Melola Discovery

← Melola Discovery

Akses terbuka Jurnal Tanpa peringkat SINTA

Analisis Kestabilan Lereng Area Disposal Inpit 2 PT.Seluma Prima Coal di Rangkling, Kecamatan Mandiangin, Kabupaten Sarolangun, Provinsi Jambi

JTK (Jurnal Teknik Kebumian) · Vol. 7 No. 01 (2023) · hlm. 20–25

DOI
10.22437/jtk.v7i01.23072
ISSN
2715-5587, 2477-8583
Terbit
2023-03-25
Penerbit
Jurusan Teknik Kebumian, Fakultas Sains dan Teknologi
Bahasa
en
Lisensi
creativecommons.org/licenses/by-nc-sa/4.0

Abstrak

PT. Seluma Prima Coal is a company engaged in coal mining located in Rangkilig Village, Mandiangin District, Sarolangun Regency, Jambi Province. The company uses the open pit mining method in its mining process. In open pit mining, the main thing to avoid work accidents is slope stability. Slope analysis is carried out at the inpit 2 disposal area.. Based on the results of the analysis that has been carried out using 2 incisions, the FK value in the A-A' incision is 1.125 in the dry state and 0.93 in the saturated state. The B-B' incision is 1.108 in the dry state and 1.031 in the saturated state. Based on the results of the analysis, it was found that the condition of the slopes was unstable. Therefore, it is necessary to carry out further analysis to make slope recommendations to make the slopes stable with the slope height on the A-A' section being 7 m wide, 8 meters high for each slope and 50o overal slope. And in the B-B' incision with a width of 6 meters and a height of 7 meters for each slope and an overall slope of 51o. From the analysis results on the recommended slopes, the FK values are 1.131 and 1.112.Keywords: slope stability, disposal, incision, safety factor

Jaringan kolaborasi para penulis

5 penulis · 6 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Wahyudi ZaharAfiliasi tidak diketahui1
Saipul Haq PirmaniAfiliasi tidak diketahui1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://online-journal.unja.ac.id/index.php/jtk/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 16 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">Analisis Kestabilan Lereng Area Disposal Inpit 2 PT.Seluma Prima Coal di Rangkling, Kecamatan Mandiangin, Kabupaten Sarolangun, Provinsi Jambi</dc:title>
	<dc:creator xml:lang="en">Faramodita, Riska </dc:creator>
	<dc:creator xml:lang="en">AR, ArsyadAR</dc:creator>
	<dc:creator xml:lang="en">Denny Prabawa, Aditya Denny Prabawa</dc:creator>
	<dc:description xml:lang="en">PT. Seluma Prima Coal is a company engaged in coal mining located in Rangkilig Village, Mandiangin District, Sarolangun Regency, Jambi Province. The company uses the open pit mining method in its mining process. In open pit mining, the main thing to avoid work accidents is slope stability. Slope analysis is carried out at the inpit 2 disposal area.. Based on the results of the analysis that has been carried out using 2 incisions, the FK value in the A-A' incision is 1.125 in the dry state and 0.93 in the saturated state. The B-B' incision is 1.108 in the dry state and 1.031 in the saturated state. Based on the results of the analysis, it was found that the condition of the slopes was unstable. Therefore, it is necessary to carry out further analysis to make slope recommendations to make the slopes stable with the slope height on the A-A' section being 7 m wide, 8 meters high for each slope and 50o overal slope. And in the B-B' incision with a width of 6 meters and a height of 7 meters for each slope and an overall slope of 51o. From the analysis results on the recommended slopes, the FK values are 1.131 and 1.112.Keywords : slope stability, disposal, incision, safety factor</dc:description>
	<dc:publisher xml:lang="en">Jurusan Teknik Kebumian, Fakultas Sains dan Teknologi</dc:publisher>
	<dc:date>2023-03-25</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://online-journal.unja.ac.id/jtk/article/view/23072</dc:identifier>
	<dc:identifier>10.22437/jtk.v7i01.23072</dc:identifier>
	<dc:source xml:lang="en">JTK (Jurnal Teknik Kebumian); Vol. 7 No. 01 (2021): Jurnal Teknik Kebumian (JTK); 20-25</dc:source>
	<dc:source>2715-5587</dc:source>
	<dc:source>2477-8583</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://online-journal.unja.ac.id/jtk/article/view/23072/14926</dc:relation>
	<dc:rights xml:lang="en">https://creativecommons.org/licenses/by-nc-sa/4.0</dc:rights>
</oai_dc:dc>