PEMANFAATAN PEMBANGKIT LISTRIK HYBRID DALAM MENDUKUNG ELEKTRIFIKASI DI KAWASAN JAVAN LANGUR CENTRE KOTA BATU JAWA TIMUR

Panrita Abdi - Jurnal Pengabdian pada Masyarakat · Vol. 5 No. 4 (2021) · hlm. 519–527

DOI
10.20956/pa.v5i4.11286
ISSN
2580-3786
Terbit
2021-08-09
Penerbit
LP2M Universitas Hasanuddin
Bahasa
en
Lisensi
creativecommons.org/licenses/by-nc-nd/4.0

Abstrak

Javan Langur Center (JLC) is a Javan Langur rehabilitation center located approximately 10 km from the center of Batu city, East Java. To support activities at this rehabilitation center, electrical energy is needed, especially to meet the needs of lighting facilities and the operation of a primate baby incubator machine. To date, no electricity distribution network from the State Electricity Company (PLN) has entered the area. To meet these electricity needs, the electricity supply is obtained from a gen-set owned by residents which is approximately 2 km from the JLC. This Community Service Program was carried out between February and August 2020 with activities in the form of the construction of a hybrid power plant to meet the electricity needs of the JLC. The hybrid power plant that is installed is a combination of pico-hydro power plant technology (PLTPH) and solar power plant (PLTS). During the implementation of the program, there were two activity partners who played an active role, namely The Aspinall Foundation Indonesia Program (JLC manager) and the Javan Lutung Conservation Community, with a total of about 10 personnel. The result of this community service program is the installation and operation of a hybrid power generation system, which consists of a 300-watt pico-hydro power plant and a 200-watt peak solar power plant. With this hybrid power plant, the electricity needs in the JLC area for lighting and operating the Lutung baby incubator machine, with a total power of 180 watts, can be met. In addition, to maintain the sustainability of the operation and maintenance of the hybrid power plant, a transfer of knowledge and skills has been carried out to partners, namely The Aspinal Foundation Indonesia Program and the Javan Lutung Conservation Community. --- Javan Langur Center (JLC) adalah pusat rehabilitasi Lutung Jawa yang terletak lebih kurang 10 km dari pusat kota Batu, Jawa Timur. Untuk menunjang kegiatan di pusat rehabilitasi ini, energi listrik sangat dibutuhkan, terutama untuk memenuhi kebutuhan fasilitas penerangan dan pengoperasian mesin inkubator bayi primata. Sampai saat ini, belum ada jaringan distribusi listrik dari Perusahaan Listrik Negara (PLN) yang masuk di kawasan ini. Untuk memenuhi kebutuhan listrik tersebut, pasokan energi listrik didapatkan dari gen-set milik warga yang jaraknya kurang lebih 2 km dari JLC. Program Pengabdian Kepada Masyarakat ini dilaksanakan antara bulan Pebruari sampai bulan Agustus 2020 dengan kegiatan berupa pembangunan pembangkit listrik hybrid untuk memenuhi kebutuhan listrik di JLC. Pembangkit listrik hybrid yang dipasang merupakan penggabungan teknologi pembangkit listrik tenaga pikohidro (PLTPH) dan pembangkit listrik tenaga surya (PLTS). Selama pelaksanaan program, ada dua mitra kegiatan yang berperan aktif, yakni The Aspinall Foundation Indonesia Program (pengelola JLC) dan Komunitas Konservasi Lutung Jawa, dengan total personel sekitar 10 orang. Hasil program pengabdian kepada masayarakat ini berupa pemasangan dan pengoperasian sistem pembangkit tenaga listrik hybrid, yang terdiri atas pembangkit listrik tenaga piko hidro berkapasitas 300 watt dan pembangkit listrik tenaga surya berkapasitas 200 watt peak. Dengan adanya pembangkit listrik hybrid ini, maka kebutuhan listrik di area JLC untuk penerangan dan pengoperasian mesin inkubator bayi Lutung, dengan total daya 180 watt dapat terpenuhi. Selain itu, untuk menjaga keberlangsungan pengoperasian dan pemeliharaan pembangkit tenaga listrik hybrid tersebut, telah dilakukan transfer pengetahuan dan keterampilan kepada pihak mitra kerja, yakni The Aspinal Foundation Indonesi Program dan Komunitas Konservasi Lutung Jawa.

Kata kunci

Jaringan kolaborasi para penulis

34 penulis · 119 tautan kepenulisan bersama · 26 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Politeknik Negeri Malang
  • University of Brawijaya
  • Institut Teknologi Sepuluh Nopember
  • Politeknik Negeri Madiun
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Indrazno SiradjuddinPoliteknik Negeri Malang5
Rosa Andrie AsmaraPoliteknik Negeri Malang3
Erfan RohadiPoliteknik Negeri Malang3
Awan SetiawanPoliteknik Negeri Malang3
Ekojono EkojonoPoliteknik Negeri Malang2
Aji NugrohoPoliteknik Negeri Malang2
Abdullah Faiq MunirPoliteknik Negeri Malang2
Sapto WibowoAfiliasi tidak diketahui2
Irwan Heryanto ErykAfiliasi tidak diketahui2
Muhammad Fahmi HakimAfiliasi tidak diketahui2
Raka Admiral AbdurrahmanPoliteknik Negeri Malang1
Dodik Widya AdhitamaPoliteknik Negeri Malang1
Rudy AriyantoPoliteknik Negeri Malang1
Arief PrasetyoInstitut Teknologi Sepuluh Nopember1
Anastasia Merry ChristinePoliteknik Negeri Malang1
Widhy Hayuhardhika Nugraha PutraUniversity of Brawijaya1
Dahnial SyauqyUniversity of Brawijaya1
Adhitya BhawiyugaUniversity of Brawijaya1
Budi Eko PrasetyoPoliteknik Negeri Malang1
Sigi Syah WibowoPoliteknik Negeri Malang1
Supriatna AdhisuwignjoPoliteknik Negeri Malang1
Azam Muzakhim ImammuddinPoliteknik Negeri Malang1
Ratna Ika PutriPoliteknik Negeri Malang1
Wildan Surya WijayaPoliteknik Negeri Malang1
Ratna Ika PutriPoliteknik Negeri Malang1
Ida Lailatul FitriaPoliteknik Negeri Malang1
Gillang Al AzharPoliteknik Negeri Malang1
Septyana RiskitasariPoliteknik Negeri Malang1
Rendi Pambudi WicaksonoPoliteknik Negeri Madiun1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unhas.ac.id/index.php/panritaabdi/oai, pertama di-harvest 3 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">PEMANFAATAN PEMBANGKIT LISTRIK HYBRID DALAM MENDUKUNG ELEKTRIFIKASI DI KAWASAN JAVAN LANGUR CENTRE KOTA BATU JAWA TIMUR</dc:title>
	<dc:creator xml:lang="en">Hidayat, Mohammad Noor</dc:creator>
	<dc:creator xml:lang="en">Ronilaya, Ferdian</dc:creator>
	<dc:creator xml:lang="en">Heryanto/Eryk, Irwan</dc:creator>
	<dc:creator xml:lang="en">Wibowo, Sapto</dc:creator>
	<dc:creator xml:lang="en">Hakim, Lukman</dc:creator>
	<dc:subject xml:lang="en">Hybrid power plant</dc:subject>
	<dc:subject xml:lang="en">: picohydro power plant</dc:subject>
	<dc:subject xml:lang="en">solar power plant</dc:subject>
	<dc:subject xml:lang="en">javan langur centre</dc:subject>
	<dc:description xml:lang="en">Javan Langur Center (JLC) is a Javan Langur rehabilitation center located approximately 10 km from the center of Batu city, East Java. To support activities at this rehabilitation center, electrical energy is needed, especially to meet the needs of lighting facilities and the operation of a primate baby incubator machine. To date, no electricity distribution network from the State Electricity Company (PLN) has entered the area. To meet these electricity needs, the electricity supply is obtained from a gen-set owned by residents which is approximately 2 km from the JLC. This Community Service Program was carried out between February and August 2020 with activities in the form of the construction of a hybrid power plant to meet the electricity needs of the JLC. The hybrid power plant that is installed is a combination of pico-hydro power plant technology (PLTPH) and solar power plant (PLTS). During the implementation of the program, there were two activity partners who played an active role, namely The Aspinall Foundation Indonesia Program (JLC manager) and the Javan Lutung Conservation Community, with a total of about 10 personnel. The result of this community service program is the installation and operation of a hybrid power generation system, which consists of a 300-watt pico-hydro power plant and a 200-watt peak solar power plant. With this hybrid power plant, the electricity needs in the JLC area for lighting and operating the Lutung baby incubator machine, with a total power of 180 watts, can be met. In addition, to maintain the sustainability of the operation and maintenance of the hybrid power plant, a transfer of knowledge and skills has been carried out to partners, namely The Aspinal Foundation Indonesia Program and the Javan Lutung Conservation Community. --- Javan Langur Center (JLC) adalah pusat rehabilitasi Lutung Jawa yang terletak lebih kurang 10 km dari pusat kota Batu, Jawa Timur. Untuk menunjang kegiatan di pusat rehabilitasi ini, energi listrik sangat dibutuhkan, terutama untuk memenuhi kebutuhan fasilitas penerangan dan pengoperasian mesin inkubator bayi primata. Sampai saat ini, belum ada jaringan distribusi listrik dari Perusahaan Listrik Negara (PLN) yang masuk di kawasan ini. Untuk memenuhi kebutuhan listrik tersebut,  pasokan energi listrik didapatkan dari gen-set milik warga yang jaraknya kurang lebih 2 km dari JLC. Program Pengabdian Kepada Masyarakat ini dilaksanakan antara bulan Pebruari sampai bulan Agustus 2020 dengan kegiatan berupa pembangunan pembangkit listrik hybrid untuk memenuhi kebutuhan listrik di JLC. Pembangkit listrik hybrid yang dipasang merupakan penggabungan teknologi pembangkit listrik tenaga pikohidro (PLTPH) dan pembangkit listrik tenaga surya (PLTS). Selama pelaksanaan program, ada dua mitra kegiatan yang berperan aktif, yakni The Aspinall Foundation Indonesia Program (pengelola JLC) dan Komunitas Konservasi Lutung Jawa, dengan total personel sekitar 10 orang. Hasil program pengabdian kepada masayarakat ini berupa pemasangan dan pengoperasian sistem pembangkit tenaga listrik hybrid, yang terdiri atas pembangkit listrik tenaga piko hidro berkapasitas 300 watt dan pembangkit listrik tenaga surya berkapasitas 200 watt peak. Dengan adanya pembangkit listrik hybrid ini, maka kebutuhan listrik di area JLC untuk penerangan dan pengoperasian mesin inkubator bayi Lutung, dengan total daya 180 watt dapat terpenuhi. Selain itu, untuk menjaga keberlangsungan pengoperasian dan pemeliharaan pembangkit tenaga listrik hybrid tersebut, telah dilakukan transfer pengetahuan dan keterampilan kepada pihak mitra kerja, yakni The Aspinal Foundation Indonesi Program dan Komunitas Konservasi Lutung Jawa.</dc:description>
	<dc:publisher xml:lang="en">LP2M Universitas Hasanuddin</dc:publisher>
	<dc:date>2021-08-09</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unhas.ac.id/index.php/panritaabdi/article/view/11286</dc:identifier>
	<dc:identifier>10.20956/pa.v5i4.11286</dc:identifier>
	<dc:source xml:lang="en">Panrita Abdi - Jurnal Pengabdian pada Masyarakat; Vol. 5 No. 4 (2021): Jurnal Panrita Abdi - Oktober 2021; 519-527</dc:source>
	<dc:source>2580-3786</dc:source>
	<dc:source>10.20956/pa.v5i4</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://journal.unhas.ac.id/index.php/panritaabdi/article/view/11286/7221</dc:relation>
	<dc:relation>10.20956/pa.v5i4.11286.g7221</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2021 Mohammad Noor Hidayat, Ferdian Ronilaya, Irwan Heryanto/Eryk, Sapto Wibowo, Lukman Hakim</dc:rights>
	<dc:rights xml:lang="en">http://creativecommons.org/licenses/by-nc-nd/4.0</dc:rights>
</oai_dc:dc>