Hasanuddin University Training Center and Convention Hotel Electrical Installation Study

Jurnal Eksitasi · Vol. 2 No. 1 (2023) · pp. 29–32

ISSN
2829-5110
Published
2023-06-09
Publisher
Departemen Teknik Elektro
Language
id

Abstract

English

The increasing demand for electric power, especially in the field of electrical installations, requires a technically reliable plan. A good electrical installation system in the building must comply with the Indonesian National Standard (SNI) and General Electrical Installation Regulations (PUIL), so that electrical installations in buildings can work effectively and efficiently and can overcome disturbances that occur in the process of distribution network or distributing electricity to the building. The overall study of the electrical installation at the Training Center and Convention Hotel, Hasanuddin University aims to determine the feasibility of the electrical installation system with the most recent PUIL standards. The method used in this study started with collecting the data, calculating the required illumination value according to the function of each room, and determining the type of conducting CRC installed in the building. The results of this study for data processing obtained the number of required illumination values ​​installed using the lumen method equation, where the number of armatures varies according to the function of each room. The diameter of the current carrying capacity (KHA) used in a conductor is NYM 5 x 185 mm2, with the value of the current flowing in the main KHA is 389.22 A, and the total power used in the building is 221.781 Watt with installed loads such as air conditioners, lighting, and electric sockets. The control system, protection system, and earthing system contained in the building can be said to be operating correctly and meets PUIL 2011 standards.

Bahasa Indonesia

The increasing demand for electric power, especially in the field of electrical installations, requires a technically reliable plan. A good electrical installation system in the building must comply with the Indonesian National Standard (SNI) and General Electrical Installation Regulations (PUIL), so that electrical installations in buildings can work effectively and efficiently and can overcome disturbances that occur in the process of distribution network or distributing electricity to the building. The overall study of the electrical installation at the Training Center and Convention Hotel, Hasanuddin University aims to determine the feasibility of the electrical installation system with the most recent PUIL standards. The method used in this study started with collecting the data, calculating the required illumination value according to the function of each room, and determining the type of conducting CRC installed in the building. The results of this study for data processing obtained the number of required illumination values ​​installed using the lumen method equation, where the number of armatures varies according to the function of each room. The diameter of the current carrying capacity (KHA) used in a conductor is NYM 5 x 185 mm2, with the value of the current flowing in the main KHA is 389.22 A, and the total power used in the building is 221.781 Watt with installed loads such as air conditioners, lighting, and electric sockets. The control system, protection system, and earthing system contained in the building can be said to be operating correctly and meets PUIL 2011 standards.

Keywords

Collaboration network of the authors

6 authors · 9 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Anugrah PratamaAffiliation unknown2
Edward WijayaAffiliation unknown2
Rizky Azhary GaniAffiliation unknown2

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://journal.unhas.ac.id/index.php/eksitasi/oai, first harvested 2 Nov 2026, last seen 2 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Hasanuddin University Training Center and Convention Hotel Electrical Installation Study</dc:title>
	<dc:title xml:lang="id">Hasanuddin University Training Center and Convention Hotel Electrical Installation Study</dc:title>
	<dc:creator xml:lang="en">Firaldi, Andi Muh Iqbal</dc:creator>
	<dc:creator xml:lang="en">Suyuti, Ansar </dc:creator>
	<dc:creator xml:lang="en">Mayasari, Fitriyanti </dc:creator>
	<dc:subject xml:lang="en">Electrical Installation</dc:subject>
	<dc:subject xml:lang="en">General Electrical Installation Regulations (PUIL)</dc:subject>
	<dc:subject xml:lang="en">Current Carrying Capacity (KHA)</dc:subject>
	<dc:subject xml:lang="en">Electrical Conductor</dc:subject>
	<dc:description xml:lang="en">The increasing demand for electric power, especially in the field of electrical installations, requires a technically reliable plan. A good electrical installation system in the building must comply with the Indonesian National Standard (SNI) and General Electrical Installation Regulations (PUIL), so that electrical installations in buildings can work effectively and efficiently and can overcome disturbances that occur in the process of distribution network or distributing electricity to the building. The overall study of the electrical installation at the Training Center and Convention Hotel, Hasanuddin University aims to determine the feasibility of the electrical installation system with the most recent PUIL standards. The method used in this study started with collecting the data, calculating the required illumination value according to the function of each room, and determining the type of conducting CRC installed in the building. The results of this study for data processing obtained the number of required illumination values ​​installed using the lumen method equation, where the number of armatures varies according to the function of each room. The diameter of the current carrying capacity (KHA) used in a conductor is NYM 5 x 185 mm2, with the value of the current flowing in the main KHA is 389.22 A, and the total power used in the building is 221.781 Watt with installed loads such as air conditioners, lighting, and electric sockets. The control system, protection system, and earthing system contained in the building can be said to be operating correctly and meets PUIL 2011 standards.</dc:description>
	<dc:description xml:lang="id">The increasing demand for electric power, especially in the field of electrical installations, requires a technically reliable plan. A good electrical installation system in the building must comply with the Indonesian National Standard (SNI) and General Electrical Installation Regulations (PUIL), so that electrical installations in buildings can work effectively and efficiently and can overcome disturbances that occur in the process of distribution network or distributing electricity to the building. The overall study of the electrical installation at the Training Center and Convention Hotel, Hasanuddin University aims to determine the feasibility of the electrical installation system with the most recent PUIL standards. The method used in this study started with collecting the data, calculating the required illumination value according to the function of each room, and determining the type of conducting CRC installed in the building. The results of this study for data processing obtained the number of required illumination values ​​installed using the lumen method equation, where the number of armatures varies according to the function of each room. The diameter of the current carrying capacity (KHA) used in a conductor is NYM 5 x 185 mm2, with the value of the current flowing in the main KHA is 389.22 A, and the total power used in the building is 221.781 Watt with installed loads such as air conditioners, lighting, and electric sockets. The control system, protection system, and earthing system contained in the building can be said to be operating correctly and meets PUIL 2011 standards.</dc:description>
	<dc:publisher xml:lang="id">Departemen Teknik Elektro</dc:publisher>
	<dc:date>2023-06-09</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="id">Artikel Peer-review</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unhas.ac.id/index.php/eksitasi/article/view/27115</dc:identifier>
	<dc:source xml:lang="en">Jurnal Eksitasi; Vol. 2 No. 1 (2023): Jurnal Eksitasi Departemen Teknik Elektro Vol. 2. No.1. 2023; 29-32</dc:source>
	<dc:source xml:lang="id">JURNAL EKSITASI DEPARTEMEN TEKNIK ELEKTRO; Vol 2 No 1 (2023): Jurnal Eksitasi Departemen Teknik Elektro Vol. 2. No.1. 2023; 29-32</dc:source>
	<dc:source>2829-5110</dc:source>
	<dc:language>id</dc:language>
	<dc:language>en</dc:language>
	<dc:relation>https://journal.unhas.ac.id/index.php/eksitasi/article/view/27115/9881</dc:relation>
	<dc:rights xml:lang="id">Hak Cipta (c) 2023 JURNAL EKSITASI DEPARTEMEN TEKNIK ELEKTRO</dc:rights>
</oai_dc:dc>