Melola Discovery

← Melola Discovery

Jurnal

Alternatif Pengoptimalisasian Masa Pakai Tempat Pemrosesan Akhir Di Kota Bandar Lampung

Jurnal Perencanaan dan Pengembangan Kebijakan · Vol. 4 No. 2 (2024)

DOI
10.35472/jppk.v4i2.1845
ISSN
2775-0566
Terbit
2024-08-15
Penerbit
Institut Teknologi Sumatra

Abstrak

The problem of waste piles that occur in Bakung Landfill, Bandar Lampung City is influenced by demographic and geographic factors. This Open Dumping alternative is no longer feasible to be applied in accordance with Law No. 18 of 2008 because no waste management is carried out so that it can shorten the life of the landfill. The land area of Bakung Landfill, which was built at 14 Ha, has now remained at ± 3.2469 Ha. So research is needed to analyze the right waste management alternatives to optimize the service life of Bakung Landfill, Bandar Lampung City by considering cost and service life scenarios. The results showed that the increasing waste generation in Bandar Lampung City is related to demographic and geographic factors, thus affecting the increase in the area of need for Bakung Landfill in Bandar Lampung City. There are 3 alternatives to waste management that can optimize the service life of the landfill, namely the first Sanitary Lanfdill Alternative with a service life of 3.6 years, second Alternative Waste to Energy method Refuse Derived Fuel with a service life of 6 years and third Alternative Waste to Energy Incineration method with a service life of >10 years.

Jaringan kolaborasi para penulis

22 penulis · 38 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Muhammad Zainal IbadAfiliasi tidak diketahui2
Puspita DirgahayaniAfiliasi tidak diketahui1
Fatin HaniyahAfiliasi tidak diketahui1
Sri MaryatiAfiliasi tidak diketahui1
Diah Mayang SariAfiliasi tidak diketahui1
Mega Muli UtamiAfiliasi tidak diketahui1
Asep Nurul Ajiid MustofaAfiliasi tidak diketahui1
Aulia Zakia ChulwaAfiliasi tidak diketahui1
Anggi SijabatAfiliasi tidak diketahui1
Muhammad Abdul Mubdi BindarAfiliasi tidak diketahui1
Hana RafifahAfiliasi tidak diketahui1
Dwi Utomo AdikaryaAfiliasi tidak diketahui1
Viola Ary SherlintyaAfiliasi tidak diketahui1
Verlina AgustineAfiliasi tidak diketahui1
Yemima Sahmura VividiaAfiliasi tidak diketahui1
Amelia Tri WidyaAfiliasi tidak diketahui1
A. Dwi Eva LestariAfiliasi tidak diketahui1
Antusias NurzukhrufaAfiliasi tidak diketahui1
Melati Rahmi AzizaAfiliasi tidak diketahui1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Data ini berasal dari Crossref (yang disetorkan penerbit), karena endpoint OAI-PMH milik jurnal tidak dapat di-harvest.

Sumber metadata: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2775-0566/works, pertama di-harvest 5 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata sebagai oai_dc, dikonversi dari Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Alternatif Pengoptimalisasian Masa Pakai Tempat Pemrosesan Akhir Di Kota Bandar Lampung</dc:title><dc:creator>Ali, Nabilah Afriyani</dc:creator><dc:creator>Putri, Husna Tiara</dc:creator><dc:creator>Tanjung, Adinda Sekar</dc:creator><dc:description>&lt;jats:p&gt;The problem of waste piles that occur in Bakung Landfill, Bandar Lampung City is influenced by demographic and geographic factors. This Open Dumping alternative is no longer feasible to be applied in accordance with Law No. 18 of 2008 because no waste management is carried out so that it can shorten the life of the landfill. The land area of Bakung Landfill, which was built at 14 Ha, has now remained at ± 3.2469 Ha. So research is needed to analyze the right waste management alternatives to optimize the service life of Bakung Landfill, Bandar Lampung City by considering cost and service life scenarios. The results showed that the increasing waste generation in Bandar Lampung City is related to demographic and geographic factors, thus affecting the increase in the area of need for Bakung Landfill in Bandar Lampung City. There are 3 alternatives to waste management that can optimize the service life of the landfill, namely the first Sanitary Lanfdill Alternative with a service life of 3.6 years, second Alternative Waste to Energy method Refuse Derived Fuel with a service life of 6 years and third Alternative Waste to Energy Incineration method with a service life of &amp;gt;10 years.&lt;/jats:p&gt;</dc:description><dc:publisher>Institut Teknologi Sumatra</dc:publisher><dc:date>2024-08-15</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.35472/jppk.v4i2.1845</dc:identifier><dc:identifier>10.35472/jppk.v4i2.1845</dc:identifier><dc:source>Jurnal Perencanaan dan Pengembangan Kebijakan; Vol 4 No 2 (2024); 147</dc:source><dc:source>2775-0566</dc:source><dc:relation>https://journal.itera.ac.id/index.php/jppk/article/download/1845/582</dc:relation></oai_dc:dc>