Analisis Perbandingan Biaya dan Waktu Bekisting Kalsiboard dan Bata Ringan pada Pile Cap dengan Pendekatan BIM Revit (Studi Kasus: Proyek Kawasan IT Center BRI Ragunan Paket 1, Jakarta Selatan)

Scaffolding · Vol. 15 No. 1 (2026) · hlm. 10–19

DOI
10.15294/scaffolding.v15i1.42683
ISSN
3164-7227, 3164-7227
Terbit
2026-08-26
Penerbit
Universitas Negeri Semarang
Bahasa
eng

Abstrak

This study aims to analyze the comparison of cost efficiency and work duration of Pile Cap formwork using calcium silicate board (Kalsiboard) and lightweight BRIck materials at the IT Area BRI Ragunan Project. The research method applies Building Information Modeling (BIM) using Autodesk Revit to generate accurate formwork material Material Takeoff based on construction drawings. The quantity data obtained from Revit are then used as the basis for calculating material costs and work durations by referring to labor coefficients from the Indonesian Standard Unit Price Analysis (AHSP). The results show that the use of calcium silicate board formwork is more efficient than lightweight BRIck formwork in terms of both material cost and construction time. The total duration of Pile Cap formwork work using calcium silicate board is 28.5 days, while the use of lightweight BRIck requires 47.5 days. This difference is influenced by material characteristics and installation methods, as calcium silicate boards are lighter and easier to install, resulting in higher labor productivity. Based on the analysis, it can be concluded that calcium silicate board formwork is a more efficient and feasible alternative for Pile Cap construction. However, proper material handling and management are required to minimize the risk of damage during transportation and installation. The results of this study are expected to serve as a reference for selecting formwork materials in similar construction projects.

Kata kunci

Jaringan kolaborasi para penulis

19 penulis · 55 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • State University of Semarang
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Virgiawan Adi KristiantoState University of Semarang5
Nur QudusState University of Semarang4
TuginoState University of Semarang2
Harianingsih HarianingsihState University of Semarang1
Mohammad Pujo SiswoyoState University of Semarang1
Indra Sakti PangestuState University of Semarang1
Isnina Noor UbayState University of Semarang1
Savira Rinda ErlianaState University of Semarang1
Dito Rizky Nur SaputraState University of Semarang1
Sri HandayaniState University of Semarang1
Melisa Setiya NingsihState University of Semarang1
Nelil MunaState University of Semarang1
Nurul YuhanafiaState University of Semarang1
Antonius Erlangga HardiyantoState University of Semarang1
April AmeliyaState University of Semarang1
Rahmawati Iriani MutakinState University of Semarang1
Fajar FathurizkiState University of Semarang1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/scaffolding/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Analisis Perbandingan Biaya dan Waktu Bekisting Kalsiboard dan Bata Ringan pada Pile Cap dengan Pendekatan BIM Revit (Studi Kasus : Proyek Kawasan IT Center BRI Ragunan Paket 1, Jakarta Selatan)</dc:title>
	<dc:creator xml:lang="en">Selasih, Diyan</dc:creator>
	<dc:creator xml:lang="en">Sugiyarto, Bambang</dc:creator>
	<dc:subject xml:lang="en">Bekisting Pile Cap</dc:subject>
	<dc:subject xml:lang="en">Kalsiboard</dc:subject>
	<dc:subject xml:lang="en">bata ringan </dc:subject>
	<dc:subject xml:lang="en"> Autodesk Revit </dc:subject>
	<dc:subject xml:lang="en">Building Information Modeling (BIM)</dc:subject>
	<dc:subject xml:lang="en">durasi waktu pekerjaan</dc:subject>
	<dc:subject xml:lang="en">efisiensi biaya</dc:subject>
	<dc:description xml:lang="en">This study aims to analyze the comparison of cost efficiency and work duration of Pile Cap formwork using calcium silicate board (Kalsiboard) and lightweight BRIck materials at the IT Area BRI Ragunan Project. The research method applies Building Information Modeling (BIM) using Autodesk Revit to generate accurate formwork material Material Takeoff based on construction drawings. The quantity data obtained from Revit are then used as the basis for calculating material costs and work durations by referring to labor coefficients from the Indonesian Standard Unit Price Analysis (AHSP).
The results show that the use of calcium silicate board formwork is more efficient than lightweight BRIck formwork in terms of both material cost and construction time. The total duration of Pile Cap formwork work using calcium silicate board is 28.5 days, while the use of lightweight BRIck requires 47.5 days. This difference is influenced by material characteristics and installation methods, as calcium silicate boards are lighter and easier to install, resulting in higher labor productivity.
Based on the analysis, it can be concluded that calcium silicate board formwork is a more efficient and feasible alternative for Pile Cap construction. However, proper material handling and management are required to minimize the risk of damage during transportation and installation. The results of this study are expected to serve as a reference for selecting formwork materials in similar construction projects.</dc:description>
	<dc:publisher xml:lang="en">Universitas Negeri Semarang</dc:publisher>
	<dc:date>2026-08-26</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://journal.unnes.ac.id/journals/scaffolding/article/view/42683</dc:identifier>
	<dc:identifier>10.15294/scaffolding.v15i1.42683</dc:identifier>
	<dc:source xml:lang="en">Scaffolding; Vol. 15 No. 1 (2026): Scaffolding; 10-19</dc:source>
	<dc:source>3164-7227</dc:source>
	<dc:source>3164-7227</dc:source>
	<dc:source>10.15294/scaffolding.v15i1</dc:source>
	<dc:language>eng</dc:language>
	<dc:relation>https://journal.unnes.ac.id/journals/scaffolding/article/view/42683/11226</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2026 Scaffolding</dc:rights>
</oai_dc:dc>