Melola Discovery

← Melola Discovery

Jurnal SINTA 3

STATISTICAL CONTROL ANALYSIS OF THE STUDENT’S FINAL ASSIGNMENT COMPLETION PERIOD AT THE MATHEMATICS AND NATURAL SCIENCES FACULTY

BAREKENG: Jurnal Ilmu Matematika dan Terapan · Vol. 16 No. 2 (2022) · pp. 385–392

DOI
10.30598/barekengvol16iss2pp385-392
ISSN
2615-3017, 1978-7227
Published
2022-06-01
Publisher
PATTIMURA UNIVERSITY
Language
eng

Abstract

The final assignment is one of the requirements to get a bachelor’s degree for college students at the Faculty of Mathematics and Natural Sciences (FMIPA) University of Lambung Mangkurat (ULM). The average period of completion of the final assignment in the year 2015 until 2019 is 8 months, while the determined specification by the guideline is 6 months. The aim of this research is to identify the quality control of the final assignment completion process and whether satisfy the determined specification using statistical quality control. The used data in this research is the student’s final assignment completion period (variable data) and the nonconforming proportion of data (attribute data). The and control charts are used for variable data and control chart for attribute data and process capability analysis. The result of variable data is that the average period of final assignment completion is statistically in control with a control limit of months. For attribute data concluded that final assignment completion is statistically in control with a big average proportion that is. For the capability analysis process by index and value sequentially is and for the DPU value is. This shows that the completion period of the student’s final assignment of FMIPA ULM is not capable to fulfill the specified standard of the period.

Collaboration network of the authors

12 authors · 26 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Dewi AnggrainiAffiliation unknown2
Irma Sari YuliantiAffiliation unknown2
Faisal FaisalAffiliation unknown1
Saman AbdurrahmanAffiliation unknown1
Mochammad IdrisAffiliation unknown1
Thresye ThresyeAffiliation unknown1
Aprida Siska LestiaAffiliation unknown1
I Gede Adhitya Wisnu WardhanaAffiliation unknown1
Sefti Fajriatul MusyarrofahAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

Metadata source: OAI-PMH (metadata jurnal) https://ojs3.unpatti.ac.id/index.php/barekeng/oai, first harvested 5 Nov 2026, last seen 5 Nov 2026.
Original metadata (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">STATISTICAL CONTROL ANALYSIS OF THE STUDENT’S FINAL ASSIGNMENT COMPLETION PERIOD AT THE MATHEMATICS AND NATURAL SCIENCES FACULTY</dc:title>
	<dc:creator>Febriani, Arika</dc:creator>
	<dc:creator>Susanti, Dewi Sri</dc:creator>
	<dc:creator>Hijriati, Na'imah</dc:creator>
	<dc:description xml:lang="en-US">The final assignment is one of the requirements to get a bachelor’s degree for college students at the Faculty of Mathematics and Natural Sciences (FMIPA) University of Lambung Mangkurat (ULM). The average period of completion of the final assignment in the year 2015 until 2019 is 8 months, while the determined specification by the guideline is 6 months. The aim of this research is to identify the quality control of the final assignment completion process and whether satisfy the determined specification using statistical quality control. The used data in this research is the student’s final assignment completion period (variable data) and the nonconforming proportion of data (attribute data). The  &amp;nbsp;and  &amp;nbsp;control charts are used for variable data and  &amp;nbsp;control chart for attribute data and process capability analysis. The result of variable data is that the average period of final assignment completion is statistically in control with a control limit of  &amp;nbsp;months. For attribute data concluded that final assignment completion is statistically in control with a big average proportion that is  . For the capability analysis process by index  &amp;nbsp;and  &amp;nbsp;value sequentially is  &amp;nbsp;and for the DPU value is  . This shows that the completion period of the student’s final assignment of FMIPA ULM is not capable to fulfill the specified standard of the period.</dc:description>
	<dc:publisher xml:lang="en-US">PATTIMURA UNIVERSITY</dc:publisher>
	<dc:date>2022-06-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs3.unpatti.ac.id/index.php/barekeng/article/view/4357</dc:identifier>
	<dc:identifier>10.30598/barekengvol16iss2pp385-392</dc:identifier>
	<dc:source xml:lang="en-US">BAREKENG: Jurnal Ilmu Matematika dan Terapan; Vol 16 No 2 (2022): BAREKENG: Jurnal Ilmu Matematika dan Terapan; 385-392</dc:source>
	<dc:source>2615-3017</dc:source>
	<dc:source>1978-7227</dc:source>
	<dc:source>10.30598/barekengvol16iss2year2022</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs3.unpatti.ac.id/index.php/barekeng/article/view/4357/4464</dc:relation>
</oai_dc:dc>