Guidelines Aimed at Reducing the Risks of User Acceptance Delay in the Context of an IT Service Project Management Plan

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 5 No. 4 (2015)

DOI
10.11591/ijece.v5i4.pp832-839
ISSN
2088-8708, 2088-8708
Published
2015-08-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc/4.0

Abstract

Delays in the user acceptance of information technology ( IT) service projects in Korea have occurred frequently due to various risk factors. User acceptance delays may hinder the achievement of the client’s project objectives and cause schedule delays or cost overruns. Furthermore, the client may impose a delay charge and claim for additional damages, causing serious disputes between buyer and supplier. The main causes of user acceptance delays are unclear user requirements, changes in user requirements, poor-quality development outputs, excessive functional and non-functional errors, lack of user involvement, unclear user roles and responsibilities, and unclear criteria of user acceptance test.We help foster the timely completion of user acceptance by proposing a method of identifying the risk factors in user acceptance delay and creating a project management plan to weed out the identified risks. We propose a guideline for an IT service management plan that weeds out or lowers the risk factors well in advance. To validate the guideline’s utility, we apply it to IT service projects. The results show that the guideline is effective in identifying and removing risk factors affecting delays in the user acceptance of IT service projects.

Collaboration network of the authors

3 authors · 3 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Kookmin University
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Guidelines Aimed at Reducing the Risks of User Acceptance Delay in the Context of an IT Service Project Management Plan</dc:title><dc:creator>Jeong, Eun Joo</dc:creator><dc:creator>Bae, Ji Hwan</dc:creator><dc:creator>Jeong, Seung Ryul</dc:creator><dc:description>&lt;jats:p&gt;Delays in the user acceptance of information &amp;lt;strong&amp;gt;technology (&amp;lt;/strong&amp;gt;IT) service projects in Korea have occurred frequently due to various risk factors. User acceptance delays may hinder the achievement of the client’s project objectives and cause schedule delays or cost overruns. Furthermore, the client may impose a delay charge and claim for additional damages, causing serious disputes between buyer and supplier. The main causes of user acceptance delays are unclear user requirements, changes in user requirements, poor-quality development outputs, excessive functional and non-functional errors, lack of user involvement, unclear user roles and responsibilities, and unclear criteria of user acceptance test.We help foster the timely completion of user acceptance by proposing a method of identifying the risk factors in user acceptance delay and creating a project management plan to weed out the identified risks. We propose a guideline for an IT service management plan that weeds out or lowers the risk factors well in advance. To validate the guideline’s utility, we apply it to IT service projects. The results show that the guideline is effective in identifying and removing risk factors affecting delays in the user acceptance of IT service projects.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2015-08-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v5i4.pp832-839</dc:identifier><dc:identifier>10.11591/ijece.v5i4.pp832-839</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 5 No 4 (2015); 832</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/5678/4645</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>