Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

An analytical multicriteria model based on graph theory for reliability enhancement in distribution electrical networks

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 9 No. 6 (2019)

DOI
10.11591/ijece.v9i6.pp4625-4636
ISSN
2088-8708, 2088-8708
Published
2019-12-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc/4.0

Abstract

The electrical distribution network is a critical and complex system in terms of safety and reliability, because it is composed of different components (switches, reclosers, etc.). The improvement of its reliability is therefore one of the most important tasks through the good management of remote-controlled switches and reclosers in this network. This paper presents an analytical model based on graph theory to evaluate SAIDI and SAIFI indices based on the network architecture and the location of remote-controlled reclosers and switches. These indicators have been used to formalize a multi-objective mathematical model that respects the real operation constraints of equipments in smart grid. The applied model, in this article, was evaluated on an IEEE 13 bus network using the TOPSIS method to determine the optimal location of the switches and reclosers and to improve the overall reliability of the distribution network.

Collaboration network of the authors

19 authors · 56 co-authorship links · 4 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • University of Hassan II Casablanca
  • Cadi Ayyad University
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Faissal ElmariamiUniversity of Hassan II Casablanca20
Nazha CherkaouiAffiliation unknown9
Mohamed Nouh DazahraAffiliation unknown8
Elmahdi KhoudryUniversity of Hassan II Casablanca8
Abdelmajid BerdaiUniversity of Hassan II Casablanca6
Touria HaidiUniversity of Hassan II Casablanca4
Ali TarraqUniversity of Hassan II Casablanca4
Chaimae ZedakUniversity of Hassan II Casablanca3
Bouchra CheddadiUniversity of Hassan II Casablanca1
Zineb El IdrissiUniversity of Hassan II Casablanca1
Ali TarrakAffiliation unknown1
Naima AgouzoulUniversity of Hassan II Casablanca1
Aziz OukennouCadi Ayyad University1
Rabiaa GadalUniversity of Hassan II Casablanca1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>An analytical multicriteria model based on graph theory for reliability enhancement in distribution electrical networks</dc:title><dc:creator>Lekbich, Anass</dc:creator><dc:creator>Belfqih, Abdelaziz</dc:creator><dc:creator>Ouaderhman, Tayeb</dc:creator><dc:creator>Boukherouaa, Jamal</dc:creator><dc:creator>El Mariami, Faissal</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;p&amp;gt;The electrical distribution network is a critical and complex system in terms of safety and reliability, because it is composed of different components (switches, reclosers, etc.). The improvement of its reliability is therefore one of the most important tasks through the good management of remote-controlled switches and reclosers in this network. This paper presents an analytical model based on graph theory to evaluate SAIDI and SAIFI indices based on the network architecture and the location of remote-controlled reclosers and switches. These indicators have been used to formalize a multi-objective mathematical model that respects the real operation constraints of equipments in smart grid. The applied model, in this article, was evaluated on an IEEE 13 bus network using the TOPSIS method to determine the optimal location of the switches and reclosers and to improve the overall reliability of the distribution network.&amp;lt;/p&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2019-12-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v9i6.pp4625-4636</dc:identifier><dc:identifier>10.11591/ijece.v9i6.pp4625-4636</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 9 No 6 (2019); 4625</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/16220/13308</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>