Melola Discovery

← Melola Discovery

Open access Jurnal SINTA 1

Development of energy conversion and lightning strike protection simulation for photovoltaic-wind turbine on grid

International Journal of Electrical and Computer Engineering (IJECE) · Vol. 14 No. 1 (2024)

DOI
10.11591/ijece.v14i1.pp66-74
ISSN
2722-2578, 2088-8708
Published
2024-02-01
Publisher
Institute of Advanced Engineering and Science
License
creativecommons.org/licenses/by-sa/4.0

Abstract

Photovoltaic (PV) installations and wind turbines that are installed on the rooftops of buildings need to be protected because the layout is in a high position and there is a risk of being struck by lightning. Therefore, a more effective protection system is designed to anticipate electronic damage and fire on all materials in the distribution network, especially the addition of PV and wind turbine installations on building roofs. The purpose of this study is to simulate a lightning protection system on the distribution network and the results of on-grid PV energy conversion using electrical transient analyzer program (ETAP) software. Feeder relay delay times and cascade coordination patterns between outgoing and incoming relays do not overlap. the delay time of the relay working on the feeder is 0.31 s and the coordination pattern of the outgoing relay and incoming relay does not touch each other, so the delay time for the incoming relay is 2.73 s. Then testing the results of PV energy conversion connected to the grid using MATLAB Simulink monitoring obtained data reaching 1.600 Wp at peak power with sun conditions parallel to the PV installation layout.

Collaboration network of the authors

9 authors · 24 co-authorship links · 8 across different organisations

Hover or tap a name to highlight its co-authors. Double-click to open the author's page.

  • Medan Area University
  • Andalas University
  • Different organisations
  • Same organisation
  • Affiliation unknown
  • Thicker line = more joint articles · bigger circle = more articles
Show as table
Co-authorOrganisationJoint articles
Muhammad Fadlan SiregarMedan Area University4
Rahmad SyahMedan Area University2
Nukhe Andri SilvianaMedan Area University2

Affiliations come from OpenAlex; journal OAI-PMH metadata carries none. Authors without an OpenAlex ID are matched by name, which can merge or split people.

This record comes from Crossref (what the publisher deposited), because the journal's own OAI-PMH endpoint could not be harvested.

Metadata source: Crossref API (cadangan, berdasarkan ISSN) https://api.crossref.org/journals/2088-8708/works, first harvested 27 Okt 2026, last seen 27 Okt 2026.
Metadata as oai_dc, converted from Crossref
<oai_dc:dc xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/"><dc:title>Development of energy conversion and lightning strike protection simulation for photovoltaic-wind turbine on grid</dc:title><dc:creator>Satria, Habib</dc:creator><dc:creator>Mungkin, Moranain</dc:creator><dc:creator>Dayana, Indri</dc:creator><dc:creator>Ramdan, Dadan</dc:creator><dc:creator>Maizana, Dina</dc:creator><dc:creator>Syafii, Syafii</dc:creator><dc:description>&lt;jats:p&gt;Photovoltaic (PV) installations and wind turbines that are installed on the rooftops of buildings need to be protected because the layout is in a high position and there is a risk of being struck by lightning. Therefore, a more effective protection system is designed to anticipate electronic damage and fire on all materials in the distribution network, especially the addition of PV and wind turbine installations on building roofs. The purpose of this study is to simulate a lightning protection system on the distribution network and the results of on-grid PV energy conversion using electrical transient analyzer program (ETAP) software. Feeder relay delay times and cascade coordination patterns between outgoing and incoming relays do not overlap. the delay time of the relay working on the feeder is 0.31 s and the coordination pattern of the outgoing relay and incoming relay does not touch each other, so the delay time for the incoming relay is 2.73 s. Then testing the results of PV energy conversion connected to the grid using MATLAB Simulink monitoring obtained data reaching 1.600 Wp at peak power with sun conditions parallel to the PV installation layout.&lt;/jats:p&gt;</dc:description><dc:publisher>Institute of Advanced Engineering and Science</dc:publisher><dc:date>2024-02-01</dc:date><dc:type>info:eu-repo/semantics/article</dc:type><dc:format>application/pdf</dc:format><dc:identifier>https://doi.org/10.11591/ijece.v14i1.pp66-74</dc:identifier><dc:identifier>10.11591/ijece.v14i1.pp66-74</dc:identifier><dc:source>International Journal of Electrical and Computer Engineering (IJECE); Vol 14 No 1 (2024); 66</dc:source><dc:source>2722-2578</dc:source><dc:source>2088-8708</dc:source><dc:relation>https://ijece.iaescore.com/index.php/IJECE/article/viewFile/33986/17060</dc:relation><dc:rights>http://creativecommons.org/licenses/by-sa/4.0</dc:rights></oai_dc:dc>