Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 1

Goal Model to Business Process Model: A Methodology for Enterprise Government Tourism System Development

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 6 No. 6 (2016)

DOI
10.11591/ijece.v6i6.pp3031-3036
ISSN
2088-8708, 2088-8708
Terbit
2016-12-01
Penerbit
Institute of Advanced Engineering and Science
Lisensi
creativecommons.org/licenses/by-nc/4.0

Abstrak

The critcal factor in successfully in system development is the requirement phase. The requirement should meets with its purpose. In order to achieve it, the methodology for requrement analysis is needed. Nowdays, the complexity of e-governemnt applications is grown significantly in the government environment. E-government applications should be developed based on regulations in order to achieve the goal model of government entitties. However, the goal model could not used directly to make business process model. In order to solve this problem,this paper presents and proposed a Methodology to extract goal model into business process model that called GBPM Methodology. It can support the requirement analysis phase, especially in enterprise government tourism system. This methodology consists of two methods, there are (1) Method for convert goal model to business use case diagram, (2) Method for convert business use case diagram to activity diagram. We do the experiment in e-government applications domain. This methodology suitable with enterprise government tourism system development.

Jaringan kolaborasi para penulis

7 penulis · 12 tautan kepenulisan bersama · 10 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Binus University
  • Sunan Kalijaga State Islamic University Yogyakarta
  • Universitas Syiah Kuala
  • Universiti Teknologi MARA
  • Yarsi University
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Nilo LegowoBinus University1
Ahmad Fathul MaarifSunan Kalijaga State Islamic University Yogyakarta1
Nurul HudaYarsi University1
Darmawan DarmawanUniversitas Syiah Kuala1
Siti Nor Amira MohamadUniversiti Teknologi MARA1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Data ini berasal dari Crossref (yang disetorkan penerbit), karena endpoint OAI-PMH milik jurnal tidak dapat di-harvest.

Sumber metadata: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, pertama di-harvest 27 Okt 2026, terakhir terlihat 15 Nov 2026.
Metadata sebagai oai_dc, dikonversi dari Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Goal Model to Business Process Model: A Methodology for Enterprise Government Tourism System Development</dc:title><dc:creator>Fajar, Ahmad Nurul</dc:creator><dc:creator>Shofi, Imam Marzuki</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;p&amp;gt;The critcal factor in successfully in system development is the requirement phase. The requirement should meets with its purpose. In order to achieve it, the methodology for requrement analysis is needed. Nowdays, the complexity of e-governemnt applications is grown significantly in the government environment. E-government applications should be developed based on regulations in order to achieve the goal model of government entitties. However, the goal model could not used directly to make business process model. In order to solve this problem,this paper presents and proposed a Methodology to extract goal model into business process model that called GBPM Methodology. It can support the requirement analysis phase, especially in enterprise government tourism system. This methodology consists of two methods, there are (1) Method for convert goal model to business use case diagram, (2) Method for convert business use case diagram to activity diagram. We do the experiment in e-government applications domain. This methodology suitable with enterprise government tourism system development.&amp;lt;/p&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2016-12-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v6i6.pp3031-3036</dc:identifier><dc:identifier>10.11591/ijece.v6i6.pp3031-3036</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 6 No 6 (2016); 3031</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/5920/5582</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>