Jurnal
Tanpa peringkat SINTA
Termination of the Operational Period of Coal-Fired Power Plants amid Indonesia’s Sustainable Development Plan
Law Research Review Quarterly · Vol. 11 No. 2 (2025)
ISSN 2716-3415
Terbit 2025-05-26
Penerbit Universitas Negeri Semarang
Bahasa eng
Abstrak
Amid Indonesia’s sustainable development plan, Indonesian government Presidential Regulation of the Republic of Indonesia Number 112 of 2022 concerning the Acceleration of Renewable Energy Development for Electricity Supply aims to terminate the operational period of coal-fired power plants. However, the regulation also provides exemptions for the development of new coal-fired power plants under certain conditions. The author analyzes the influence of environmental issues on Presidential Regulation 112/2022 regarding the termination of coal-fired power plants' operational periods, as well as the influence of economic issues on the exemptions for new coal-fired power plants outlined in the regulation. In analyzing the issues, the author uses a socio-legal approach, supported by primary legal materials literature related to sociology of law and sustainable development, as well as news and other credible sources from the internet are also used for this research.
Jaringan kolaborasi para penulis
Belum ada rekan penulis di Melola.
Sumber metadata: OAI-PMH (metadata jurnal) https://journal.unnes.ac.id/journals/snh/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
<dc:title xml:lang="en">Termination of the Operational Period of Coal-Fired Power Plants amid Indonesia’s Sustainable Development Plan</dc:title>
<dc:creator xml:lang="en">Wibawa, Annisa Aninditya</dc:creator>
<dc:subject xml:lang="en">Coal-fired power plant</dc:subject>
<dc:subject xml:lang="en">Sustainable development</dc:subject>
<dc:description xml:lang="en">Amid Indonesia’s sustainable development plan, Indonesian government Presidential Regulation of the Republic of Indonesia Number 112 of 2022 concerning the Acceleration of Renewable Energy Development for Electricity Supply aims to terminate the operational period of coal-fired power plants. However, the regulation also provides exemptions for the development of new coal-fired power plants under certain conditions. The author analyzes the influence of environmental issues on Presidential Regulation 112/2022 regarding the termination of coal-fired power plants' operational periods, as well as the influence of economic issues on the exemptions for new coal-fired power plants outlined in the regulation. In analyzing the issues, the author uses a socio-legal approach, supported by primary legal materials literature related to sociology of law and sustainable development, as well as news and other credible sources from the internet are also used for this research.</dc:description>
<dc:publisher xml:lang="en">Universitas Negeri Semarang</dc:publisher>
<dc:date>2025-05-26</dc:date>
<dc:type>info:eu-repo/semantics/article</dc:type>
<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
<dc:format>application/pdf</dc:format>
<dc:identifier>https://journal.unnes.ac.id/journals/snh/article/view/23217</dc:identifier>
<dc:identifier>10.15294/llrq.v11i2.23217</dc:identifier>
<dc:source xml:lang="en">Law Research Review Quarterly; Vol. 11 No. 2 (2025): Contemporary Issues in Crime and Justice</dc:source>
<dc:source>2716-3415</dc:source>
<dc:source>10.15294/llrq.v11i2</dc:source>
<dc:language>eng</dc:language>
<dc:relation>https://journal.unnes.ac.id/journals/snh/article/view/23217/5220</dc:relation>
<dc:rights xml:lang="en">Copyright (c) 2025 Law Research Review Quarterly</dc:rights>
</oai_dc:dc>
Sitasi dan pengindeksan
Jumlah menurut tiap indeks pada 13 Nov 2026; setiap indeks menghitung sitasi dengan cara berbeda.
OpenAlex juga mencatat karya ini di: doaj.
Sitasi artikel ini
APA 7
Wibawa, A. A. (2025). Termination of the Operational Period of Coal-Fired Power Plants amid Indonesia’s Sustainable Development Plan. Law Research Review Quarterly, 11(2). https://doi.org/10.15294/llrq.v11i2.23217
Salin
IEEE
A. A. Wibawa, “Termination of the Operational Period of Coal-Fired Power Plants amid Indonesia’s Sustainable Development Plan,” Law Research Review Quarterly, vol. 11, no. 2, 2025, doi: 10.15294/llrq.v11i2.23217.
Salin
Dibuat dari metadata jurnal; periksa nama penulis sebelum dipakai.