Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 3

MONITORING THE SAUSAGE PRODUCT USING LANEY DEMERIT CHART BASED ANALYTICAL HIERARCHY PROCESS

BAREKENG: Jurnal Ilmu Matematika dan Terapan · Vol. 18 No. 4 (2024) · hlm. 2623–2638

DOI
10.30598/barekengvol18iss4pp2623-2638
ISSN
2615-3017, 1978-7227
Terbit
2024-10-14
Penerbit
PATTIMURA UNIVERSITY
Bahasa
eng
Lisensi
creativecommons.org/licenses/by-sa/4.0

Abstrak

Ready-to-eat sausage is a food product that has a limited shelf life. Therefore, regularly monitoring the quality of packaged ready-to-eat sausage products is important to ensure that the products meet the established quality standards. Twelve types of product defects need to be observed in the final checking process to meet the quality standards, namely Wrinkle, Dots, Leaking, Product Stain, Non-standard Form, Poor Print Quality, Vacuum Leaks, Weak Ties, Body Defects, Uneven Length, Broken Node, and Small Stain. This study aims to apply the Laney Demerit Control Chart (LDCC) and Analytical Hierarchy Process-Integrated Statistical Process Control (AHP-ISPC) methods to monitor the quality of packaged ready-to-eat sausage production at XYZ Inc. The data is from the quality testing of ready-to-eat sausage products taken from XYZ Inc. for six months from April 1, 2023, until September 30, 2023. The findings reveal that conventional control charts (u control chart, demerit control chart, and AHP-based demerit control chart) exhibited oversensitivity because it is attributed to the large number of samples produced by the company, prompting the need for a more balanced approach. Implementing the Laney u control chart, Laney demerit control chart, and the AHP-based Laney demerit control charts successfully achieved statistical control in phase I. In contrast, phase II still demonstrated challenges, particularly with the AHP-based Laney Demerit Control Chart detecting the highest number of out-of-control points. This suggests that phase II remains statistically out of control, necessitating further analysis or corrective measures to enhance process stability. Additionally, the process capability analysis indicated that the production process during the specified period lacked capability, as evidenced by a capability index value below one (0.883).

Jaringan kolaborasi para penulis

17 penulis · 30 tautan kepenulisan bersama · 2 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Institut Teknologi Sepuluh Nopember
  • Universitas Pattimura
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Muhammad MashuriInstitut Teknologi Sepuluh Nopember3
Andi Indra JayaInstitut Teknologi Sepuluh Nopember2
Ichwanul Kahfi PrasetyaInstitut Teknologi Sepuluh Nopember2
Arif Khoirul AnamInstitut Teknologi Sepuluh Nopember1
Erdi JulianInstitut Teknologi Sepuluh Nopember1
Veniola ForestryaniInstitut Teknologi Sepuluh Nopember1
Niam RosyadiInstitut Teknologi Sepuluh Nopember1
Idrus SyahzaqiInstitut Teknologi Sepuluh Nopember1
Hani Brilianti RochmantoInstitut Teknologi Sepuluh Nopember1
Tabita Yuni SusantoInstitut Teknologi Sepuluh Nopember1
Tiza Ayu ViraniaInstitut Teknologi Sepuluh Nopember1
Wibawati WibawatiInstitut Teknologi Sepuluh Nopember1
Eirene Christina SellyraInstitut Teknologi Sepuluh Nopember1
Muhammad Yahya MatdoanUniversitas Pattimura1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://ojs3.unpatti.ac.id/index.php/barekeng/oai, pertama di-harvest 5 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en-US">MONITORING THE SAUSAGE PRODUCT USING LANEY DEMERIT CHART BASED ANALYTICAL HIERARCHY PROCESS</dc:title>
	<dc:creator>Landi, Farhan</dc:creator>
	<dc:creator>Ahsan, Muhammad</dc:creator>
	<dc:creator>Rifki, Kevin Agung Fernanda</dc:creator>
	<dc:description xml:lang="en-US">Ready-to-eat sausage is a food product that has a limited shelf life. Therefore, regularly monitoring the quality of packaged ready-to-eat sausage products is important to ensure that the products meet the established quality standards. Twelve types of product defects need to be observed in the final checking process to meet the quality standards, namely Wrinkle, Dots, Leaking, Product Stain, Non-standard Form, Poor Print Quality, Vacuum Leaks, Weak Ties, Body Defects, Uneven Length, Broken Node, and Small Stain. This study aims to apply the Laney Demerit Control Chart (LDCC) and Analytical Hierarchy Process-Integrated Statistical Process Control (AHP-ISPC) methods to monitor the quality of packaged ready-to-eat sausage production at XYZ Inc. The data is from the quality testing of ready-to-eat sausage products taken from XYZ Inc. for six months from April 1, 2023, until September 30, 2023. The findings reveal that conventional control charts (u control chart, demerit control chart, and AHP-based demerit control chart) exhibited oversensitivity because it is attributed to the large number of samples produced by the company, prompting the need for a more balanced approach. Implementing the Laney u control chart, Laney demerit control chart, and the AHP-based Laney demerit control charts successfully achieved statistical control in phase I. In contrast, phase II still demonstrated challenges, particularly with the AHP-based Laney Demerit Control Chart detecting the highest number of out-of-control points. This suggests that phase II remains statistically out of control, necessitating further analysis or corrective measures to enhance process stability. Additionally, the process capability analysis indicated that the production process during the specified period lacked capability, as evidenced by a capability index value below one (0.883).</dc:description>
	<dc:publisher xml:lang="en-US">PATTIMURA UNIVERSITY</dc:publisher>
	<dc:date>2024-10-14</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://ojs3.unpatti.ac.id/index.php/barekeng/article/view/13318</dc:identifier>
	<dc:identifier>10.30598/barekengvol18iss4pp2623-2638</dc:identifier>
	<dc:source xml:lang="en-US">BAREKENG: Jurnal Ilmu Matematika dan Terapan; Vol 18 No 4 (2024): BAREKENG: Journal of Mathematics and Its Application; 2623-2638</dc:source>
	<dc:source>2615-3017</dc:source>
	<dc:source>1978-7227</dc:source>
	<dc:source>10.30598/barekengvol18iss4year2024</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://ojs3.unpatti.ac.id/index.php/barekeng/article/view/13318/8878</dc:relation>
	<dc:rights xml:lang="en-US">Copyright (c) 2024 Farhan Landi, Muhammad Ahsan, Kevin Agung Fernanda Rifki</dc:rights>
	<dc:rights xml:lang="en-US">http://creativecommons.org/licenses/by-sa/4.0</dc:rights>
</oai_dc:dc>