University scheduling timetabling problem, falls into NP hard problems. Re-searchers have tried with many techniques to find the most suitable and fastest way for solving the problem. With the emergence of multi-core systems, the parallel implementation was considered for finding the solution. Our approaches attempt to combine several techniques in two algorithms: coarse grained algorithm and multi thread tournament algorithm. The results obtained from two algorithms are compared, using an algorithm evaluation function. Considering execution time, the coarse grained algorithm performed twice better than the multi thread algorithm.
Collaboration network of the authors
3 authors ·
3 co-authorship links
Hover or tap a name to highlight its co-authors. Double-click to open the author's page.
University of Prishtina
Different organisations
Same organisation
Affiliation unknown
Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-author
Organisation
Joint articles
Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.