Geological aspect analysis for micro hydro power plant site selection based on remote sensing data

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 12 No. 3 (2022)

DOI
10.11591/ijece.v12i3.pp2300-2312
ISSN
2722-2578, 2088-8708
Published
2022-06-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

Geological characters analysis is essential for micro hydropower plant (MHP) development planning. This paper presents an analysis of the geological aspect to determine the layout of MHP components based on remote sensing data as part of a solution to addressing power shortages in Sungai Are District, South Ogan Komering Ulu Regency, South Sumatra Province. Remote sensing and topographic map were extracted to identify the potential site. The topographic map and geological analysis were used to calculate the potential of electrical energy and the geological hazard risk, particularly floods and landslides. The results of the study identified four potential sites. Site 1 (Luas River, Ulu Danau Village) and site 3 (Putih River, Gintung Village) are suitable for MHP with a low cost of construction. Site 2 (Pecah Pinggan Village) and site 4 (Simpang Luas Village) are prone to flooding and landslides that makes it suitable for MHP but with a high cost of construction. Based on the geological aspect analysis, it is possible to optimize the hydropower capacity, by adding the volume of water flow from several nearby tributaries channeled into the hydropower flow system through civil construction engineering or by making a cascade design on the tailrace water flow.

Collaboration network of the authors

10 authors · 21 co-authorship links · 6 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Indonesian Institute of Sciences
  • Bandung Institute of Technology
  • National Research and Innovation Agency
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Puji WidiyantoIndonesian Institute of Sciences2
Priyono SutiknoBandung Institute of Technology1
Qidun MaulanaIndonesian Institute of Sciences1
Anwar MuqorobinIndonesian Institute of Sciences1
Muhammad Fathul HikmawanNational Research and Innovation Agency1

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Geological aspect analysis for micro hydro power plant site selection based on remote sensing data</dc:title><dc:creator>Kumoro, Yugo</dc:creator><dc:creator>Susilowati, Yuliana</dc:creator><dc:creator>Irasari, Pudji</dc:creator><dc:creator>Nur, Wawan Hendriawan</dc:creator><dc:creator>Yunarto, Yunarto</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;span&amp;gt;Geological characters analysis is essential for micro hydropower plant (MHP) development planning. This paper presents an analysis of the geological aspect to determine the layout of MHP components based on remote sensing data as part of a solution to addressing power shortages in Sungai Are District, South Ogan Komering Ulu Regency, South Sumatra Province. Remote sensing and topographic map were extracted to identify the potential site. The topographic map and geological analysis were used to calculate the potential of electrical energy and the geological hazard risk, particularly floods and landslides. The results of the study identified four potential sites. Site 1 (Luas River, Ulu Danau Village) and site 3 (Putih River, Gintung Village) are suitable for MHP with a low cost of construction. Site 2 (Pecah Pinggan Village) and site 4 (Simpang Luas Village) are prone to flooding and landslides that makes it suitable for MHP but with a high cost of construction. Based on the geological aspect analysis, it is possible to optimize the hydropower capacity, by adding the volume of water flow from several nearby tributaries channeled into the hydropower flow system through civil construction engineering or by making a cascade design on the tailrace water flow.&amp;lt;/span&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2022-06-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v12i3.pp2300-2312</dc:identifier><dc:identifier>10.11591/ijece.v12i3.pp2300-2312</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 12 No 3 (2022); 2300</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/26012/15608</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>