CRITICAL PATH ANALYSIS OF LONG PRECAST CONCRETE WORKBEAM AT WHEAT WORK AT MAKASSAR NEW PORT USING THE PERT METHOD

ANALISIS JALUR KRITIS PEKERJAAN BETON PRECAST LONG BEAM PADA PEKERJAAN DERMAGA DI MAKASSAR NEW PORT MENGGUNAKAN METODE PERT

SENSISTEK:Riset Sains dan Teknologi Kelautan · Vol. ume No. mor (2022) · pp. 175–179

DOI
10.62012/sensistek.v5i2.24751
ISSN
2988-2559, 2623-1506
Published
2022-11-26
Publisher
Departemen Teknik Kelautan Fakultas Teknik Universitas Hasanuddin
Language
id

Abstract

English

In a construction activity, there are several aspects that require proper management and processingrequired to have accuracy, determination, performance, accuracy, and safety to produce the appropriate endwith expectations. In a project, it is necessary to handle good scheduling management. Because ofTherefore, it needs to be handled with careful and thorough calculations so that no mistakes occur when the project is in progressjust lasts. The duration of a project does not have to add up the total time of the activity,but enough to find the critical path. Scheduling a project is an outcome factor that canprovide information about the schedule plan and progress of the project. In this case, the resource performance iscosts, personnel, equipment and materials, and project duration planning. When working on a project,problems often arise, namely the project implementation time does not match the agreed time. MatterThis will have a negative impact on the company. As a result, when a project is not well planned,Project implementation involves each other throughout a series of activities that will influence each other.

Bahasa Indonesia

Dalam suatu kegiatan konstruksi, terdapat beberapa aspek yang memerlukan manajemen dan pengolahan yangdituntut memiliki ketelitian, ketetapan, kinerja, kecermatan, dan keamanan untuk menghasilkan akhir yang sesuaidengan harapan. Dalam sebuah proyek, perlu adanya penanganan manajemen penjadwalan yang baik. Oleh sebabitu, perlu ditangani dengan perihitungan yang cermat serta teliti agar tidak terjadi kesalahan saat proyek sedanghanya berlangsung. Lama durasi suatu proyek tidak harus dengan menjumlahkan waktu keseluruhan aktivitas,tetapi cukup dengan mencari lintasan kritis. Penjadwalan suatu proyek merupakan faktor hasil yang dapatmemberikan informasi tentang jadwal rencana dan kemajuan proyek. Dalam hal ini, kinerja sumber daya berupabiaya, personel, peralatan dan material, dan perencanaan durasi proyek. Dalam mengerjakan suatu proyek,seringkali muncul masalah yaitu waktu pelaksanaan proyek tidak sesuai dengan waktu yang telah disepakati. Halini akan berdampak negatif bagi perusahaan. Akibatnya, ketika sebuah proyek tidak direncanakan dengan baik,pelaksanaan proyek saling melibatkan seluruh rangkaian kegiatan akan saling mempengaruhi.

Keywords

Collaboration network of the authors

32 authors · 67 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Hasanuddin University
  • Universitas Halu Oleo
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Chairul PaotonanAffiliation unknown4
Riswal KarammaHasanuddin University2
Firman HusainAffiliation unknown2
Ariska AriskaAffiliation unknown2
Habibi PalippuiAffiliation unknown2
Hasdinar UmarAffiliation unknown1
Muhammad AyyubAffiliation unknown1
Suyono SuyonoAffiliation unknown1
Jessica Indah PricillaAffiliation unknown1
Nurwani SarahAffiliation unknown1
Hasnidar HasnidarAffiliation unknown1
Achmad Yasir BaedahAffiliation unknown1
Nenny KarimAffiliation unknown1
Asrif AlmunawirAffiliation unknown1
Asripa AsripaAffiliation unknown1
Edianto EdiantoAffiliation unknown1
Nur RachmiAffiliation unknown1
Fitriyanti FitriyantiAffiliation unknown1
Putri Sriwahyuni KasbaAffiliation unknown1
Reskiyanti CuguAffiliation unknown1
ZULFIKAR ZULFIKARUniversitas Halu Oleo1
Tri UtariAffiliation unknown1
Mu’minatung NisaAffiliation unknown1
Arham AzisAffiliation unknown1
Arisandi ArisandiAffiliation unknown1
Novrian Yosua TimangAffiliation unknown1
Muh. Furqan Lizak UtamaAffiliation unknown1
Baso KamaluddinAffiliation unknown1
Nurjurana JusmanAffiliation unknown1
Citra SugengAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://journal.unhas.ac.id/index.php/SENSISTEK/oai, first harvested 2 Nov 2026, last seen 2 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">CRITICAL PATH  ANALYSIS OF LONG PRECAST CONCRETE WORKBEAM AT WHEAT WORK AT MAKASSAR NEW PORT USING THE PERT METHOD</dc:title>
	<dc:title xml:lang="id">ANALISIS JALUR KRITIS PEKERJAAN BETON PRECAST LONG BEAM PADA PEKERJAAN DERMAGA DI MAKASSAR NEW PORT  MENGGUNAKAN METODE PERT</dc:title>
	<dc:creator xml:lang="en">Damayanti, Rosa</dc:creator>
	<dc:creator xml:lang="en">Ashury, Ashury</dc:creator>
	<dc:creator xml:lang="id">Damayanti, Rosa</dc:creator>
	<dc:creator xml:lang="id">Ashury, Ashury</dc:creator>
	<dc:subject xml:lang="id">Kata Kunci: Proyek, Penjadwalan Proyek, Jalur Kritis</dc:subject>
	<dc:subject xml:lang="en">Keywords: Project, Project Scheduling, Critical Path</dc:subject>
	<dc:description xml:lang="en">In a construction activity, there are several aspects that require proper management and processingrequired to have accuracy, determination, performance, accuracy, and safety to produce the appropriate endwith expectations. In a project, it is necessary to handle good scheduling management. Because ofTherefore, it needs to be handled with careful and thorough calculations so that no mistakes occur when the project is in progressjust lasts. The duration of a project does not have to add up the total time of the activity,but enough to find the critical path. Scheduling a project is an outcome factor that canprovide information about the schedule plan and progress of the project. In this case, the resource performance iscosts, personnel, equipment and materials, and project duration planning. When working on a project,problems often arise, namely the project implementation time does not match the agreed time. MatterThis will have a negative impact on the company. As a result, when a project is not well planned,Project implementation involves each other throughout a series of activities that will influence each other.</dc:description>
	<dc:description xml:lang="id">Dalam suatu kegiatan konstruksi, terdapat beberapa aspek yang memerlukan manajemen dan pengolahan yangdituntut memiliki ketelitian, ketetapan, kinerja, kecermatan, dan keamanan untuk menghasilkan akhir yang sesuaidengan harapan. Dalam sebuah proyek, perlu adanya penanganan manajemen penjadwalan yang baik. Oleh sebabitu, perlu ditangani dengan perihitungan yang cermat serta teliti agar tidak terjadi kesalahan saat proyek sedanghanya berlangsung. Lama durasi suatu proyek tidak harus dengan menjumlahkan waktu keseluruhan aktivitas,tetapi cukup dengan mencari lintasan kritis. Penjadwalan suatu proyek merupakan faktor hasil yang dapatmemberikan informasi tentang jadwal rencana dan kemajuan proyek. Dalam hal ini, kinerja sumber daya berupabiaya, personel, peralatan dan material, dan perencanaan durasi proyek. Dalam mengerjakan suatu proyek,seringkali muncul masalah yaitu waktu pelaksanaan proyek tidak sesuai dengan waktu yang telah disepakati. Halini akan berdampak negatif bagi perusahaan. Akibatnya, ketika sebuah proyek tidak direncanakan dengan baik,pelaksanaan proyek saling melibatkan seluruh rangkaian kegiatan akan saling mempengaruhi.</dc:description>
	<dc:publisher xml:lang="en">Departemen Teknik Kelautan Fakultas Teknik Universitas Hasanuddin</dc:publisher>
	<dc:date>2022-11-26</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unhas.ac.id/index.php/SENSISTEK/article/view/24751</dc:identifier>
	<dc:identifier>10.62012/sensistek.v5i2.24751</dc:identifier>
	<dc:source xml:lang="en">SENSISTEK:Riset Sains dan Teknologi Kelautan; Volume 5, Nomor 2, Tahun 2022; 175-179</dc:source>
	<dc:source xml:lang="id">Riset Sains dan Teknologi Kelautan; Volume 5, Nomor 2, Tahun 2022; 175-179</dc:source>
	<dc:source>2988-2559</dc:source>
	<dc:source>2623-1506</dc:source>
	<dc:language>id</dc:language>
	<dc:relation>https://journal.unhas.ac.id/index.php/SENSISTEK/article/view/24751/10748</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2026 SENSISTEK:Riset Sains dan Teknologi Kelautan</dc:rights>
</oai_dc:dc>