Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

Determination of the price for a hydro resource with consideration of operating conditions of hydropower plants using complex criteria of profit maxmization

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 11 No. 4 (2021)

DOI
10.11591/ijece.v11i4.pp2733-2742
ISSN
2722-2578, 2088-8708
Published
2021-08-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

In this paper, a universal method has been developed to determine the price of a hydro resource (one cubic meter) for the operational regulation of a hydropower plant (HPP), which is a combination of an optimization method and a method for assessing the marginal utility. The proposed approach is based on the correct representation of differential incremental rate characteristics of water at an HPP and fuel at a thermal power plant (TPP). To know the price of a hydro resource used for electricity generation at a hydropower plant. This gives the possibility to increase the efficiency of management both at a hydropower plant, and in a water utilization system as a whole. Using the examples of Novosibirsk HPP, it is expected to develop an estimation of economic effect from the implementation of the developed criteria, the proposed method of the calculation of a hydro resource price at HPP, and the method of separating fuel costs at CHPP. As a result of the implementation the developed method for the HPP, a price of electricity sold in the flexible energy market will be compared to the price of the electricity produced and sold at CHPP, being equal to approximately 330 rubles/MW h.

Collaboration network of the authors

2 authors · 1 co-authorship link

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Novosibirsk State Technical University
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 1 Nov 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Determination of the price for a hydro resource with consideration of operating conditions of hydropower plants using complex criteria of profit maxmization</dc:title><dc:creator>Myatezh, T. V.</dc:creator><dc:creator>Sekretarev, Y. A.</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;span&amp;gt;In this paper, a universal method has been developed to determine the price of a hydro resource (one cubic meter) for the operational regulation of a hydropower plant (HPP), which is a combination of an optimization method and a method for assessing the marginal utility. The proposed approach is based on the correct representation of differential incremental rate characteristics of water at an HPP and fuel at a thermal power plant (TPP). To know the price of a hydro resource used for electricity generation at a hydropower plant. This gives the possibility to increase the efficiency of management both at a hydropower plant, and in a water utilization system as a whole. Using the examples of Novosibirsk HPP, it is expected to develop an estimation of economic effect from the implementation of the developed criteria, the proposed method of the calculation of a hydro resource price at HPP, and the method of separating fuel costs at CHPP. As a result of the implementation the developed method for the HPP, a price of electricity sold in the flexible energy market will be compared to the price of the electricity produced and sold at CHPP, being equal to approximately 330 rubles/MW h.&amp;lt;/span&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2021-08-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v11i4.pp2733-2742</dc:identifier><dc:identifier>10.11591/ijece.v11i4.pp2733-2742</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 11 No 4 (2021); 2733</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/21433/14873</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>