Melola Discovery

← Melola Discovery

Akses terbuka Jurnal

DEMAND-DRIVEN MATERIAL REQUIREMENTS PLANNING (DDMRP) FOR COAL INVENTORY CONTROL TO MITIGATE SUPPLY CHAIN UNCERTAINTY

Jurnal Manajemen Terapan dan Keuangan · Vol. 15 No. 03 (2026) · hlm. 1810–1824

DOI
10.22437/ned6nh60
ISSN
2685-9424, 2252-8636
Terbit
2026-10-18
Penerbit
Program Studi Manajemen Pemerintahan dan Keuangan Daerah Fakultas Ekonomi dan Bisnis Universitas Jambi
Bahasa
en
Lisensi
creativecommons.org/licenses/by/4.0

Abstrak

Abstract Upstream logistical uncertainty in the primary energy supply chain represents a critical challenge for nationally vital facilities in ensuring the continuity of electricity generation. PT XYZ faces fluctuations in barge arrivals, resulting in substantial physical coal supply deficits and declining safety stock levels. This study aims to design a proposed adaptive coal inventory control system using the Demand Driven Material Requirements Planning (DDMRP) method to mitigate supply chain uncertainty, with a focus on physical quantities (tonnage). The study employed a quantitative descriptive method with a system design approach to develop a proposed DDMRP application based on operational data from 2025. The DDMRP implementation process comprises Strategic Positioning, Buffer Profiles and Levels, Dynamic Adjustments, Demand Driven Planning, and Visual Execution. The results show that positioning the coal yard as a strategic decoupling point can serve as a separation point between external supply uncertainty and internal consumption requirements. Based on an Average Daily Usage (ADU) of 11,169 tons and a Decoupled Lead Time (DLT) of 12 days, the proposed dynamic buffer level parameters consist of a Top of Red of 42,736 tons as the minimum critical level, a Top of Yellow of 176,768 tons as the replenishment threshold, and a Top of Green of 219,503 tons as the maximum inventory level. Overall, the proposed implementation of DDMRP provides a more adaptive inventory control mechanism for responding to changes in demand and supply uncertainty, supporting material flow stability, and helping to control the risks of stockouts and excessive coal accumulation. Keywords: Supply Chain Management, Inventory Control, DDMRP, Coal, Material Flow

Jaringan kolaborasi para penulis

33 penulis · 110 tautan kepenulisan bersama · 10 lintas organisasi

Arahkan kursor atau ketuk sebuah nama untuk menyorot rekan penulisnya. Klik dua kali untuk membuka halaman penulis.

  • State University of Semarang
  • Universitas Wiralodra
  • National University of Malaysia
  • Bowen University
  • Universitas Jember
  • Afiliasi tidak diketahui
  • Organisasi berbeda
  • Organisasi sama
  • Afiliasi tidak diketahui
  • Garis lebih tebal = lebih banyak artikel bersama · lingkaran lebih besar = lebih banyak artikel
Tampilkan sebagai tabel
Rekan penulisOrganisasiArtikel bersama
Indriana FirdausState University of Semarang3
Muhammad Iqbal BaiquniState University of Semarang2
Bintang Rafli AnantaState University of Semarang2
Baidhowi BaidhowiState University of Semarang2
Zainurohmah ZainurohmahState University of Semarang2
Rizqiya Lailatul IzzaState University of Semarang2
Ridwan ArifinState University of Semarang2
Endriyani LestariAfiliasi tidak diketahui1
Fitria DamayantiAfiliasi tidak diketahui1
Setyaning WidaAfiliasi tidak diketahui1
Bayangsari WedhatamiState University of Semarang1
Ridwan ArifinState University of Semarang1
Riska AlkadriState University of Semarang1
- DEWI PUSPA SARIState University of Semarang1
Wahyu Nandang HerawanAfiliasi tidak diketahui1
Uche NnawuleziBowen University1
Endriyani LestariState University of Semarang1
Waspiah WaspiahState University of Semarang1
Nadiyah Meyliana PutriState University of Semarang1
Rodiyah RodiyahState University of Semarang1
Umi AfiatunState University of Semarang1
Christina Noelia UmbríaAfiliasi tidak diketahui1
Izan Mateo CassandroAfiliasi tidak diketahui1
Tegar Islami PutraState University of Semarang1
WaspiahState University of Semarang1
Jayus JayusAfiliasi tidak diketahui1
Bambang KuswandiUniversitas Jember1
Aminah AbdullahNational University of Malaysia1
Lee Yook HengNational University of Malaysia1

Afiliasi berasal dari OpenAlex; metadata OAI-PMH jurnal tidak memuatnya. Penulis tanpa ID OpenAlex dicocokkan berdasarkan nama, sehingga dua orang bisa tergabung atau satu orang bisa terpisah.

Sumber metadata: OAI-PMH (metadata jurnal) https://online-journal.unja.ac.id/index.php/mankeu/oai, pertama di-harvest 6 Nov 2026, terakhir terlihat 8 Nov 2026.
Metadata asli (oai_dc)
<oai_dc:dc xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/  http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
	<dc:title xml:lang="en">DEMAND-DRIVEN MATERIAL REQUIREMENTS PLANNING (DDMRP) FOR COAL INVENTORY CONTROL TO MITIGATE SUPPLY CHAIN UNCERTAINTY</dc:title>
	<dc:creator xml:lang="en">Farchan, Fauzi</dc:creator>
	<dc:creator xml:lang="en">Azzatillah, Azzatillah</dc:creator>
	<dc:creator xml:lang="en">Damayanti, Fitria</dc:creator>
	<dc:creator xml:lang="en">Azizah, Nur</dc:creator>
	<dc:description xml:lang="en"> Abstract
Upstream logistical uncertainty in the primary energy supply chain represents a critical challenge for nationally vital facilities in ensuring the continuity of electricity generation. PT XYZ faces fluctuations in barge arrivals, resulting in substantial physical coal supply deficits and declining safety stock levels. This study aims to design a proposed adaptive coal inventory control system using the Demand Driven Material Requirements Planning (DDMRP) method to mitigate supply chain uncertainty, with a focus on physical quantities (tonnage). The study employed a quantitative descriptive method with a system design approach to develop a proposed DDMRP application based on operational data from 2025. The DDMRP implementation process comprises Strategic Positioning, Buffer Profiles and Levels, Dynamic Adjustments, Demand Driven Planning, and Visual Execution. The results show that positioning the coal yard as a strategic decoupling point can serve as a separation point between external supply uncertainty and internal consumption requirements. Based on an Average Daily Usage (ADU) of 11,169 tons and a Decoupled Lead Time (DLT) of 12 days, the proposed dynamic buffer level parameters consist of a Top of Red of 42,736 tons as the minimum critical level, a Top of Yellow of 176,768 tons as the replenishment threshold, and a Top of Green of 219,503 tons as the maximum inventory level. Overall, the proposed implementation of DDMRP provides a more adaptive inventory control mechanism for responding to changes in demand and supply uncertainty, supporting material flow stability, and helping to control the risks of stockouts and excessive coal accumulation.
Keywords: Supply Chain Management, Inventory Control, DDMRP, Coal, Material Flow</dc:description>
	<dc:publisher xml:lang="en">Program Studi Manajemen Pemerintahan dan Keuangan Daerah Fakultas Ekonomi dan Bisnis Universitas Jambi</dc:publisher>
	<dc:date>2026-10-18</dc:date>
	<dc:type>info:eu-repo/semantics/article</dc:type>
	<dc:type>info:eu-repo/semantics/publishedVersion</dc:type>
	<dc:format>application/pdf</dc:format>
	<dc:identifier>https://online-journal.unja.ac.id/mankeu/article/view/60616</dc:identifier>
	<dc:identifier>10.22437/ned6nh60</dc:identifier>
	<dc:source xml:lang="en">Jurnal Manajemen Terapan dan Keuangan; Vol. 15 No. 03 (2026): Jurnal Manajemen Terapan dan Keuangan ; 1810-1824</dc:source>
	<dc:source>2685-9424</dc:source>
	<dc:source>2252-8636</dc:source>
	<dc:language>en</dc:language>
	<dc:relation>https://online-journal.unja.ac.id/mankeu/article/view/60616/25845</dc:relation>
	<dc:rights xml:lang="en">Copyright (c) 2026 Fauzi Farchan, Azzatillah Azzatillah, Fitria Damayanti, Nur Azizah</dc:rights>
	<dc:rights xml:lang="en">https://creativecommons.org/licenses/by/4.0</dc:rights>
</oai_dc:dc>