Melola Discovery

← Melola Discovery

Akses terbuka Jurnal SINTA 1

Simulation for predictive maintenance using weighted training algorithms in machine learning

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 12 No. 3 (2022)

DOI
10.11591/ijece.v12i3.pp2839-2846
ISSN
2722-2578, 2088-8708
Terbit
2022-06-01
Penerbit
Institute of Advanced Engineering and Science
Lisensi
creativecommons.org/licenses/by-sa/4.0

Abstrak

In the production, the efficient employment of machines is realized as a source of industry competition and strategic planning. In the manufacturing industries, data silos are harvested, which is needful to be monitored and deployed as an operational tool, which will associate with a right decision-making for minimizing maintenance cost. However, it is complex to prioritize and decide between several results. This article utilizes a synthetic data from a factory, mines the data to filter for an insight and performs machine learning (ML) tool in artificial intelligence (AI) to strategize a decision support and schedule a plan for maintenance. Data includes machinery, category, machinery, usage statistics, acquisition, owner’s unit, location, classification, and downtime. An open-source ML software tool is used to replace the short of maintenance planning and schedule. Upon data mining three promising training algorithms for the insightful data are employed as a result their accuracy figures are obtained. Then the accuracy as weighted factors to forecast the priority in maintenance schedule is proposed. The analysis helps monitor the anticipation of new machines in order to minimize mean time between failures (MTBF), promote the continuous manufacturing and achieve production’s safety.

Jaringan kolaborasi para penulis

2 penulis · 1 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Assumption University
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Data ini berasal dari Crossref (yang disetorkan penerbit), karena endpoint OAI-PMH milik jurnal tidak dapat di-harvest.

Sumber metadata: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, pertama di-harvest 27 Okt 2026, terakhir terlihat 15 Nov 2026.
Metadata sebagai oai_dc, dikonversi dari Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Simulation for predictive maintenance using weighted training algorithms in machine learning</dc:title><dc:creator>Jittawiriyanukoon, Chanintorn</dc:creator><dc:creator>Srisarkun, Vilasinee</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;span&amp;gt;In the production, the efficient employment of machines is realized as a source of industry competition and strategic planning. In the manufacturing industries, data silos are harvested, which is needful to be monitored and deployed as an operational tool, which will associate with a right decision-making for minimizing maintenance cost. However, it is complex to prioritize and decide between several results. This article utilizes a synthetic data from a factory, mines the data to filter for an insight and performs machine learning (ML) tool in artificial intelligence (AI) to strategize a decision support and schedule a plan for maintenance. Data includes machinery, category, machinery, usage statistics, acquisition, owner’s unit, location, classification, and downtime. An open-source ML software tool is used to replace the short of maintenance planning and schedule. Upon data mining three promising training algorithms for the insightful data are employed as a result their accuracy figures are obtained. Then the accuracy as weighted factors to forecast the priority in maintenance schedule is proposed. The analysis helps monitor the anticipation of new machines in order to minimize mean time between failures (MTBF), promote the continuous manufacturing and achieve production’s safety.&amp;lt;/span&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2022-06-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v12i3.pp2839-2846</dc:identifier><dc:identifier>10.11591/ijece.v12i3.pp2839-2846</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 12 No 3 (2022); 2839</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>http://ijece.iaescore.com/index.php/IJECE/article/viewFile/25716/15661</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>