Abstract

To make a perfect project plan, the software size of the order from the customer is the most important factor. The biggest challenge for the project manager is to estimate the project end date in the beginning of the project i.e. in project planning phase with realistic accuracy. Apart from other major inputs to estimate the project end date, expected team capability (productivity) and estimated software size are the major inputs that may influence the project end date. Software size is one of the most significant independent metric available in the planning phase and project manager has to estimate the other metrics based on the initial estimated software size. There is no direct relationship available between software size and project duration or software size and team productivity, however, there are industry data published by Quantitative Software Management and ISBSG that shows how these metrics influence each other. In this paper, using the data published by ISBSG and Quantitative Software Management, we try to statistically establish how productivity and project duration are influenced by software size. We have done linear regression analysis by generating the secondary data based on the data published by ISBSG and Quantitative Software Management. Linear regression equation validated with the actual project data and experimental results suggest that that productivity is significantly dependent on software size, however, project duration does not significantly depend on software size but may also be dependent on other metrics like team size, apart from software size.

Collaboration network of the authors

3 authors · 3 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Amity University
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 1 Nov 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>How software size influence productivity and project duration</dc:title><dc:creator>Bhardwaj, Mridul</dc:creator><dc:creator>Rana, Ajay</dc:creator><dc:creator>Sharma, Neeraj Kumar</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;p&amp;gt;To make a perfect project plan, the software size of the order from the customer is the most important factor. The biggest challenge for the project manager is to estimate the project end date in the beginning of the project i.e. in project planning phase with realistic accuracy. Apart from other major inputs to estimate the project end date, expected team capability (productivity) and estimated software size are the major inputs that may influence the project end date. Software size is one of the most significant independent metric available in the planning phase and project manager has to estimate the other metrics based on the initial estimated software size. There is no direct relationship available between software size and project duration or software size and team productivity, however, there are industry data published by Quantitative Software Management and ISBSG that shows how these metrics influence each other. In this paper, using the data published by ISBSG and Quantitative Software Management, we try to statistically establish how productivity and project duration are influenced by software size. We have done linear regression analysis by generating the secondary data based on the data published by ISBSG and Quantitative Software Management. Linear regression equation validated with the actual project data and experimental results suggest that that productivity is significantly dependent on software size, however, project duration does not significantly depend on software size but may also be dependent on other metrics like team size, apart from software size.&amp;lt;/p&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2019-06-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v9i3.pp2006-2017</dc:identifier><dc:identifier>10.11591/ijece.v9i3.pp2006-2017</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 9 No 3 (2019); 2006</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/11034/12099</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>