Melola Discovery

← Melola Discovery

Jurnal

Study on the development of the Kodingareng Island Electricity System Hybrid PLTD with PLTS using the HOMER Software

Jurnal Eksitasi · Vol. 1 No. 1 (2022) · pp. 1–6

ISSN
2829-5110
Published
2022-04-06
Publisher
Departemen Teknik Elektro
Language
en

Abstract

Kodingareng Island has a number of a population of 4526 people, where the electricitysystem is supplied by a generator with a capacity of 460 kVA which operates for 12 hours every day. Kodingareng Island has a source of New Renewable Energy (EBT) that can be developed, namely solar energy with an average potential of 5,870 kWh/m²/day. In this study, the calculation of the parameters made 3 system scenarios. Scenario 1 system used only comes from generators operating on Kodingareng island, scenario 2 systems used are PLTS with energy storage while scenario 3 systems used are generators operating on Kodingareng island with solar panels + energy storage. The result of this research is that the generator system in scenario 3 is able to generate power of 1,830,487 kWh/year and has a percentage yield of 51, 2% of renewable electrical energy sources of the total energy produced. From the economic value of the generator system in scenario 3, the lowest NPC is Rp. 37,251,880,000 compared to scenario 2 with scenario 1 and the CoE value for scenario 3 is Rp.2,597/kWh.

Keywords

Collaboration network of the authors

6 authors · 9 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Andi Muh Iqbal FiraldiAffiliation unknown2
Edward WijayaAffiliation unknown2
Rizky Azhary GaniAffiliation unknown2

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://journal.unhas.ac.id/index.php/eksitasi/oai, first harvested 2 Nov 2026, last seen 2 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Study on the development of the Kodingareng Island Electricity System Hybrid PLTD with PLTS using the HOMER Software </dc:title>
	<dc:creator xml:lang="en">Suyuti, Ansar </dc:creator>
	<dc:creator xml:lang="en">Mayasari, Fitriyanti </dc:creator>
	<dc:creator xml:lang="en">Pratama, Anugrah</dc:creator>
	<dc:subject xml:lang="en">Renewable Energy</dc:subject>
	<dc:subject xml:lang="en">PLTH</dc:subject>
	<dc:subject xml:lang="en">Economic Analysis</dc:subject>
	<dc:description xml:lang="en">Kodingareng Island has a number of a population of 4526 people, where the electricitysystem is supplied by a generator with a capacity of 460 kVA which operates for 12 hours every day. Kodingareng Island has a source of New Renewable Energy (EBT) that can be developed, namely solar energy with an average potential of 5,870 kWh/m²/day. In this study, the calculation of the parameters made 3 system scenarios. Scenario 1 system used only comes from generators operating on Kodingareng island, scenario 2 systems used are PLTS with energy storage while scenario 3 systems used are generators operating on Kodingareng island with solar panels + energy storage. The result of this research is that the generator system in scenario 3 is able to generate power of 1,830,487 kWh/year and has a percentage yield of 51, 2% of renewable electrical energy sources of the total energy produced. From the economic value of the generator system in scenario 3, the lowest NPC is Rp. 37,251,880,000 compared to scenario 2 with scenario 1 and the CoE value for scenario 3 is Rp.2,597/kWh.</dc:description>
	<dc:publisher xml:lang="id">Departemen Teknik Elektro</dc:publisher>
	<dc:date>2022-04-06</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="id">Artikel Peer-review</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unhas.ac.id/index.php/eksitasi/article/view/20643</dc:identifier>
	<dc:source xml:lang="en">Jurnal Eksitasi; Vol. 1 No. 1 (2022): Journal of Excitation of the Department of Electrical Engineering. Vol. 1. No. 1. 2022; 1-6</dc:source>
	<dc:source xml:lang="id">JURNAL EKSITASI DEPARTEMEN TEKNIK ELEKTRO; Vol 1 No 1 (2022): Jurnal Eksitasi Departemen Teknik Elektro. Vol. 1. No. 1. 2022; 1-6</dc:source>
	<dc:source>2829-5110</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://journal.unhas.ac.id/index.php/eksitasi/article/view/20643/8084</dc:relation>
</oai_dc:dc>