Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

A probabilistic multi-objective approach for FACTS devices allocation with different levels of wind penetration under uncertainties and load correlation

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 10 No. 4 (2020)

DOI
10.11591/ijece.v10i4.pp3898-3910
ISSN
2722-2578, 2088-8708
Published
2020-08-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

This study presents a probabilistic multi-objective optimization approach to obtain the optimal locations and sizes of static var compensator (SVC) and thyristor-controlled series capacitor (TCSC) in a power transmission network with large level of wind generation. In this study, the uncertainties of the wind power generation and correlated load demand are considered. The uncertainties are modeled in this work using the points estimation method (PEM). The optimization problem is solved using the Multi-objective particle swarm optimization (MOPSO) algorithm to find the best position and rating of the flexible AC transmission system (FACTS) devices. The objective of the problem is to maximize the system loadability while minimizing the power losses and FACTS devices installation cost. Additionally, a technique based on fuzzy decision-making approach is employed to extract one of the Pareto optimal solutions as the best compromise one. The proposed approach is applied on the modified IEEE 30-bus system. The numerical results evince the effectiveness of the proposed approach and shows the economic benefits that can be achieved when considering the FACTS controller.

Collaboration network of the authors

10 authors · 20 co-authorship links · 9 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Ain Shams University
  • The Future University
  • Affiliation unknown
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
M. M. H. ElrobyAin Shams University6
M. A. Moustafa HassanAffiliation unknown4
M. A. Moustafa HassanAffiliation unknown2
R. H. ShehataAin Shams University1
Almoataz Youssef AbdelazizThe Future University1
Mostafa A. Al-GabalawyThe Future University1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>A probabilistic multi-objective approach for FACTS devices allocation with different levels of wind penetration under uncertainties and load correlation</dc:title><dc:creator>EL-Azab, M.</dc:creator><dc:creator>Omran, W. A.</dc:creator><dc:creator>Mekhamer, S. F.</dc:creator><dc:creator>Talaat, H. E. A.</dc:creator><dc:description>&lt;jats:p&gt;This study presents a probabilistic multi-objective optimization approach to obtain the optimal locations and sizes of static var compensator (SVC) and thyristor-controlled series capacitor (TCSC) in a power transmission network with large level of wind generation. In this study, the uncertainties of the wind power generation and correlated load demand are considered. The uncertainties are modeled in this work using the points estimation method (PEM). The optimization problem is solved using the Multi-objective particle swarm optimization (MOPSO) algorithm to find the best position and rating of the flexible AC transmission system (FACTS) devices. The objective of the problem is to maximize the system loadability while minimizing the power losses and FACTS devices installation cost. Additionally, a technique based on fuzzy decision-making approach is employed to extract one of the Pareto optimal solutions as the best compromise one. The proposed approach is applied on the modified IEEE 30-bus system. The numerical results evince the effectiveness of the proposed approach and shows the economic benefits that can be achieved when considering the FACTS controller.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2020-08-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v10i4.pp3898-3910</dc:identifier><dc:identifier>10.11591/ijece.v10i4.pp3898-3910</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 10 No 4 (2020); 3898</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/19185/14061</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>