Melola Discovery

← Melola Discovery

Open access Jurnal

Metode Pelaksanaan Pekerjaan Bore Pile Jembatan Teluk Kendari

Media Konstruksi : Jurnal Ilmiah Teknik Sipil · Vol. 8 No. 2 (2023) · pp. 57–66

DOI
10.33772/jmk.v8i2.28767
ISSN
2503-2712
Published
2023-07-04
Publisher
PRODI D3 TEKNIK SIPIL
Language
eng
License
creativecommons.org/licenses/by/4.0

Abstract

AbstractThe government continues to promote infrastructure development outside Java as an effort to equalize development, including Kendari City. This study aims to determine the implementation method, requirements and standards of bore pile work in the Kendari Bay Bridge project. The results of the research on the method of carrying out bore pile work on the Kendari Bay Bridge project include a series of preparations for casing bore pile erection, mobilization of bore pile steel casing, erection of bore pile steel casing, connection of bore pile steel casing, setting of RCD tools then drill bore pile points to the desired depth. specified on the plans, rebar installation, bore pile casting. Material requirements and standards used in bore piles for concrete use high-strength SCC (Self Compacting Concrete) concrete with a quality of fc 30 Mpa, by adding Retarder RD, Super Plastic SP and Fly Ash.AbstrakPengembangan infrastruktur di luar pulau Jawa terus digenjot pemerintah sebagai upaya pemerataan pembangunan, termasuk Kota Kendari. Penelitian ini bertujuan untuk mengetahui metode pelaksanaan, syarat dan standar pekerjaan bore pile di proyek Jembatan teluk Kendari. Hasil penelitian metode pelaksanaan pekerjaan bore pile pada proyek Jembatan Teluk Kendari antara lain rangkaian persiapan pemancangan casing bore pile, mobilisasi casing baja bore pile, pemancangan casing baja bore pile, penyambungan casing baja bore pile, setting alat RCD kemudian bor titik bore pile sampai kedalaman yang telah ditentukan pada gambar rencana, instalasi rebar, pengecoran bore pile. Syarat dan standar material yang dipakai pada bore pile untuk beton menggunakan beton mutu tinggi SCC (Self Compacting Concrete) dengan mutu fc 30 Mpa, dengan menambahkan Retarder RD, Super Plasitis SP dan Fly Ash.

Collaboration network of the authors

40 authors · 161 co-authorship links · 11 across different organisations · showing the 40 most connected

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universitas Halu Oleo
  • Universitas Islam Negeri Ar-Raniry
  • Universitas Sembilanbelas November Kolaka
  • Universitas Sulawesi Tenggara
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Umran SaritaAffiliation unknown15
Fitriah FitriahUniversitas Islam Negeri Ar-Raniry9
Anafi MinmahddunUniversitas Halu Oleo8
Baso MursidiAffiliation unknown7
Nasrul NasrulUniversitas Halu Oleo6
Siti Nurjanah AhmadUniversitas Halu Oleo5
Romy S. E. TamburakaAffiliation unknown5
Rini SriyaniAffiliation unknown4
Romy TalanipaUniversitas Halu Oleo4
La Ode Muhamad Nurrakhmad ArsyadUniversitas Halu Oleo4
Fathur Rahman RustanUniversitas Sembilanbelas November Kolaka4
RIdwansyah NuhunAffiliation unknown4
La WelendoAffiliation unknown3
Masdiana MasdianaUniversitas Halu Oleo3
Try Sugiyarto SoeparyantoUniversitas Halu Oleo3
La Ode Muhammad Al MurshalatAffiliation unknown2
Muriadin MuriadinUniversitas Halu Oleo2
Muh Thahir AzikinAffiliation unknown2
Rismon RismonAffiliation unknown2
Randa PratamaUniversitas Sulawesi Tenggara2
Try SugiyartoAffiliation unknown1
Adrianto YusufAffiliation unknown1
Muhammad Handy Dwi AdityawanAffiliation unknown1
Tuti AlawiaAffiliation unknown1
Muhammad Reza RidwanAffiliation unknown1
Erich Nov Putra RazakAffiliation unknown1
Azman AzmanAffiliation unknown1
Aloysius A. Prima MangiriAffiliation unknown1
Fitriah Mas'udAffiliation unknown1
Sabil SabilAffiliation unknown1
Sultan Machmud Hasan MasikkiAffiliation unknown1
Evy YusufAffiliation unknown1
Laode Mulia RasiAffiliation unknown1
Farid DarmawanAffiliation unknown1
Aloysius A.P. MangiriAffiliation unknown1
Muhammad SidiqAffiliation unknown1
Aprijal Mukti LalumbuAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/MedKons/oai, first harvested 31 Okt 2026, last seen 31 Okt 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">Metode Pelaksanaan Pekerjaan Bore Pile Jembatan Teluk Kendari</dc:title>
	<dc:creator>Tryagum, Tryagum</dc:creator>
	<dc:creator>Sulha, Sulha</dc:creator>
	<dc:creator>Mustika, Wayan</dc:creator>
	<dc:description xml:lang="en-US">AbstractThe government continues to promote infrastructure development outside Java as an effort to equalize development, including Kendari City. This study aims to determine the implementation method, requirements and standards of bore pile work in the Kendari Bay Bridge project. The results of the research on the method of carrying out bore pile work on the Kendari Bay Bridge project include a series of preparations for casing bore pile erection, mobilization of bore pile steel casing, erection of bore pile steel casing, connection of bore pile steel casing, setting of RCD tools then drill bore pile points to the desired depth. specified on the plans, rebar installation, bore pile casting. Material requirements and standards used in bore piles for concrete use high-strength SCC (Self Compacting Concrete) concrete with a quality of fc 30 Mpa, by adding Retarder RD, Super Plastic SP and Fly Ash.AbstrakPengembangan infrastruktur di luar pulau Jawa terus digenjot pemerintah sebagai upaya pemerataan pembangunan, termasuk Kota Kendari. Penelitian ini bertujuan untuk mengetahui metode pelaksanaan, syarat dan standar pekerjaan bore pile di proyek Jembatan teluk Kendari. Hasil penelitian metode pelaksanaan pekerjaan bore pile pada proyek Jembatan Teluk Kendari antara lain rangkaian persiapan pemancangan casing bore pile, mobilisasi casing baja bore pile, pemancangan casing baja bore pile, penyambungan casing baja bore pile, setting alat RCD kemudian bor titik bore pile sampai kedalaman yang telah ditentukan pada gambar rencana, instalasi rebar, pengecoran bore pile. Syarat dan standar material yang dipakai pada bore pile untuk beton menggunakan beton mutu tinggi SCC (Self Compacting Concrete)  dengan mutu fc 30 Mpa, dengan menambahkan Retarder RD, Super Plasitis SP dan Fly Ash.</dc:description>
	<dc:publisher xml:lang="en-US">PRODI D3 TEKNIK SIPIL</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2023-07-04</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/MedKons/article/view/28767</dc:identifier>
	<dc:identifier>10.33772/jmk.v8i2.28767</dc:identifier>
	<dc:source xml:lang="en-US">Media Konstruksi : Jurnal Ilmiah Teknik Sipil; Vol 8, No 2 (2023); 57-66</dc:source>
	<dc:source>2503-2712</dc:source>
	<dc:source>10.33772/jmk.v8i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/MedKons/article/view/28767/18617</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2023 Media Konstruksi : Jurnal Ilmiah Teknik Sipil</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>