Melola Discovery

← Melola Discovery

Jurnal Tanpa peringkat SINTA

The Impact of The Wage System on Estimating Construction Worker Productivity

Jurnal Teknik Sipil dan Perencanaan · Vol. 27 No. 2 (2025) · hlm. 82–90

DOI
10.15294/jtsp.v27i2.15020
ISSN
2503-1899, 1411-1772
Terbit
2025-10-31
Penerbit
Universitas Negeri Semarang
Bahasa
eng

Abstrak

A construction project's productivity significantly depends on its workforce's efficiency. This study examines the effect of different wage systems—daily wage and piece-rate (borongan) systems—on the productivity of construction workers, using a neural network model for analysis. Data were collected from workers at the ESP-Control Building Project of PLTU Units 9 & 10 through field observations and questionnaires. Productivity was assessed via the Work Sampling method, while SPSS software was employed to analyze key factors influencing worker performance. The results show that the piece-rate system is more effective in enhancing productivity than the daily wage system, as indicated by higher Labour Utilization Rates (LUR). A neural network model developed for productivity estimation achieved high accuracy, with R² values of 0.815 for the daily wage system and 0.817 for the piece-rate system. Practically, these findings can help project managers improve scheduling efficiency, minimize idle time, and reduce labor costs by adopting an appropriate wage system.

Kata kunci

Jaringan kolaborasi para penulis

2 penulis · 1 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Mercu Buana University
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/jtsp/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">The Impact of The Wage System on Estimating Construction Worker Productivity</dc:title>
	<dc:creator xml:lang="en">Mirnayani, Mirnayani</dc:creator>
	<dc:creator xml:lang="en">Yunita Dian Suwandari</dc:creator>
	<dc:subject xml:lang="en">Construction workers</dc:subject>
	<dc:subject xml:lang="en">Neural Network</dc:subject>
	<dc:subject xml:lang="en">Productivity</dc:subject>
	<dc:subject xml:lang="en">Wage system</dc:subject>
	<dc:description xml:lang="en">A construction project's productivity significantly depends on its workforce's efficiency. This study examines the effect of different wage systems—daily wage and piece-rate (borongan) systems—on the productivity of construction workers, using a neural network model for analysis. Data were collected from workers at the ESP-Control Building Project of PLTU Units 9 &amp;amp; 10 through field observations and questionnaires. Productivity was assessed via the Work Sampling method, while SPSS software was employed to analyze key factors influencing worker performance. The results show that the piece-rate system is more effective in enhancing productivity than the daily wage system, as indicated by higher Labour Utilization Rates (LUR). A neural network model developed for productivity estimation achieved high accuracy, with R² values of 0.815 for the daily wage system and 0.817 for the piece-rate system. Practically, these findings can help project managers improve scheduling efficiency, minimize idle time, and reduce labor costs by adopting an appropriate wage system.</dc:description>
	<dc:publisher xml:lang="en">Universitas Negeri Semarang</dc:publisher>
	<dc:date>2025-10-31</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unnes.ac.id/journals/jtsp/article/view/15020</dc:identifier>
	<dc:identifier>10.15294/jtsp.v27i2.15020</dc:identifier>
	<dc:source xml:lang="en">Jurnal Teknik Sipil dan Perencanaan; Vol. 27 No. 2 (2025): Jurnal Teknik Sipil dan Perencanaan; 82 - 90</dc:source>
	<dc:source>2503-1899</dc:source>
	<dc:source>1411-1772</dc:source>
	<dc:source>10.15294/jtsp.v27i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.unnes.ac.id/journals/jtsp/article/view/15020/6738</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2025 Jurnal Teknik Sipil dan Perencanaan</dc:rights>
</oai_dc:dc>