Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

An approach for a multi-stage under-frequency based load shedding scheme for a power system network

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 10 No. 6 (2020)

DOI
10.11591/ijece.v10i6.pp6071-6100
ISSN
2722-2578, 2088-8708
Published
2020-12-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

The integration of load shedding schemes with mainstream protection in power system networks is vital. The traditional power system network incorporates different protection schemes to protect its components. Once the power network reaches its maximum limits, and the load demand continue to increase the whole system will experience power system instability. The system frequency usually drops due to the loss of substantial generation creating imbalance. The best method to recover the system from instability is by introducing an under-frequency load shedding (UFLS) scheme in parallel with the protection schemes. This paper proposed a new UFLS scheme used in power systems and industry to maintain stability. Three case studies were implemented in this paper. Multi-stage decision-making algorithms load shedding in the environment of the DIgSILENT power factory platform is developed. The proposed algorithm speeds-up the operation of the UFLS scheme. The load shedding algorithm of the proposed scheme is implemented as a systematic process to achieve stability of the power network which is exposed to different operating conditions. The flexibility of the proposed scheme is validated with the modified IEEE 39-bus New England model. The application of the proposed novel UFLS schemes will contribute further to the development of new types of engineers.

Collaboration network of the authors

4 authors · 4 co-authorship links

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Cape Peninsula University of Technology
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Nomzamo Tshemese-MvandabaCape Peninsula University of Technology2
Raynitchka TzonevaCape Peninsula University of Technology1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 1 Nov 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>An approach for a multi-stage under-frequency based load shedding scheme for a power system network</dc:title><dc:creator>Siyanda Mnguni, Mkhululi Elvis</dc:creator><dc:creator>Mfoumboulou, Yohan Darcy</dc:creator><dc:description>&lt;jats:p&gt;The integration of load shedding schemes with mainstream protection in power system networks is vital. The traditional power system network incorporates different protection schemes to protect its components. Once the power network reaches its maximum limits, and the load demand continue to increase the whole system will experience power system instability. The system frequency usually drops due to the loss of substantial generation creating imbalance. The best method to recover the system from instability is by introducing an under-frequency load shedding (UFLS) scheme in parallel with the protection schemes. This paper proposed a new UFLS scheme used in power systems and industry to maintain stability. Three case studies were implemented in this paper. Multi-stage decision-making algorithms load shedding in the environment of the DIgSILENT power factory platform is developed. The proposed algorithm speeds-up the operation of the UFLS scheme. The load shedding algorithm of the proposed scheme is implemented as a systematic process to achieve stability of the power network which is exposed to different operating conditions. The flexibility of the proposed scheme is validated with the modified IEEE 39-bus New England model. The application of the proposed novel UFLS schemes will contribute further to the development of new types of engineers.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2020-12-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v10i6.pp6071-6100</dc:identifier><dc:identifier>10.11591/ijece.v10i6.pp6071-6100</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 10 No 6 (2020); 6071</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/23018/14396</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>