Jurnal
Financial Performance Analysis on the Makassar – Parepare Public Railway Infrastructure Development Project: CASE STUDY ON THE F SEGMENT OF TONASA
Hasanuddin Journal of Applied Business and Entrepreneurship · Vol. 6 No. 2 (2023) · pp. 1–10
ISSN 2598-0890, 2598-0882
Published 2023-05-27
Publisher Master of Management, Faculty of Economics and Business, Hasanuddin University.
Language en
Abstract
Judging from the Area and Scope of Work above, it can be explained that there are 4 (four) work areas covering Pattalasang Village, Battara Village, Taraweang Village, Mangilu Village with 6 (six) core work items, namely Civil Works weighing 48.5%, Railroad Works weighing 17.5 %, Box Culvert Jobs are 13.4%, Bridge Works are 9.8%, Money Orders are 1.1%, FASOP Jobs are 7.5%. in the picture above can provide an overview to consider and contain various elements of uncertainty in a project in order to focus on project completion time and scheduling more thoroughly. Based on the above phenomenon, it is necessary to conduct a financial analysis on the Makassar – Parepare Public Railway Infrastructure Development project. This study aims to determine the performance, cost, time, cash flow by analyzing the financial performance of the Makassar - Parepare Public Railway Infrastructure Development project with a case study on the Tonasa Direction F Segment in Pangkep Regency through the Earned Value Method and Liability Ratio. The results of the study indicate that project performance is influenced predominantly by external factors.
Collaboration network of the authors
12 authors ·
17 co-authorship links
Hover or tap a name to highlight its co-authors. Double-click to open the author's page.
Tadulako University Riau University Affiliation unknown
Different organisations
Same organisation
Affiliation unknown
Thicker line = more joint articles · bigger circle = more articles
Show as table
Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.
Metadata source: OAI-PMH (metadata jurnal) https://journal.unhas.ac.id/index.php/hjabe/oai,
first harvested 2 Nov 2026,
last seen 2 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en">Financial Performance Analysis on the Makassar – Parepare Public Railway Infrastructure Development Project: CASE STUDY ON THE F SEGMENT OF TONASA</dc:title>
<dc:creator xml:lang="en">Porayouw, Tina Andrieta</dc:creator>
<dc:creator xml:lang="en">Laba, Rahman</dc:creator>
<dc:creator xml:lang="en">Nohong, Mursalim</dc:creator>
<dc:subject xml:lang="en">financial performance</dc:subject>
<dc:subject xml:lang="en">financial analysis</dc:subject>
<dc:subject xml:lang="en">earned value method</dc:subject>
<dc:subject xml:lang="en">liability ration</dc:subject>
<dc:description xml:lang="en">Judging from the Area and Scope of Work above, it can be explained that there are 4 (four) work areas covering Pattalasang Village, Battara Village, Taraweang Village, Mangilu Village with 6 (six) core work items, namely Civil Works weighing 48.5%, Railroad Works weighing 17.5 %, Box Culvert Jobs are 13.4%, Bridge Works are 9.8%, Money Orders are 1.1%, FASOP Jobs are 7.5%. in the picture above can provide an overview to consider and contain various elements of uncertainty in a project in order to focus on project completion time and scheduling more thoroughly. Based on the above phenomenon, it is necessary to conduct a financial analysis on the Makassar – Parepare Public Railway Infrastructure Development project. This study aims to determine the performance, cost, time, cash flow by analyzing the financial performance of the Makassar - Parepare Public Railway Infrastructure Development project with a case study on the Tonasa Direction F Segment in Pangkep Regency through the Earned Value Method and Liability Ratio. The results of the study indicate that project performance is influenced predominantly by external factors.</dc:description>
<dc:publisher xml:lang="en">Master of Management, Faculty of Economics and Business, Hasanuddin University.</dc:publisher>
<dc:date>2023-05-27</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
<dc:identifier>https://journal.unhas.ac.id/index.php/hjabe/article/view/26722</dc:identifier>
<dc:source xml:lang="en">Hasanuddin Journal of Applied Business and Entrepreneurship; Vol. 6 No. 2 (2023): Hasanuddin Journal of Applied Business and Entrepreneurship; 1-10</dc:source>
<dc:source>2598-0890</dc:source>
<dc:source>2598-0882</dc:source>
<dc:language>en</dc:language>
<dc:rights xml:lang="en">Copyright (c) 2023 Hasanuddin Journal of Applied Business and Entrepreneurship</dc:rights>
</oai_dc:dc>
Citations and indexing
OpenAlex
Not checked
Crossref
Not checked
Cite this article
APA 7
Porayouw, T. A., Laba, R., & Nohong, M. (2023). Financial Performance Analysis on the Makassar – Parepare Public Railway Infrastructure Development Project: CASE STUDY ON THE F SEGMENT OF TONASA. Hasanuddin Journal of Applied Business and Entrepreneurship, 6(2), 1–10. https://journal.unhas.ac.id/index.php/hjabe/article/view/26722
Copy
IEEE
T. A. Porayouw, R. Laba, and M. Nohong, “Financial Performance Analysis on the Makassar – Parepare Public Railway Infrastructure Development Project: CASE STUDY ON THE F SEGMENT OF TONASA,” Hasanuddin Journal of Applied Business and Entrepreneurship, vol. 6, no. 2, pp. 1–10, 2023.
Copy
Generated from the journal's metadata; check author names before use.