Project) Supervised by Mts. Fitriah Mas’ud as supervisor I and Mr. Mappa Nasrun as mentor II. Occupational Health and Safety (K3) problems in general are still neglected in Indonesia, this is shown by the high accident rate and the low level of concern from the business world towards work safety. This general problem regarding K3 also occurs in the implementation of construction projects.This study discusses and identifies the risks of work accidents and controls the risk of work accidents in every implementation of Cable Stayed work at the Kendari Bay Bridge Construction Project, knowing about the application of SMK3 and K3 to Cable Stayed Work at the Kendari Bay Bridge Construction Project. Identification of the level of risk for work accidents is taken from the results of observations and interviews with respondents, and data processing is done manually with the formula Risk value = probable weight x weight severity. (Puspitasari, 2010).The research results show that the possibility and risk level of work accidents with the highest risk level is the prestressed wire installation work with the results of high risk / risk value × 100% = 12 ÷ 16 × 100 = 75% (high category) As for overcoming this risk the project party holds daily meetings, to urge workers to wear K3 equipment when doing work.  Abstrak Analisis Tingkat Resiko Kecelakaan Kerja Pada Pekerjaan Cable Stayed (Proyek Pembangunan Jembatan Teluk Kendari)” Dibimbing oleh Ibu Fitriah Mas’ud selaku pembimbing I dan Bapak Mappa Nashrun selaku pembimbing II. Permasalahan Keselamatan dan Kesehatan Kerja (K3) secara umum di indonesia  masih terabaikan, hal ini ditunjukkan dengan  angka  kecelakaan yang masih tinggi  dan tingkat kepedulian dunia usaha terhadap keselamatan kerja yang masih rendah. Masalah umum mengenai K3 ini juga terjadi pada penyelenggaraan proyek - proyek konstruksi.Pada penelitian ini membahas serta mengidentifikasi resiko - resiko kecelakaan kerja dan pengendalian resiko kecelakaan kerja disetiap  pelaksanaan  pekerjaan Cable Stayed di Proyek Pembangunan Jembatan Teluk Kendari, mengetahui tentang penerapan SMK3 dan K3 terhadap Pekerjaan Cable Stayed  di Proyek Pembangunan Jembatan Teluk Kendari. Identifikasi tingkat nilai resiko kecelakaan kerja diambil dari hasil observasi dan wawancara kepada responden, dan pengolahan data dilakukan secara manual dengan rumus Nilai resiko = Bobot kemungkinan x Bobot keparahan. (Puspitasari, 2010). Pada hasil penelitian diperoleh kemungkinan dan tingkat resiko kecelakaan kerja yang paling tinggi tingkat resikonya yaitu pada  pekerjaan pemasangan kawat prategang dengan hasil nilai resiko / nilai resiko tinggi × 100% = 12 ÷ 16 × 100 = 75% (kategori tinggi). Adapun untuk menanggulangi resiko tersebut pihak proyek melakukan meeting harian, untuk menghimbau para pekerja mamakai  perlengkapan K3 pada saat melakukan pekerjaan. </dc:description>
	<dc:publisher xml:lang="en-US">PRODI D3 TEKNIK SIPIL</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2020-04-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/MedKons/article/view/24094</dc:identifier>
	<dc:identifier>10.33772/jmk.v5i1.24094</dc:identifier>
	<dc:source xml:lang="en-US">Media Konstruksi : Jurnal Ilmiah Teknik Sipil; Vol 5, No 1 (2020): MedKons</dc:source>
	<dc:source>2503-2712</dc:source>
	<dc:source>10.33772/jmk.v5i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/MedKons/article/view/24094/14448</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2022 MEDIA KONSTRUKSI</dc:rights>
</oai_dc:dc>