As part of the integrated strategy of the Moroccan state aimed at the social and economic development of the Moroccan rural community, an electrification program has been in place since the 90s. This program, called PEGR, has for main objective the improvement of the electrification rate for the national rural world. Given the large number of villages to be electrified and the colossal budget that will induce, several criteria have been retained to objectively distinguish the villages with the highest priority for electrification. Given the nature of this problem to be solved, which is a multicriteria decision aid problem, we propose in this article to use the multicriteria aggregation method ELECTRE III to rank the villages from the highest priority to the lowest priority for the electrification.
Collaboration network of the authors
17 authors ·
42 co-authorship links
· 18 across different organisations
Hover or tap a name to highlight its co-authors. Double-click to open the author's page.
Sidi Mohamed Ben Abdellah University
Université Hassan 1er
Mohamed I University
École Supérieure d'Électronique de l'Ouest
Different organisations
Same organisation
Affiliation unknown
Thicker line = more joint articles · bigger circle = more articles
Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.