PENGAPLIKASIAN METODE EARNED VALUE PADA PENGENDALIAN WAKTU TERHADAP BIAYA (Study Kasus: Proyek Penggantian Jembatan Sungai Langkolome Cs Kabupaten Muna)

STABILITA || Jurnal Ilmiah Teknik Sipil · Vol. 1 No. 3 (2013)

DOI
10.55679/jts.v1i3.6753
ISSN
2657-2273, 2338-2899
Terbit
2013-11-04
Penerbit
Fakultas Teknik Jurusan Sipil Universitas Halu Oleo
Bahasa
eng

Abstrak

AbstractControl is one of the functions of project management that aims to make the jobs can run reach the target without much deviation. The concept of Value Results (eraned Value) is a control method that is used to control project costs and schedules in an integrated manner. The study Application of Earned Value Method in Control Against Time Costs (Case Study) held for 3 months to finish by means of collecting data - the data that is required. In this case, the data work on the project, monthly reports, weekly reports, Schedule implementation, RAB, unit price, and others - others. River Bridge Replacement Project Langkolome Cs located in Muna, District of South Wakorumba, Wambona Village, Southeast Sulawesi has a contract value of Rp. 5,279,117,000.00 to the project implementation time of 180 calendar days. Information obtained on reporting until in June is Budgeted Cost forWork Schedule (BCWS) = USD $ 688,842,961.11, Budgeted Cost For Work Performed (BCWP) = Rp. 1,016,985,385.83 and Actual Cost For Performed (ACWP) = Rp. 891,109,957.50. At this time the better the performance of the project from planning, in the sense of spending less than budget. Performed Cost Index (CPI) = 1.14 1 and Schedule Performance Index (SPI) = 1.47 1, shows the execution of the work ahead of schedule planned work.Keywords: Cost of Work Scheduled, Work performed Budget, Actual Cost for Work Performed.

Jaringan kolaborasi para penulis

40 penulis · 151 tautan kepenulisan bersama · 2 lintas organisasi · menampilkan 40 yang paling banyak terhubung

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Halu Oleo
  • Universitas Sembilanbelas November Kolaka
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Edward NgiiUniversitas Halu Oleo7
Romy TalanipaUniversitas Halu Oleo6
Tryantini Sundi PutriAfiliasi tidak diketahui6
Fathur Rahman RustanUniversitas Sembilanbelas November Kolaka4
Adris Ade PutraAfiliasi tidak diketahui4
Agustan AgustanUniversitas Halu Oleo3
La WelendoAfiliasi tidak diketahui3
Ahmad Syarif SukriUniversitas Halu Oleo3
Ranno Marlany RachmanAfiliasi tidak diketahui2
Muriadin MuriadinUniversitas Halu Oleo2
Reska Angjella MustarifAfiliasi tidak diketahui2
Baso MursidiAfiliasi tidak diketahui2
Susanti DjalanteAfiliasi tidak diketahui2
Ilham Kari DarmawanUniversitas Halu Oleo1
Uniadi MangidiUniversitas Halu Oleo1
Adris Ade PutraUniversitas Halu Oleo1
Sitti Nurjannah AhmadUniversitas Halu Oleo1
Fitriah S Fitriah SUniversitas Halu Oleo1
Wayan MustikaAfiliasi tidak diketahui1
Yuni Ikasari Arif RidangkaAfiliasi tidak diketahui1
Muh. Handy Dwi AdityawanUniversitas Halu Oleo1
Uchi MusdalifahAfiliasi tidak diketahui1
Masykur KimsanAfiliasi tidak diketahui1
Jefryanto LondongsaluAfiliasi tidak diketahui1
Erik AstrawanAfiliasi tidak diketahui1
Salfin Adrian SyarifAfiliasi tidak diketahui1
Yana ImbrawatiAfiliasi tidak diketahui1
Muhammad Zukriyansyah SipaAfiliasi tidak diketahui1
Muhammad Rabiul BahriAfiliasi tidak diketahui1
Laode M Golok JayaAfiliasi tidak diketahui1
Sitti Nurjannah AhmadAfiliasi tidak diketahui1
Tahir AzikinAfiliasi tidak diketahui1
Triantini. S. PutriAfiliasi tidak diketahui1
Fitriah.S Fitriah.SAfiliasi tidak diketahui1
RIdwansyah NuhunAfiliasi tidak diketahui1
Lawalendo LawalendoAfiliasi tidak diketahui1
Vita AsriaAfiliasi tidak diketahui1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs.uho.ac.id/index.php/stabilita_jtsuho/oai, pertama di-harvest 1 Nov 2026, terakhir terlihat 15 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">PENGAPLIKASIAN METODE EARNED VALUE PADA PENGENDALIAN WAKTU TERHADAP BIAYA (Study Kasus: Proyek Penggantian Jembatan Sungai Langkolome Cs Kabupaten Muna)</dc:title>
	<dc:creator>Bulo, Meitri Laura</dc:creator>
	<dc:creator>Balaka, Rudi</dc:creator>
	<dc:creator>Sriyani, Rini</dc:creator>
	<dc:description xml:lang="en-US">AbstractControl is one of the functions of project management that aims to make the jobs can run reach the target without much deviation. The concept of Value Results (eraned Value) is a control method that is used to control project costs and schedules in an integrated manner. The study Application of Earned Value Method in Control Against Time Costs (Case Study) held for 3 months to finish by means of collecting data - the data that is required. In this case, the data work on the project, monthly reports, weekly reports, Schedule implementation, RAB, unit price, and others - others. River Bridge Replacement Project Langkolome Cs located in Muna, District of South Wakorumba, Wambona Village, Southeast Sulawesi has a contract value of Rp. 5,279,117,000.00 to the project implementation time of 180 calendar days. Information obtained on reporting until in June is Budgeted Cost forWork Schedule (BCWS) = USD $ 688,842,961.11, Budgeted Cost For Work Performed (BCWP) = Rp. 1,016,985,385.83 and Actual Cost For Performed (ACWP) = Rp. 891,109,957.50. At this time the better the performance of the project from planning, in the sense of spending less than budget. Performed Cost Index (CPI) = 1.14  1 and Schedule Performance Index (SPI) = 1.47  1, shows the execution of the work ahead of schedule planned work.Keywords: Cost of Work Scheduled, Work performed Budget, Actual Cost for Work Performed.</dc:description>
	<dc:publisher xml:lang="en-US">Fakultas Teknik Jurusan Sipil Universitas Halu Oleo</dc:publisher>
	<dc:contributor xml:lang="en-US"></dc:contributor>
	<dc:date>2013-11-04</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en-US">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs.uho.ac.id/index.php/stabilita_jtsuho/article/view/6753</dc:identifier>
	<dc:identifier>10.55679/jts.v1i3.6753</dc:identifier>
	<dc:source xml:lang="en-US">STABILITA || Jurnal Ilmiah Teknik Sipil; Vol 1, No 3 (2013): STABILITA || Jurnal Ilmiah Teknik Sipil; Hal. 359 - 372</dc:source>
	<dc:source>2657-2273</dc:source>
	<dc:source>2338-2899</dc:source>
	<dc:source>10.55679/jts.v1i3</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs.uho.ac.id/index.php/stabilita_jtsuho/article/view/6753/4974</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2019 STABILITA || Jurnal Ilmiah Teknik Sipil</dc:rights>
</oai_dc:dc>