Power loss and voltage magnitude fluctuations are two major issues in distribution networks that have drawn a lot of attention. Numerous strategies have been put forward to provide remedies to lessen the undesirable effects of these issues. Combining two of these approaches and dealing with them simultaneously to get more effective outcomes is essential. Therefore, this study hybridizes the network reconfiguration and capacitor allocation strategies using a novel dingo optimization algorithm (DOA) to solve the optimization problems. The optimization problems for simultaneous network reconfiguration and capacitor allocations were formulated and solved using a novel DOA. To demonstrate its effectiveness, DOA’s results were contrasted with those of the other optimization techniques. The methodology was validated on the IEEE 33-bus network and implemented in the MATLAB program. The results demonstrated that the best network reconfiguration was accomplished with switches 7, 11, 17, 27, and 34 open, and buses 8, 29, and 30 were the best places for capacitors with ideal sizes of 512, 714, and 495 kVAr, respectively. The voltage profile was significantly improved, and the power losses were significantly decreased. When compared to some of the different methods, DOA came out on top.
Collaboration network of the authors
6 authors ·
15 co-authorship links
· 9 across different organisations
Hover or tap a name to highlight its co-authors. Double-click to open the author's page.
Obafemi Awolowo University
Lead City University
Cape Peninsula University of Technology
Ladoke Akintola University of Technology
Affiliation unknown
Different organisations
Same organisation
Affiliation unknown
Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-author
Organisation
Joint articles
Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.