The Design of Project Risk Management to Mitigate Project Delay in the Onshore Construction Industry (A Case Study of a Shore Protection Project)

Management Analysis Journal · Vol. 14 No. 4 (2025) · hlm. 509–523

DOI
10.15294/maj.v14i4.26631
ISSN
2502-1451, 2252-6552
Terbit
2025-12-30
Penerbit
Universitas Negeri Semarang
Bahasa
eng
Lisensi
creativecommons.org/licenses/by/4.0

Abstrak

This study research focuses on a three-month delay in a shore protection project undertaken by PT Sabar Sejahtera, which resulted in financial, time, and opportunity losses. Electricity is essential for human life and can be generated in various ways; therefore, the construction of power plants must be well planned. Effective project planning helps manage resources and schedules, while poor planning can lead to project delays. This study aims to identify the root causes of the delay, propose solutions and mitigation plans, and develop a lessons learned register. A mixed-method approach was employed, including focus group discussions and Risk Priority Number (RPN) analysis. The Current Reality Tree identified two main root causes: systematic errors during the tendering and planning stages and the absence of a mitigation plan. The Future Reality Tree demonstrated that involving multiple departments and correcting systematic errors could prevent similar issues in future projects. To manage project risks, this study applied the PMBOK 6th Edition project risk management framework, covering risk identification through monitoring. The lessons learned register highlights the importance of early planning, appropriate working methods, and a comprehensive risk mitigation plan. The company is encouraged to adopt this approach in future projects.

Kata kunci

Jaringan kolaborasi para penulis

8 penulis · 12 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Bandung Institute of Technology
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Niken PrilanditaBandung Institute of Technology2
Tamara Latifah JasmineBandung Institute of Technology2
Heru Purboyo Hidayat PutroBandung Institute of Technology2
Miming MiharjaBandung Institute of Technology1
Nurlaela Kumala DewiBandung Institute of Technology1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/maj/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">The Design of Project Risk Management to Mitigate Project Delay in the Onshore Construction Industry (A Case Study of a Shore Protection Project)</dc:title>
	<dc:creator xml:lang="en">Muhammad, Firdaus Yusri</dc:creator>
	<dc:creator xml:lang="en">Yudoko, Gatot</dc:creator>
	<dc:creator xml:lang="en">Hanafi, Muhammad</dc:creator>
	<dc:subject xml:lang="en">Project Delay</dc:subject>
	<dc:subject xml:lang="en">Current Reality Tree</dc:subject>
	<dc:subject xml:lang="en">Future Reality Tree</dc:subject>
	<dc:subject xml:lang="en">Project Risk Management</dc:subject>
	<dc:description xml:lang="en">This study research focuses on a three-month delay in a shore protection project undertaken by PT Sabar Sejahtera, which resulted in financial, time, and opportunity losses. Electricity is essential for human life and can be generated in various ways; therefore, the construction of power plants must be well planned. Effective project planning helps manage resources and schedules, while poor planning can lead to project delays. This study aims to identify the root causes of the delay, propose solutions and mitigation plans, and develop a lessons learned register. A mixed-method approach was employed, including focus group discussions and Risk Priority Number (RPN) analysis. The Current Reality Tree identified two main root causes: systematic errors during the tendering and planning stages and the absence of a mitigation plan. The Future Reality Tree demonstrated that involving multiple departments and correcting systematic errors could prevent similar issues in future projects. To manage project risks, this study applied the PMBOK 6th Edition project risk management framework, covering risk identification through monitoring. The lessons learned register highlights the importance of early planning, appropriate working methods, and a comprehensive risk mitigation plan. The company is encouraged to adopt this approach in future projects.</dc:description>
	<dc:publisher xml:lang="en">Universitas Negeri Semarang</dc:publisher>
	<dc:date>2025-12-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unnes.ac.id/journals/maj/article/view/26631</dc:identifier>
	<dc:identifier>10.15294/maj.v14i4.26631</dc:identifier>
	<dc:source xml:lang="en">Management Analysis Journal; Vol. 14 No. 4 (2025): Special Edition; 509-523</dc:source>
	<dc:source>2502-1451</dc:source>
	<dc:source>2252-6552</dc:source>
	<dc:source>10.15294/maj.v13i4</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.unnes.ac.id/journals/maj/article/view/26631/10565</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2025 Management Analysis Journal</dc:rights>
	<dc:rights xml:lang="en">https://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>