Economic load dispatch among generating units is very important for any power plant. In this work, the economic load dispatch was made at Egbin Thermal Power plant supplying a total load of 600MW using six generating units. In carrying out this study, transmission losses were assumed to be included into the load supplied. Also three different combinations in the form of 6, 5 and 4 units commitment were considered. In each case, the total load was optimally dispatched between committed generating units using Particle Swarm Optimization (PSO). Similarly, the generation cost for each generating unit was determined. For case 1, the six generators were committed and the generation cost is 2,100,685.069$/h. For case 2, five generators were committed and the generation cost is 2,520,861.947$/h. For case 3, four generators were committed and the generation cost is 3,150,621.685$/h. From all considered cases, it was found that, the minimum generation cost was achieved when all six generating units were committed and a total of 420,178.878$/h was saved.
Collaboration network of the authors
8 authors ·
16 co-authorship links
· 4 across different organisations
Hover or tap a name to highlight its co-authors. Double-click to open the author's page.
University of Nigeria
Enugu State University of Science and Technology
Affiliation unknown
Different organisations
Same organisation
Affiliation unknown
Thicker line = more joint articles · bigger circle = more articles
Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.