Along with increasing economic growth, population, and growing industry, the demand for energy continues to increase. One of the alternative energy sources that increasingly exist with higher prices is coal. The area of Muara Enim Regency has the prospect of coal mining commodities which are widespread. In this case, PT. Bukit Asam, Tbk will increase coal production by conducting a comprehensive investment planning analysis. Cost Present Value (CPV) and Benefit Cost Ratio (BCR) are the methods that will be used in this research. This study will also compare between investment and equipment rental to see the costs incurred. The data used is divided into two, namely primary data consisting of cashflow data, annual operational cost plans, prices of main and supporting equipment, bank interest rates, and effective working hours. While the secondary data consists of the condition and situation of the mining location. Based on the calculation results show that investment planning has a lower cost calculation than equipment rental. Benefit Cost Ratio (BCR) generated in this study is 1.935743906.
Jaringan kolaborasi para penulis
15 penulis ·
24 tautan kepenulisan bersama
· 4 lintas organisasi
Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.
Sultan Ageng Tirtayasa University
Sunan Gunung Djati State Islamic University Bandung
Bakrie University
Politeknik STIA LAN Jakarta
Afiliasi tidak diketahui
Organisasi berbeda
Organisasi sama
Afiliasi tidak diketahui
Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.