Melola Discovery

← Melola Discovery

Jurnal Tanpa peringkat SINTA

Optimization of Vehicle Queue Length Using PTV Vissim at Talang Buluh Intersection, Banyuasin Regency

Jurnal Teknik Sipil dan Perencanaan · Vol. 27 No. 1 (2025) · hlm. 84–99

DOI
10.15294/jtsp.v27i1/19750
ISSN
2503-1899, 1411-1772
Terbit
2025-05-01
Penerbit
Universitas Negeri Semarang
Bahasa
eng

Abstrak

Traffic congestion is a common issue in developing metropolitan areas, impacting both economically and socially. Long vehicle queues result in delays for many vehicles, which increases travel time and contributes to deteriorating air quality due to emissions from motor vehicles at intersections. One of the influencing factors is the non-optimization of intersections due to delays. Previous studies commonly use the Highway Capacity Manual Indonesia, 2023, to analyze intersection optimization. However, this study will utilize PTV Vissim software. In planning the intersection, some factors must be considered, such as capacity, density, speed, and type. An average daily traffic survey and a road geometric survey will be conducted in the field survey. The analysis will be performed using PTV Vissim software to optimize the 3 (Three) Talang Buluh intersection in Banyuasin Regency by examining the impact of vehicle queue length and evaluating policies for improving traffic management. According to the analysis results, the data from the First Scenario shows that the maximum vehicle queue length reaches 124.02 meters, with an average delay of 18.75 seconds from the Palembang direction. In the second scenario, installing traffic signal control devices increased the queue length to 287.95 meters from the Betung direction, with the most extended delay reaching 129.52 seconds. The third scenario, which involved geometric changes at the intersection, successfully reduced the vehicle queue length to just 47.70 meters from the Palembang City direction. Additionally, the most extended delay recorded was only 11.59 seconds, demonstrating the effectiveness of this approach, though it is costly and unsuitable for short-term use. Overall, Scenario 1 can serve as a short-term solution for intersection optimization. However, if road widening improvements are feasible, Scenario 3 is the optimal solution for enhancing traffic efficiency and effectiveness, significantly reducing vehicle queues and delays. This is crucial for implementing long-term traffic management strategies at the Talang Buluh Intersection in Banyuasin Regency.

Kata kunci

Jaringan kolaborasi para penulis

3 penulis · 3 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Sriwijaya University
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/jtsp/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Optimization of Vehicle Queue Length Using PTV Vissim at Talang Buluh Intersection, Banyuasin Regency</dc:title>
	<dc:creator xml:lang="en">Muhammad Azhar Baskoro</dc:creator>
	<dc:creator xml:lang="en">Melawaty Agustien</dc:creator>
	<dc:creator xml:lang="en">Rhaptyalyani </dc:creator>
	<dc:subject xml:lang="en">Transportation</dc:subject>
	<dc:subject xml:lang="en">Intersection</dc:subject>
	<dc:subject xml:lang="en">Vehicle</dc:subject>
	<dc:subject xml:lang="en">Microsimulation</dc:subject>
	<dc:subject xml:lang="en">Congestion</dc:subject>
	<dc:description xml:lang="en">Traffic congestion is a common issue in developing metropolitan areas, impacting both economically and socially. Long vehicle queues result in delays for many vehicles, which increases travel time and contributes to deteriorating air quality due to emissions from motor vehicles at intersections. One of the influencing factors is the non-optimization of intersections due to delays. Previous studies commonly use the Highway Capacity Manual Indonesia, 2023, to analyze intersection optimization. However, this study will utilize PTV Vissim software. In planning the intersection, some factors must be considered, such as capacity, density, speed, and type. An average daily traffic survey and a road geometric survey will be conducted in the field survey. The analysis will be performed using PTV Vissim software to optimize the 3 (Three) Talang Buluh intersection in Banyuasin Regency by examining the impact of vehicle queue length and evaluating policies for improving traffic management. According to the analysis results, the data from the First Scenario shows that the maximum vehicle queue length reaches 124.02 meters, with an average delay of 18.75 seconds from the Palembang direction. In the second scenario, installing traffic signal control devices increased the queue length to 287.95 meters from the Betung direction, with the most extended delay reaching 129.52 seconds. The third scenario, which involved geometric changes at the intersection, successfully reduced the vehicle queue length to just 47.70 meters from the Palembang City direction. Additionally, the most extended delay recorded was only 11.59 seconds, demonstrating the effectiveness of this approach, though it is costly and unsuitable for short-term use. Overall, Scenario 1 can serve as a short-term solution for intersection optimization. However, if road widening improvements are feasible, Scenario 3 is the optimal solution for enhancing traffic efficiency and effectiveness, significantly reducing vehicle queues and delays. This is crucial for implementing long-term traffic management strategies at the Talang Buluh Intersection in Banyuasin Regency.</dc:description>
	<dc:publisher xml:lang="en">Universitas Negeri Semarang</dc:publisher>
	<dc:date>2025-05-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unnes.ac.id/journals/jtsp/article/view/19750</dc:identifier>
	<dc:identifier>10.15294/jtsp.v27i1/19750</dc:identifier>
	<dc:source xml:lang="en">Jurnal Teknik Sipil dan Perencanaan; Vol. 27 No. 1 (2025): Jurnal Teknik Sipil dan Perencanaan; 84 - 99</dc:source>
	<dc:source>2503-1899</dc:source>
	<dc:source>1411-1772</dc:source>
	<dc:source>10.15294/jtsp.v27i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.unnes.ac.id/journals/jtsp/article/view/19750/3858</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2025 Jurnal Teknik Sipil dan Perencanaan</dc:rights>
</oai_dc:dc>