Reliability Constrained Unit Commitment Considering the Effect of DG and DR Program

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 8 No. 4 (2018)

DOI
10.11591/ijece.v8i4.pp1985-1996
ISSN
2088-8708, 2088-8708
Published
2018-08-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc/4.0

Abstract

Due to increase in energy prices at peak periods and increase in fuel cost, involving Distributed Generation (DG) and consumption management by Demand Response (DR) will be unavoidable options for optimal system operations. Also, with high penetration of DGs and DR programs into power system operation, the reliability criterion is taken into account as one of the most important concerns of system operators in management of power system. In this paper, a Reliability Constrained Unit Commitment (RCUC) at presence of time-based DR program and DGs integrated with conventional units is proposed and executed to reach a reliable and economic operation. Designated cost function has been minimized considering reliability constraint in prevailing UC formulation. The UC scheduling is accomplished in short-term so that the reliability is maintained in acceptable level. Because of complex nature of RCUC problem and full AC load flow constraints, the hybrid algorithm included Simulated Annealing (SA) and Binary Particle Swarm Optimization (BPSO) has been proposed to optimize the problem. Numerical results demonstrate the effectiveness of the proposed method and considerable efficacy of the time-based DR program in reducing operational costs by implementing it on IEEE-RTS79.

Collaboration network of the authors

4 authors · 4 co-authorship links · 3 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Shahed University
  • Islamic Azad University, Tehran
  • University of Eyvanekey
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Mehrdad MoradiShahed University1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Reliability Constrained Unit Commitment Considering the Effect of DG and DR Program</dc:title><dc:creator>Aliakbari, Masoud</dc:creator><dc:creator>Maghouli, Pouria</dc:creator><dc:creator>Allah Aalami, Habib</dc:creator><dc:description>&lt;jats:p&gt;Due to increase in energy prices at peak periods and increase in fuel cost, involving Distributed Generation (DG) and consumption management by Demand Response (DR) will be unavoidable options for optimal system operations. Also, with high penetration of DGs and DR programs into power system operation, the reliability criterion is taken into account as one of the most important concerns of system operators in management of power system. In this paper, a Reliability Constrained Unit Commitment (RCUC) at presence of time-based DR program and DGs integrated with conventional units is proposed and executed to reach a reliable and economic operation. Designated cost function has been minimized considering reliability constraint in prevailing UC formulation. The UC scheduling is accomplished in short-term so that the reliability is maintained in acceptable level. Because of complex nature of RCUC problem and full AC load flow constraints, the hybrid algorithm included Simulated Annealing (SA) and Binary Particle Swarm Optimization (BPSO) has been proposed to optimize the problem. Numerical results demonstrate the effectiveness of the proposed method and considerable efficacy of the time-based DR program in reducing operational costs by implementing it on IEEE-RTS79.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2018-08-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v8i4.pp1985-1996</dc:identifier><dc:identifier>10.11591/ijece.v8i4.pp1985-1996</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 8 No 4 (2018); 1985</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/7819/8835</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>