Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

Dynamics performance of the wind-power supply chain with transmission capacity constraints

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 10 No. 2 (2020)

DOI
10.11591/ijece.v10i2.pp1142-1148
ISSN
2088-8708, 2088-8708
Published
2020-04-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-nc/4.0

Abstract

Previous studies have shown that poor performance of energy supply chains arises from incorrectly interpret feedback information and time delays between decisions and actions in energy policy. This paper assesses alternatives to improve performance of wind-power supply chain with transmission constraints that contribute to enhance response capacity of the wind industry to changes of energy policy. In order to test these alternatives, this paper used a simulation model with system dynamics (SD), taking as case study Brazil. The simulation model represents the main time lags and fluctuations that exist in the wind-power supply chain. Four simulation scenarios were proposed to evaluate changes in auction-based policy in wind industry of Brazil. The results are related to operational capacity, inventory levels and response capacity. This paper provides an analysis of different scenarios that contribute with synchronization of auctions policy, including transmission capacity constraints.

Collaboration network of the authors

10 authors · 23 co-authorship links · 15 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Universidad de Bogotá Jorge Tadeo Lozano
  • Universidad Militar Nueva Granada
  • Universidade Federal de Santa Catarina
  • Universidad Nacional de Colombia
  • University of Stuttgart
  • Universidad EIA
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Andrés Julián AristizábalUniversidad de Bogotá Jorge Tadeo Lozano2
Daniel OspinaUniversidad de Bogotá Jorge Tadeo Lozano1
Sebastián ZapataUniversidad Nacional de Colombia1
Mónica CastañedaUniversidad de Bogotá Jorge Tadeo Lozano1
Nicolas EscalanteUniversity of Stuttgart1
Diego Alberto CarreñoUniversidad de Bogotá Jorge Tadeo Lozano1
Enrique Ángel SanintUniversidad EIA1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 1 Nov 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Dynamics performance of the wind-power supply chain with transmission capacity constraints</dc:title><dc:creator>Herrera, Milton M.</dc:creator><dc:creator>Uriona, Mauricio</dc:creator><dc:creator>Dyner, Isaac</dc:creator><dc:description>&lt;jats:p&gt;Previous studies have shown that poor performance of energy supply chains arises from incorrectly interpret feedback information and time delays between decisions and actions in energy policy. This paper assesses alternatives to improve performance of wind-power supply chain with transmission constraints that contribute to enhance response capacity of the wind industry to changes of energy policy. In order to test these alternatives, this paper used a simulation model with system dynamics (SD), taking as case study Brazil. The simulation model represents the main time lags and fluctuations that exist in the wind-power supply chain. Four simulation scenarios were proposed to evaluate changes in auction-based policy in wind industry of Brazil. The results are related to operational capacity, inventory levels and response capacity. This paper provides an analysis of different scenarios that contribute with synchronization of auctions policy, including transmission capacity constraints.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2020-04-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v10i2.pp1142-1148</dc:identifier><dc:identifier>10.11591/ijece.v10i2.pp1142-1148</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 10 No 2 (2020); 1142</dc:source><dc:source>2088-8708</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/19057/pdf</dc:relation><dc:rights>http://creativecommons.org/licenses/by-nc/4.0</dc:rights></oai_dc:dc>