Practical electrical energy production to solve the shortage in electricity in Palestine and Pay Back period

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 9 No. 6 (2019)

DOI
10.11591/ijece.v9i6.pp4610-4616
ISSN
2088-8708, 2088-8708
Published
2019-12-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc/4.0

Abstract

In this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. The daily average wind speed data had been analyzed and fitted to the Weibull probability distribution function. The parameters of Weibull had been calculated by author using Graphical method the applied example wind turbine is 5kw wind turbine generator this is suitable turbine for small scale based on wind speed records on the coastal plain of Palestine. This study calculated the energy that can produce from wind turbine to estimate the revenue of any possible project in wind energy conversion system based on unit area. Energy has been calculated wind energy using two different method based on Weibull data and measured data. The total amount of energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed. Payback period for the project in wind energy turbines is around 3 years which make the generation electricity possible for small scale but not commercial. This study will lead to assess the wind energy production in Palestine to encourage investment in renewable energy sectors.

Collaboration network of the authors

8 authors · 25 co-authorship links · 10 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • International Islamic University Malaysia
  • International Islamic University, Islamabad
  • Özyeğin University
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Alhareth ZyoudInternational Islamic University Malaysia4
Nurul Fadzlin HasbullahaAffiliation unknown4
Sheroz KhanInternational Islamic University, Islamabad4

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Practical electrical energy production to solve the shortage in electricity in Palestine and Pay Back period</dc:title><dc:creator>Badawi, Ahmed S A</dc:creator><dc:creator>Hasbullah, Nurul Fadzlin</dc:creator><dc:creator>Yusoff, Siti</dc:creator><dc:creator>Hashim, Aisha</dc:creator><dc:creator>Elamassie, Mohammed</dc:creator><dc:description>&lt;jats:p&gt;In this paper power energy had been estimated based on actual wind speed records in a coastal city in Palestine Ashdod. The main aims of this study to determine the feasibility of wind turbine and to estimate payback period. Therefore, to encourage investment in renewable energy in Palestine. The daily average wind speed data had been analyzed and fitted to the Weibull probability distribution function. The parameters of Weibull had been calculated by author using Graphical method the applied example wind turbine is 5kw wind turbine generator this is suitable turbine for small scale based on wind speed records on the coastal plain of Palestine. This study calculated the energy that can produce from wind turbine to estimate the revenue of any possible project in wind energy conversion system based on unit area. Energy has been calculated wind energy using two different method based on Weibull data and measured data. The total amount of energy for 2010 is 10749.8 kw.hr/m2 based on measured wind speed. Payback period for the project in wind energy turbines is around 3 years which make the generation electricity possible for small scale but not commercial. This study will lead to assess the wind energy production in Palestine to encourage investment in renewable energy sectors.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2019-12-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v9i6.pp4610-4616</dc:identifier><dc:identifier>10.11591/ijece.v9i6.pp4610-4616</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 9 No 6 (2019); 4610</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/17347/13142</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>