Analysis of Construction Risk Using Markov Decision Process and Reinforcement Learning

Management Analysis Journal · Vol. 14 No. 2 (2025) · hlm. 170–176

DOI
10.15294/maj.v14i2.27324
ISSN
2502-1451, 2252-6552
Terbit
2025-06-30
Penerbit
Universitas Negeri Semarang
Bahasa
eng

Abstrak

Recognizing the critical need for advanced risk management in the rapidly expanding construction sector, this study aims to analyze and optimize construction risk mitigation strategies at a prominent Indonesian housing developer, enhancing project time efficiency and reducing decision-making uncertainty. The research methodology employs a quantitative descriptive approach, utilizing Markov Decision Process to model project risk dynamics and Reinforcement Learning, specifically the Q-Learning algorithm, to determine optimal mitigation policies. Data collection involved direct observation, in-depth interviews with project management, and analysis of historical project documentation from a housing project. Research findings demonstrate that the Q-Learning model effectively identifies and recommends adaptive mitigation strategies for various risk levels, providing optimal actions that significantly reduce project delays. The implementation of these data-driven strategies resulted in a notable improvement in project time efficiency, reducing the average project duration. Reproducibility, convergence, and sensitivity tests further validate the model's reliability and robustness, confirming its capacity to provide consistent and stable recommendations under diverse conditions.

Kata kunci

Jaringan kolaborasi para penulis

2 penulis · 1 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • University of Pembangunan Nasional Veteran Jawa Timur
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/maj/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Analysis of Construction Risk Using Markov Decision Process and Reinforcement Learning</dc:title>
	<dc:creator xml:lang="en">Prasetyo, Restu Wijang</dc:creator>
	<dc:creator xml:lang="en">Handayani, Wiwik </dc:creator>
	<dc:subject xml:lang="en">Construction Risk</dc:subject>
	<dc:subject xml:lang="en">Markov Decision Process</dc:subject>
	<dc:subject xml:lang="en">Project Efficiency</dc:subject>
	<dc:subject xml:lang="en">Q-Learning </dc:subject>
	<dc:description xml:lang="en">Recognizing the critical need for advanced risk management in the rapidly expanding construction sector, this study aims to analyze and optimize construction risk mitigation strategies at a prominent Indonesian housing developer, enhancing project time efficiency and reducing decision-making uncertainty. The research methodology employs a quantitative descriptive approach, utilizing Markov Decision Process to model project risk dynamics and Reinforcement Learning, specifically the Q-Learning algorithm, to determine optimal mitigation policies. Data collection involved direct observation, in-depth interviews with project management, and analysis of historical project documentation from a housing project. Research findings demonstrate that the Q-Learning model effectively identifies and recommends adaptive mitigation strategies for various risk levels, providing optimal actions that significantly reduce project delays. The implementation of these data-driven strategies resulted in a notable improvement in project time efficiency, reducing the average project duration. Reproducibility, convergence, and sensitivity tests further validate the model's reliability and robustness, confirming its capacity to provide consistent and stable recommendations under diverse conditions.</dc:description>
	<dc:publisher xml:lang="en">Universitas Negeri Semarang</dc:publisher>
	<dc:date>2025-06-30</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unnes.ac.id/journals/maj/article/view/27324</dc:identifier>
	<dc:identifier>10.15294/maj.v14i2.27324</dc:identifier>
	<dc:source xml:lang="en">Management Analysis Journal; Vol. 14 No. 2 (2025): Management Analysis Journal; 170-176</dc:source>
	<dc:source>2502-1451</dc:source>
	<dc:source>2252-6552</dc:source>
	<dc:source>10.15294/maj.v14i2</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.unnes.ac.id/journals/maj/article/view/27324/4732</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2025 Management Analysis Journal</dc:rights>
</oai_dc:dc>