Melola Discovery

← Melola Discovery

Jurnal Tanpa peringkat SINTA

Effectiveness Study of Twin Tunnel Nanjung in Flood Management of Citarum River

Jurnal Teknik Sipil dan Perencanaan · Vol. 27 No. 1 (2025) · hlm. 111–121

DOI
10.15294/jtsp.v27i1/13295
ISSN
2503-1899, 1411-1772
Terbit
2025-05-01
Penerbit
Universitas Negeri Semarang
Bahasa
eng

Abstrak

Indonesia has a high risk of natural disasters such as flooding, which particularly affects the West Java region. Floods often occur due to high flow rates that exceed the capacity of water bodies, triggered by rainfall and population growth. Based on the data collected, floods hit Dayeuhkolot, Bojongsoang and Baleendah Subdistricts with water levels between 40 - 200 cm which resulted in 919 households with 3,577 people displaced. Flood control can basically be done in various ways, but it needs to consider the whole system and find the most optimal one. To reduce flooding around the Upper Citarum, the Nanjung Twin Tunnels were built. Therefore, researchers are interested in further reviewing the performance and effectiveness of the Nanjung Twin Tunnel for the handling of the Upper Citarum. This research uses descriptive method with HEC-RAS v6.5 software modeling approach with 2D method. From the modeling results, it was found that after the installation of Twin Tunnel Nanjung, the flood inundation area was reduced by 64% from 13.44 km2 to 4.8 km2 and the depth was reduced by 2-3 m on average at 5 points in Dayeuhkolot area.

Kata kunci

Jaringan kolaborasi para penulis

3 penulis · 2 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Indonesia University of Education
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Ahmad Fakhrur RoziIndonesia University of Education1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/jtsp/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Effectiveness Study of Twin Tunnel Nanjung in Flood Management of Citarum River</dc:title>
	<dc:creator xml:lang="en">Sindy Witari</dc:creator>
	<dc:creator xml:lang="en">Rakhmat Yusuf</dc:creator>
	<dc:subject xml:lang="en">flood</dc:subject>
	<dc:subject xml:lang="en">Twin Tunnel Nanjung</dc:subject>
	<dc:subject xml:lang="en">Performance</dc:subject>
	<dc:subject xml:lang="en">Effectiveness</dc:subject>
	<dc:description xml:lang="en">Indonesia has a high risk of natural disasters such as flooding, which particularly affects the West Java region. Floods often occur due to high flow rates that exceed the capacity of water bodies, triggered by rainfall and population growth. Based on the data collected, floods hit Dayeuhkolot, Bojongsoang and Baleendah Subdistricts with water levels between 40 - 200 cm which resulted in 919 households with 3,577 people displaced. Flood control can basically be done in various ways, but it needs to consider the whole system and find the most optimal one. To reduce flooding around the Upper Citarum, the Nanjung Twin Tunnels were built. Therefore, researchers are interested in further reviewing the performance and effectiveness of the Nanjung Twin Tunnel for the handling of the Upper Citarum. This research uses descriptive method with HEC-RAS v6.5 software modeling approach with 2D method. From the modeling results, it was found that after the installation of Twin Tunnel Nanjung, the flood inundation area was reduced by 64% from 13.44 km2 to 4.8 km2 and the depth was reduced by 2-3 m on average at 5 points in Dayeuhkolot area.</dc:description>
	<dc:publisher xml:lang="en">Universitas Negeri Semarang</dc:publisher>
	<dc:date>2025-05-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unnes.ac.id/journals/jtsp/article/view/13295</dc:identifier>
	<dc:identifier>10.15294/jtsp.v27i1/13295</dc:identifier>
	<dc:source xml:lang="en">Jurnal Teknik Sipil dan Perencanaan; Vol. 27 No. 1 (2025): Jurnal Teknik Sipil dan Perencanaan; 111 - 121</dc:source>
	<dc:source>2503-1899</dc:source>
	<dc:source>1411-1772</dc:source>
	<dc:source>10.15294/jtsp.v27i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.unnes.ac.id/journals/jtsp/article/view/13295/3851</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2025 Jurnal Teknik Sipil dan Perencanaan</dc:rights>
</oai_dc:dc>