EFISIENSI KINERJA ALAT GALI MUAT EXCAVATOR CAT 320 PC200 DAN ALAT ANGKUT DUMP TRUCK MITSUBISHI FUSO 220PS PADA KEGIATAN PENGUPASAN LAPISAN OVERBURDEN DI PERTAMBANGAN BATU KAPUR EFISIENSI KINERJA ALAT GALI MUAT EXCAVATOR CAT 320 PC200 DAN ALAT ANGKUT DUMP TRUCK MITSUBISHI FUSO 220PS PADA KEGIATAN PENGUPASAN LAPISAN OVERBURDEN DI PERTAMBANGAN BATU KAPUR

JTK (Jurnal Teknik Kebumian) · Vol. 8 No. 01 (2024) · hlm. 55–62

DOI
10.22437/jtk.v8i01.31636
ISSN
2715-5587, 2477-8583
Terbit
2024-02-01
Penerbit
Jurusan Teknik Kebumian, Fakultas Sains dan Teknologi
Bahasa
en
Lisensi
creativecommons.org/licenses/by-nc-sa/4.0

Abstrak

 Abstract: A limestone mining company in South Sumatra has an overburden removal target of 42,400 bcm/month, while the realization of overburden removal is only 21.7% of the target or 9,231.56 bcm/month. The tools used to dismantle the overburden were 1 Cat 320 PC200 excavator and 3 Mitsubishi Fuso 220PS dump trucks. The main work in this activity is digging, loading, moving, unloading, then returning to the initial activity and continuing to repeat. One of the reasons why the production target was not achieved was that the repetitive activities did not run optimally. Based on the cycle time of digging and hauling equipment observed in the field, the productivity of loading and digging tools was 128.98 bcm/hour, while the productivity value of hauling equipment was 15.018 bcm/hour. From the research results, it was found that the match factor of the current pair of units was 0.34, this is very far from ideal. For this reason, it is necessary to add 5 units of Mitsubishi Fuso 220PS dump trucks so that the match factor becomes 0.9. In this way, overburden demolition activities can run more optimally and production can be increased. Keyword: overburden, limestone, productivity, match factor, cycle time

Jaringan kolaborasi para penulis

36 penulis · 120 tautan kepenulisan bersama

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • Universitas Jambi
  • State University of Semarang
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Aditya Denny PrabawaAfiliasi tidak diketahui5
Bagus AdhityaUniversitas Jambi4
Muhammad El HakimAfiliasi tidak diketahui3
Yudi Arista YulandaAfiliasi tidak diketahui3
Yosa MegasukmaAfiliasi tidak diketahui2
Faizar FaridAfiliasi tidak diketahui2
Anggi Deliana SiregarAfiliasi tidak diketahui2
Wahyudi ZaharAfiliasi tidak diketahui2
Sarwo Sucitra AminAfiliasi tidak diketahui2
Alkhodri RahmatullahAfiliasi tidak diketahui2
Yudi Arista YulandaAfiliasi tidak diketahui1
Muhammad Faisal SeprizalAfiliasi tidak diketahui1
Muhammad IkrarAfiliasi tidak diketahui1
Dimas Agung PermadiAfiliasi tidak diketahui1
Affif Farras ChanAfiliasi tidak diketahui1
Siti SadariahAfiliasi tidak diketahui1
Muhammad Ikrar LagowaAfiliasi tidak diketahui1
Maulina TanjungAfiliasi tidak diketahui1
BagusAfiliasi tidak diketahui1
Luthfi WahyudiAfiliasi tidak diketahui1
Widowati WidowatiState University of Semarang1
Hari Wiki UtamaAfiliasi tidak diketahui1
Heru Juanda PutraAfiliasi tidak diketahui1
Michael M.PandiaAfiliasi tidak diketahui1
Ari SetiawanAfiliasi tidak diketahui1
Abdul Robbi HarahapAfiliasi tidak diketahui1
Valentinus Singgih Yudanto YudantoAfiliasi tidak diketahui1
M. Ikrar LagowaAfiliasi tidak diketahui1
Rosi Rosida MartaAfiliasi tidak diketahui1
Natanael PasaribuAfiliasi tidak diketahui1
Imam BaihakiAfiliasi tidak diketahui1
Ridho YovandaAfiliasi tidak diketahui1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://online-journal.unja.ac.id/index.php/jtk/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">EFISIENSI KINERJA ALAT GALI MUAT EXCAVATOR CAT 320 PC200 DAN ALAT ANGKUT DUMP TRUCK MITSUBISHI FUSO 220PS PADA KEGIATAN PENGUPASAN LAPISAN OVERBURDEN DI PERTAMBANGAN BATU KAPUR EFISIENSI KINERJA ALAT GALI MUAT EXCAVATOR CAT 320 PC200 DAN ALAT ANGKUT DUMP TRUCK MITSUBISHI FUSO 220PS PADA KEGIATAN PENGUPASAN LAPISAN OVERBURDEN DI PERTAMBANGAN BATU KAPUR</dc:title>
	<dc:creator xml:lang="en">Muhammad El Hakim</dc:creator>
	<dc:creator xml:lang="en">Muhammad Husein.Zn</dc:creator>
	<dc:creator xml:lang="en">Jarot Wiratama</dc:creator>
	<dc:creator xml:lang="en">Ericson</dc:creator>
	<dc:description xml:lang="en"> 
Abstract : A limestone mining company in South Sumatra has an overburden removal target of 42,400 bcm/month, while the realization of overburden removal is only 21.7% of the target or 9,231.56 bcm/month. The tools used to dismantle the overburden were 1 Cat 320 PC200 excavator and 3 Mitsubishi Fuso 220PS dump trucks. The main work in this activity is digging, loading, moving, unloading, then returning to the initial activity and continuing to repeat. One of the reasons why the production target was not achieved was that the repetitive activities did not run optimally. Based on the cycle time of digging and hauling equipment observed in the field, the productivity of loading and digging tools was 128.98 bcm/hour, while the productivity value of hauling equipment was 15.018 bcm/hour. From the research results, it was found that the match factor of the current pair of units was 0.34, this is very far from ideal. For this reason, it is necessary to add 5 units of Mitsubishi Fuso 220PS dump trucks so that the match factor becomes 0.9. In this way, overburden demolition activities can run more optimally and production can be increased.
Keyword: overburden, limestone, productivity, match factor, cycle time</dc:description>
	<dc:publisher xml:lang="en">Jurusan Teknik Kebumian, Fakultas Sains dan Teknologi</dc:publisher>
	<dc:date>2024-02-01</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:type xml:lang="en">Peer-reviewed Article</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://online-journal.unja.ac.id/jtk/article/view/31636</dc:identifier>
	<dc:identifier>10.22437/jtk.v8i01.31636</dc:identifier>
	<dc:source xml:lang="en">JTK (Jurnal Teknik Kebumian); Vol. 8 No. 01 (2022): JURNAL TEKNIK KEBUMIAN (JTK); 55-62</dc:source>
	<dc:source>2715-5587</dc:source>
	<dc:source>2477-8583</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://online-journal.unja.ac.id/jtk/article/view/31636/17490</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2024 Muhammad El Hakim, Muhammad Husein.Zn, Jarot Wiratama, Ericson</dc:rights>
	<dc:rights xml:lang="en">https://creativecommons.org/licenses/by-nc-sa/4.0</dc:rights>
</oai_dc:dc>