Stability model integration for large scale solar photovoltaic system using Western electricity coordinating council model

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 13 No. 4 (2023)

DOI
10.11591/ijece.v13i4.pp3641-3650
ISSN
2722-2578, 2088-8708
Terbit
2023-08-01
Penerbit
Institute of Advanced Engineering and Science
Lisensi
creativecommons.org/licenses/by-sa/4.0

Abstrak

Due to the increased demand for renewable energy, the interest in the large-scale solar photovoltaic (LSSPV) power plant has recently grown dramatically. However, when a large amount of electricity is produced from the LSSPV power plant to the grid interconnection, the system commonly experiences instability and thus disrupt the grid system in disturbance issues such as bus fault, line-to-line fault, three-phase fault, and tripping. This sudden disturbance occurrence is tended to interrupt the stability of the system from providing balanced electrical production within the electrical grid. A dynamics response from the simulation is used to study the stability and the behavior of the photovoltaic (PV) plant into the grid interconnection by developing 118 bus system. The observation of critical clearing time (CCT) duration shows that the result from the simulation where the duration takes less than t=15 s for the system to get back to its pre-fault condition in three-phase fault and tripping in a dynamic simulation to shows that the system reaches its stability been observed through the simulation result by using from user-specific models to generic models like those advocated by the Western electricity coordinating council (WECC) in power system simulator for engineering (PSSE) software.

Jaringan kolaborasi para penulis

11 penulis · 25 tautan kepenulisan bersama · 9 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universiti Teknologi MARA
  • Universitas Sumatera Utara
  • State University of Malang
  • Universitas Negeri Padang
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Nofri Yenita DahlanUniversiti Teknologi MARA2
Zuhaina ZakariaUniversiti Teknologi MARA2
Ahmad Ihsan Mohd YassinUniversiti Teknologi MARA2
Yulianta SiregarUniversitas Sumatera Utara1
Faizzufar TaqyUniversitas Sumatera Utara1
Hafizh PrihtiadiState University of Malang1
Muldi YuhendriUniversitas Negeri Padang1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Data ini berasal dari Crossref (yang disetorkan penerbit), karena endpoint OAI-PMH milik jurnal tidak dapat di-harvest.

Sumber metadata: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, pertama di-harvest 27 Okt 2026, terakhir terlihat 8 Nov 2026.
Metadata sebagai oai_dc, dikonversi dari Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Stability model integration for large scale solar photovoltaic system using Western electricity coordinating council model</dc:title><dc:creator>Mohd Tajudin, Mohammad Nayeim Fazumy</dc:creator><dc:creator>Mohd Hussain, Mohd Najib</dc:creator><dc:creator>Hussain, Mashitah Mohd</dc:creator><dc:creator>Ibrahim, Intan Rahayu</dc:creator><dc:description>&lt;jats:p&gt;&amp;lt;span lang="EN-US"&amp;gt;Due to the increased demand for renewable energy, the interest in the large-scale solar photovoltaic (LSSPV) power plant has recently grown dramatically. However, when a large amount of electricity is produced from the LSSPV power plant to the grid interconnection, the system commonly experiences instability and thus disrupt the grid system in disturbance issues such as bus fault, line-to-line fault, three-phase fault, and tripping. This sudden disturbance occurrence is tended to interrupt the stability of the system from providing balanced electrical production within the electrical grid. A dynamics response from the simulation is used to study the stability and the behavior of the photovoltaic (PV) plant into the grid interconnection by developing 118 bus system. The observation of critical clearing time (CCT) duration shows that the result from the simulation where the duration takes less than t=15 s for the system to get back to its pre-fault condition in three-phase fault and tripping in a dynamic simulation to shows that the system reaches its stability been observed through the simulation result by using from user-specific models to generic models like those advocated by the Western electricity coordinating council (WECC) in power system simulator for engineering (PSSE) software.&amp;lt;/span&amp;gt;&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2023-08-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v13i4.pp3641-3650</dc:identifier><dc:identifier>10.11591/ijece.v13i4.pp3641-3650</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 13 No 4 (2023); 3641</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>https://ijece.iaescore.com/index.php/IJECE/article/viewFile/29260/16648</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>