Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

Economical and Reliable Expansion Alternative of Composite Power System under Restructuring

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 8 No. 6 (2018)

DOI
10.11591/ijece.v8i6.pp4790-4799
ISSN
2088-8708, 2088-8708
Published
2018-12-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc/4.0

Abstract

The paper intends to select the most economical and reliable expansion alternative of a composite power system to meet the expected future load growth. In order to reduce time computational quantity, a heuristic algorithm is adopted for composite power system reliability evaluation is proposed. The proposed algorithm is based on Monte-Carlo simulation method. The reliability indices are estimated for system base case and for the case of adding peaking generation units. The least cost reserve margin for the addition of five 20MW generating units sequentially is determined. Using the proposed algorithm an increment comparison approach used to illustrate the effect of the added units on the interruption and on the annual net gain costs. A flow chart introduced to explain the basic methodology to have an adequate assessment of a power system using Monte Carlo Simulation. The IEEE RTS (24-bus, 38-line) and The Jordanian Electrical Power System (46-bus and 92-line) were examined to illustrate how to make decisions in power system planning and expansions.

Collaboration network of the authors

13 authors · 32 co-authorship links · 4 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Al-Balqa Applied University
  • Najran University
  • Palestine Technical University - Kadoorie
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Wael A. SalahPalestine Technical University - Kadoorie1
Ghazi QaryoutiAffiliation unknown1
Abdel Rahman SalbadAl-Balqa Applied University1
Sohaib A. TamimiAl-Balqa Applied University1
Qazem M. JaberAl-Balqa Applied University1
Ashraf SamarahAl-Balqa Applied University1
Ayman Y. Al-RawashdehAl-Balqa Applied University1
Abdallah Ershoud AlzyoudAffiliation unknown1
Khalaf Y. AlzyoudAffiliation unknown1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Economical and Reliable Expansion Alternative of Composite Power System under Restructuring</dc:title><dc:creator>Dalabeeh, Ali S.</dc:creator><dc:creator>Almofleh, Anwar</dc:creator><dc:creator>Alzyoud, Abdallah R</dc:creator><dc:creator>Ayman, Hindi T.</dc:creator><dc:description>&lt;jats:p&gt;The paper intends to select the most economical and reliable expansion alternative of a composite power system to meet the expected future load growth. In order to reduce time computational quantity, a heuristic algorithm is adopted for composite power system reliability evaluation is proposed. The proposed algorithm is based on Monte-Carlo simulation method. The reliability indices are estimated for system base case and for the case of adding peaking generation units. The least cost reserve margin for the addition of five 20MW generating units sequentially is determined. Using the proposed algorithm an increment comparison approach used to illustrate the effect of the added units on the interruption and on the annual net gain costs. A flow chart introduced to explain the basic methodology to have an adequate assessment of a power system using Monte Carlo Simulation. The IEEE RTS (24-bus, 38-line) and The Jordanian Electrical Power System (46-bus and 92-line) were examined to illustrate how to make decisions in power system planning and expansions.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2018-12-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v8i6.pp4790-4799</dc:identifier><dc:identifier>10.11591/ijece.v8i6.pp4790-4799</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 8 No 6 (2018); 4790</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/10769/11217</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>