Melola Discovery

← Melola Discovery

Open access Jurnal

Analysis of Paint Material Requirements and Repair Costs for the KMP Balibo Ferry

Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan · Vol. ume (2026) · pp. 64–73

DOI
10.62012/zl.vi.48309
ISSN
2721-5717, 2747-2124
Published
2026-03-28
Publisher
Departemen Teknik Kelautan Universitas Hasanuddin
Language
en
License
creativecommons.org/licenses/by/4.0

Abstract

English

The shipping industry is a crucial sector supporting maritime transportation in Indonesia, making ship maintenance and repair a vital requirement to ensure operational safety and efficiency. Painting is a crucial aspect of repair, protecting the ship's structure from corrosion while simultaneously reducing operational costs. This study aims to analyze the paint material requirements and painting costs for the KMP. Balibo ferry using the Just In Time (JIT) approach. This study provides a comprehensive overview of the calculation of material requirements and painting costs for the ship, while also offering a more effective inventory management strategy for the Indonesian shipbuilding industry. The primary data used include ship specifications, paint coating types, and material prices from official references. The analysis method is carried out by calculating the painting area, paint volume requirements, thinner, and material cost estimates based on the Dry Film Thickness, Solid Volume, Theoretical Spreading Rate, and paint loss factors. The results show that the total paint and thinner requirements can be estimated accurately, with a total cost of Rp 310.000.000. The implementation of the Just In Time (JIT) method results in more efficient material delivery planning, reduces potential waste, and accelerates the repair process.

Bahasa Indonesia

The shipping industry is a crucial sector supporting maritime transportation in Indonesia, making ship maintenance and repair a vital requirement to ensure operational safety and efficiency. Painting is a crucial aspect of repair, protecting the ship's structure from corrosion while simultaneously reducing operational costs. This study aims to analyze the paint material requirements and painting costs for the KMP. Balibo ferry using the Just In Time (JIT) approach. This study provides a comprehensive overview of the calculation of material requirements and painting costs for the ship, while also offering a more effective inventory management strategy for the Indonesian shipbuilding industry. The primary data used include ship specifications, paint coating types, and material prices from official references. The analysis method is carried out by calculating the painting area, paint volume requirements, thinner, and material cost estimates based on the Dry Film Thickness, Solid Volume, Theoretical Spreading Rate, and paint loss factors. The results show that the total paint and thinner requirements can be estimated accurately, with a total cost of Rp 310.000.000. The implementation of the Just In Time (JIT) method results in more efficient material delivery planning, reduces potential waste, and accelerates the repair process.

Keywords

Collaboration network of the authors

20 authors · 36 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Habibi PalippuiAffiliation unknown3
Fuad Mahfud AssidiqAffiliation unknown2
Muh. SyaifullahAffiliation unknown1
Paroka ParokaAffiliation unknown1
Risal RisalAffiliation unknown1
Firman HusainAffiliation unknown1
Cynthia Sampe LoloAffiliation unknown1
Daniel Mohammad RosyidAffiliation unknown1
SilvianitaAffiliation unknown1
Windi WidianingrumAffiliation unknown1
Daeng ParokaAffiliation unknown1
Makbul MubarakAffiliation unknown1
Ahmad Faiq Dhiyaulhaq KaryaAffiliation unknown1
Ainun JariahAffiliation unknown1
Andi KhairAffiliation unknown1
Andi Babul KhairAffiliation unknown1
Heriana KhairAffiliation unknown1
Egi SikalaAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://journal.unhas.ac.id/index.php/zonalaut/oai, first harvested 2 Nov 2026, last seen 2 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Analysis of Paint Material Requirements and Repair Costs for the KMP Balibo Ferry</dc:title>
	<dc:title xml:lang="id">Analysis of Paint Material Requirements and Repair Costs for the KMP Balibo Ferry</dc:title>
	<dc:creator xml:lang="en">Haslindah, Nurul</dc:creator>
	<dc:creator xml:lang="id">Haslindah, Nurul</dc:creator>
	<dc:creator xml:lang="id">Sade, Juswan</dc:creator>
	<dc:subject xml:lang="id">Biaya Operasional</dc:subject>
	<dc:subject xml:lang="id">-</dc:subject>
	<dc:subject xml:lang="en">Cost</dc:subject>
	<dc:subject xml:lang="en">Just-In-Time (JIT)</dc:subject>
	<dc:subject xml:lang="en">Material Requirements</dc:subject>
	<dc:subject xml:lang="en">Painting</dc:subject>
	<dc:subject xml:lang="en">Ship Repair</dc:subject>
	<dc:description xml:lang="en">The shipping industry is a crucial sector supporting maritime transportation in Indonesia, making ship maintenance and repair a vital requirement to ensure operational safety and efficiency. Painting is a crucial aspect of repair, protecting the ship's structure from corrosion while simultaneously reducing operational costs. This study aims to analyze the paint material requirements and painting costs for the KMP. Balibo ferry using the Just In Time (JIT) approach. This study provides a comprehensive overview of the calculation of material requirements and painting costs for the ship, while also offering a more effective inventory management strategy for the Indonesian shipbuilding industry. The primary data used include ship specifications, paint coating types, and material prices from official references. The analysis method is carried out by calculating the painting area, paint volume requirements, thinner, and material cost estimates based on the Dry Film Thickness, Solid Volume, Theoretical Spreading Rate, and paint loss factors. The results show that the total paint and thinner requirements can be estimated accurately, with a total cost of Rp 310.000.000. The implementation of the Just In Time (JIT) method results in more efficient material delivery planning, reduces potential waste, and accelerates the repair process.</dc:description>
	<dc:description xml:lang="id">The shipping industry is a crucial sector supporting maritime transportation in Indonesia, making ship maintenance and repair a vital requirement to ensure operational safety and efficiency. Painting is a crucial aspect of repair, protecting the ship's structure from corrosion while simultaneously reducing operational costs. This study aims to analyze the paint material requirements and painting costs for the KMP. Balibo ferry using the Just In Time (JIT) approach. This study provides a comprehensive overview of the calculation of material requirements and painting costs for the ship, while also offering a more effective inventory management strategy for the Indonesian shipbuilding industry. The primary data used include ship specifications, paint coating types, and material prices from official references. The analysis method is carried out by calculating the painting area, paint volume requirements, thinner, and material cost estimates based on the Dry Film Thickness, Solid Volume, Theoretical Spreading Rate, and paint loss factors. The results show that the total paint and thinner requirements can be estimated accurately, with a total cost of Rp 310.000.000. The implementation of the Just In Time (JIT) method results in more efficient material delivery planning, reduces potential waste, and accelerates the repair process.</dc:description>
	<dc:publisher xml:lang="en">Departemen Teknik Kelautan Universitas Hasanuddin</dc:publisher>
	<dc:date>2026-03-28</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unhas.ac.id/index.php/zonalaut/article/view/48309</dc:identifier>
	<dc:identifier>10.62012/zl.vi.48309</dc:identifier>
	<dc:source xml:lang="en">Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan; Volume 7, Issue 1, March 2026 Edition; 64-73</dc:source>
	<dc:source xml:lang="id">Zona Laut : Jurnal Inovasi Sains Dan Teknologi  Kelautan; Volume 7, Issue 1, March 2026 Edition; 64-73</dc:source>
	<dc:source>2721-5717</dc:source>
	<dc:source>2747-2124</dc:source>
	<dc:language>en</dc:language>
	<dc:language>id</dc:language>
	<dc:relation>https://journal.unhas.ac.id/index.php/zonalaut/article/view/48309/14265</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2026 Nurul Haslindah, Juswan Sade</dc:rights>
	<dc:rights xml:lang="en">https://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>